X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-065-26636

Well Details

Well ID: 37-065-26636
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Washington Township
Operator Name: FARRINGTON & HEPLER GAS & OIL INC
Well Pad ID:
Farm/Lease Name: WHEELER 28
License Status:
Spud Date: 2009-03-26
Permit Date: 2009-02-24
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.139839
Longitude: -78.860048

For data sources see[1][2][3]

Well History

Date Event
2009-02-24 New Permit Application
2009-03-26 Performed Spud Operation
2009-03-31 Drilling Completion
2011-05-19 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 FARRINGTON & HEPLER GAS & OIL INC 1,284.00 365 0.00 0 0.00 0
2012 FARRINGTON & HEPLER GAS & OIL INC 42.71 365 0.00 0 0.00 0
2013 FARRINGTON & HEPLER GAS & OIL INC 0.2 365 0.00 0 0.00 0
2014 FARRINGTON & HEPLER GAS & OIL INC 0.2 365 0.00 0 0.00 0
2015 FARRINGTON & HEPLER GAS & OIL INC 0.2 365 0.00 0 0.00 0
2018 FARRINGTON & HEPLER GAS & OIL INC 1,653.40 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 FARRINGTON & HEPLER GAS & OIL INC Produced Fluid 29.64 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301357
2012 FARRINGTON & HEPLER GAS & OIL INC Produced Fluid 4.17 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1940742 Primary Facility 2011-01-04 Routine/Complete Inspection Violation(s) Noted
1944401 Primary Facility 2011-01-20 Compliance Evaluation No Violations Noted
1995530 Primary Facility 2011-08-11 Routine/Complete Inspection Violation(s) Noted
2023327 Primary Facility 2011-11-22 Compliance Evaluation Violation(s) Noted
2037564 Primary Facility 2012-01-19 Compliance Evaluation Outstanding Violations - Viols Req'd
2042258 Primary Facility 2012-02-07 Compliance Evaluation Outstanding Violations - Viols Req'd
2051530 Primary Facility 2012-03-15 Compliance Evaluation Outstanding Violations - No Viols Req'd
2068815 Primary Facility 2012-05-16 Compliance Evaluation Outstanding Violations - No Viols Req'd
2083514 Primary Facility 2012-07-16 Follow-up Inspection Outstanding Violations - No Viols Req'd
2105531 Primary Facility 2012-10-03 Follow-up Inspection Outstanding Violations - No Viols Req'd
2154355 Primary Facility 2013-03-28 Follow-up Inspection Outstanding Violations - No Viols Req'd
2156992 Primary Facility 2013-04-15 Follow-up Inspection Outstanding Violations - No Viols Req'd
2168511 Primary Facility 2013-05-07 Routine/Partial Inspection Outstanding Violations - No Viols Req'd
2285145 Primary Facility 2014-07-02 Follow-up Inspection Outstanding Violations - No Viols Req'd
2302068 Primary Facility 2014-09-09 Follow-up Inspection Outstanding Violations - No Viols Req'd
2413607 Primary Facility 2015-10-06 Compliance Evaluation No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1940742 602393 01/04/2011 2011-01-04 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative
1995530 617737 08/11/2011 2011-08-11 78.62 - Improper encapsulation of waste Administrative 78.62(a)(17)
2023327 625880 11/22/2011 2011-11-22 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety 102.4(b)(1)
2023327 625881 11/22/2011 2011-11-22 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. Administrative
2023327 625882 11/22/2011 2011-11-22 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. Administrative
2023327 625884 11/22/2011 2011-11-22 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety
2037564 630562 01/19/2012 2012-01-19 206EQUIPRMVL - Failure to remove equipment within 9 months of completion of drilling or plugging Administrative
2042258 631956 02/07/2012 2012-02-07 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety 402(a)

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
602393 266726 NOV - Notice of Violation Comply/Closed 2014-08-14
617737 277453 NOV - Notice of Violation Comply/Closed 2015-10-06
625880 278428 NOV - Notice of Violation Comply/Closed 2015-10-06
625881 278428 NOV - Notice of Violation Comply/Closed 2015-10-06
625882 278428 NOV - Notice of Violation Comply/Closed 2015-10-06
625884 278428 NOV - Notice of Violation Comply/Closed 2015-10-06
630562 280633 NOV - Notice of Violation Comply/Closed 2013-03-28
631956 280632 NOV - Notice of Violation Comply/Closed 2014-07-02

For data sources see[7]

References