If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-065-27007 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.194878,"lon":-78.784428,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Jefferson | |
Municipality: Washington Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 148372 | |
Farm/Lease Name: FRANO | |
License Status: Active | |
Spud Date: 2012-10-23 | |
Permit Date: 2012-10-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.194878 | |
Longitude: -78.784428 |
Date | Event |
---|---|
2012-10-18 | New Permit Application |
2012-10-20 | Performed Spud Operation |
2013-02-08 | New Permit Application |
2013-05-21 | Drilling Completion |
2013-07-16 | Perforation |
2013-07-16 | Performed Stage 1 of Stimulation |
2013-07-16 | Performed Stage 2 of Stimulation |
2013-07-16 | Performed Stage 3 of Stimulation |
2013-07-17 | Perforation |
2013-07-17 | Performed Stage 4 of Stimulation |
2013-07-17 | Performed Stage 5 of Stimulation |
2013-07-17 | Performed Stage 6 of Stimulation |
2013-07-17 | Performed Stage 7 of Stimulation |
2013-07-17 | Performed Stage 8 of Stimulation |
2013-07-18 | Perforation |
2013-07-18 | Performed Stage 10 of Stimulation |
2013-07-18 | Performed Stage 9 of Stimulation |
2013-07-22 | Perforation |
2013-07-22 | Performed Stage 11 of Stimulation |
2013-07-22 | Performed Stage 12 of Stimulation |
2013-07-22 | Performed Stage 13 of Stimulation |
2013-07-23 | Perforation |
2013-07-23 | Performed Stage 14 of Stimulation |
2013-07-23 | Performed Stage 15 of Stimulation |
2013-07-23 | Performed Stage 16 of Stimulation |
2013-07-23 | Performed Stage 17 of Stimulation |
2013-07-23 | Performed Stage 18 of Stimulation |
2013-07-24 | Perforation |
2013-07-24 | Performed Stage 19 of Stimulation |
2013-07-24 | Performed Stage 20 of Stimulation |
2013-07-24 | Performed Stage 21 of Stimulation |
2013-07-24 | Performed Stage 22 of Stimulation |
2013-07-25 | Perforation |
2013-07-25 | Performed Stage 23 of Stimulation |
2013-07-25 | Performed Stage 24 of Stimulation |
2013-07-26 | Perforation |
2013-07-26 | Performed Stage 25 of Stimulation |
2013-07-26 | Performed Stage 26 of Stimulation |
2013-07-26 | Performed Stage 27 of Stimulation |
2013-07-26 | Performed Stage 28 of Stimulation |
2013-07-26 | Performed Stage 29 of Stimulation |
2013-07-27 | Perforation |
2013-07-27 | Performed Stage 30 of Stimulation |
2013-07-27 | Performed Stage 31 of Stimulation |
2013-07-27 | Performed Stage 32 of Stimulation |
2013-07-27 | Performed Stage 33 of Stimulation |
2013-07-28 | Perforation |
2013-07-28 | Performed Stage 34 of Stimulation |
2013-07-28 | Performed Stage 35 of Stimulation |
2013-07-28 | Performed Stage 36 of Stimulation |
2013-07-28 | Performed Stage 37 of Stimulation |
2013-07-28 | Performed Stage 38 of Stimulation |
2013-07-29 | Perforation |
2013-07-29 | Performed Stage 39 of Stimulation |
2013-07-29 | Performed Stage 40 of Stimulation |
2019-07-08 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-15 | 2013-07-29 | 6,723 | 9,468,420 | 444,110 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AI-2 | Nabors | Protects Casing | Propargyl Alcohol | 107-19-7 | 30 | 0.00015 | 0 |
Isopropanol | 67-63-0 | 30 | 0.00015 | 0 | ||||
Ethylene Glycol | 111-76-2 | 30 | 0.00015 | 0 | ||||
LSG-100L | Nabors | Adds viscosity to fluid | Solvent Naptha, petroleum, heavy aliph | 64742-47-8 | 65 | 0.00663 | 0 | |
Water | Nabors | Carrier | Water | 7732-18-5 | 100 | 89.4314 | 0 | |
KR-153SL | Nabors | Eliminates bacteria in water sources | 2,2-Dibromo-3-nitrilo-propionamide (DBNPA) | 10222-01-2 | 20 | 0.00457 | 0 | |
Polyethylene glycol (PEG) | 25322-68-3 | 50 | 0.01143 | 0 | ||||
OB-2 | Nabors | Reduces viscosity of the fluid | Ammonium Persulfate | 7727-54-0 | 100 | 0.00213 | 0 | |
Sand | Nabors | Proppant | Crystalline Silica | 14808-60-7 | 100 | 10.158 | 0 | |
WFR-3B | Nabors | Reduces friction between pipe and fluid | Ethoxylated alcohols | 68551-12-2 | 15 | 0.01387 | 0 | |
Ethoxylated oleylamine | 26635-93-8 | 5 | 0.00462 | 0 | ||||
Hydrotreated light distillates (petroleum) | 64742-47-8 | 50 | 0.04622 | 0 | ||||
28% HCL | Nabors | Dissolves cement & minerals in perforations | Hydrochloric Acid | 7647-01-0 | 15 | 0.03815 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-07-16 | 1 | Sand | 5,310,984 | 8,186 | 8,467 |
2013-07-16 | 2 | Sand | 5,310,984 | 8,007 | 8,306 |
2013-07-16 | 3 | Sand | 5,310,984 | 7,888 | 8,247 |
2013-07-17 | 4 | Sand | 5,310,984 | 8,147 | 8,423 |
2013-07-17 | 5 | Sand | 5,310,984 | 8,074 | 8,335 |
2013-07-17 | 6 | Sand | 5,310,984 | 8,005 | 8,203 |
2013-07-17 | 7 | Sand | 5,310,984 | 8,184 | 8,423 |
2013-07-17 | 8 | Sand | 5,310,984 | 8,174 | 8,328 |
2013-07-18 | 9 | Sand | 5,310,984 | 8,103 | 8,347 |
2013-07-18 | 10 | Sand | 5,310,984 | 8,038 | 8,335 |
2013-07-22 | 11 | Sand | 5,310,984 | 7,924 | 8,232 |
2013-07-22 | 12 | Sand | 5,310,984 | 7,731 | 7,947 |
2013-07-22 | 13 | Sand | 5,310,984 | 7,398 | 7,690 |
2013-07-23 | 14 | Sand | 5,310,984 | 7,605 | 7,874 |
2013-07-23 | 15 | Sand | 5,310,984 | 7,372 | 7,815 |
2013-07-23 | 16 | Sand | 5,310,984 | 7,197 | 7,478 |
2013-07-23 | 17 | Sand | 5,310,984 | 7,233 | 7,610 |
2013-07-23 | 18 | Sand | 5,310,984 | 7,283 | 7,551 |
2013-07-24 | 19 | Sand | 5,310,984 | 7,255 | 7,478 |
2013-07-24 | 20 | Sand | 5,310,984 | 7,294 | 7,544 |
2013-07-24 | 21 | Sand | 5,310,984 | 7,403 | 7,581 |
2013-07-24 | 22 | Sand | 5,310,984 | 7,325 | 7,771 |
2013-07-25 | 23 | Sand | 5,310,984 | 7,338 | 7,595 |
2013-07-25 | 24 | Sand | 5,310,984 | 7,481 | 7,742 |
2013-07-26 | 25 | Sand | 5,310,984 | 7,366 | 7,661 |
2013-07-26 | 26 | Sand | 5,310,984 | 7,167 | 7,463 |
2013-07-26 | 27 | Sand | 5,310,984 | 7,077 | 7,258 |
2013-07-26 | 28 | Sand | 5,310,984 | 7,012 | 7,244 |
2013-07-26 | 29 | Sand | 5,310,984 | 7,035 | 7,317 |
2013-07-27 | 30 | Sand | 5,310,984 | 7,274 | 7,581 |
2013-07-27 | 31 | Sand | 5,310,984 | 7,111 | 7,339 |
2013-07-27 | 32 | Sand | 5,310,984 | 7,024 | 7,419 |
2013-07-27 | 33 | Sand | 5,310,984 | 7,098 | 7,375 |
2013-07-28 | 34 | Sand | 5,310,984 | 6,879 | 7,375 |
2013-07-28 | 35 | Sand | 5,310,984 | 6,827 | 7,170 |
2013-07-28 | 36 | Sand | 5,310,984 | 6,683 | 6,907 |
2013-07-28 | 37 | Sand | 5,310,984 | 6,748 | 7,031 |
2013-07-28 | 38 | Sand | 5,310,984 | 6,772 | 7,196 |
2013-07-29 | 39 | Sand | 5,310,984 | 6,911 | 7,332 |
2013-07-29 | 40 | Sand | 5,310,984 | 7,964 | 8,687 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | EQT PROD CO | 693,651.00 | 145 | 0.00 | 0 | 0.00 | 0 |
2014 | EQT PROD CO | 995,847.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EQT PROD CO | 595,860.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 645,552.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 490,772.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 548,712.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 456,800.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | EQT PROD CO | Drilling Fluid Waste | 4,356.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EQT PROD CO | Produced Fluid | 110.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EQT PROD CO | Produced Fluid | 21,599.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EQT PROD CO | Produced Fluid | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2013 | EQT PROD CO | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2013 | EQT PROD CO | Produced Fluid | 388.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | EQT PROD CO | Fracing Fluid Waste | 7,612.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EQT PROD CO | Produced Fluid | 300.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2013 | EQT PROD CO | Produced Fluid | 1,398.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | EQT PROD CO | Produced Fluid | 8,258.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EQT PROD CO | Produced Fluid | 312.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2014 | EQT PROD CO | Produced Fluid | 50.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2014 | EQT PROD CO | Produced Fluid | 417.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24076 |
2014 | EQT PROD CO | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24355 |
2014 | EQT PROD CO | Fracturing Fluid Waste | 1.00 Tons | LANDFILL | 101397 |
2014 | EQT PROD CO | Produced Fluid | 3,218.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2014 | EQT PROD CO | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3097 |
2014 | EQT PROD CO | Produced Fluid | 839.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | EQT PROD CO | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | EQT PROD CO | Produced Fluid | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2015 | EQT PROD CO | Produced Fluid | 130.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2015 | EQT PROD CO | Produced Fluid | 410.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2015 | EQT PROD CO | Produced Fluid | 130.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | EQT PROD CO | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | EQT PROD CO | Produced Fluid | 130.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24355 |
2015 | EQT PROD CO | Produced Fluid | 108.00 Bbl | INJECTION DISPOSAL WELL | 34-007-23262 |
2015 | EQT PROD CO | Produced Fluid | 260.00 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2015 | EQT PROD CO | Produced Fluid | 410.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | EQT PROD CO | Produced Fluid | 3,945.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 55.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Fracturing Fluid Waste | 280.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Produced Fluid | 2,066.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Fracturing Fluid Waste | 1,340.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 1,243.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | EQT PROD CO | Synthetic Liner Materials | 53.42 Tons | LANDFILL | 101397 |
2016 | EQT PROD CO | Produced Fluid | 3,201.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | EQT PROD CO | Produced Fluid | 3,869.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 110.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Produced Fluid | 635.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Produced Fluid | 150.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 111.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EQT PROD CO | Produced Fluid | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 301.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 2,639.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | EQT PROD CO | Produced Fluid | 121.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | EQT PROD CO | Produced Fluid | 130.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | EQT PROD CO | Produced Fluid | 931.15 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 54.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EQT PROD CO | Produced Fluid | 173.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 3.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019 | EQT PROD CO | Produced Fluid | 41.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | EQT PROD CO | Produced Fluid | 178.81 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | EQT PROD CO | Produced Fluid | 1,431.75 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 80.00 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 166.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2112811 | Primary Facility | 2012-10-23 | Drilling/Alteration | No Violations Noted | |
2112813 | Primary Facility | 2012-10-25 | Drilling/Alteration | No Violations Noted | |
2112815 | Primary Facility | 2012-10-31 | Drilling/Alteration | No Violations Noted | |
2114131 | Primary Facility | 2012-11-07 | Routine/Complete Inspection | No Violations Noted | |
2171058 | Primary Facility | 2013-05-30 | Routine/Partial Inspection | No Violations Noted | |
2174965 | Primary Facility | 2013-06-11 | Routine/Complete Inspection | No Violations Noted | |
2183900 | Primary Facility | 2013-06-27 | Routine/Partial Inspection | No Violations Noted | |
2194854 | Primary Facility | 2013-07-18 | Routine/Partial Inspection | No Violations Noted | |
2209053 | Primary Facility | 2013-09-26 | Administrative/File Review | Violation(s) Noted | |
2298740 | Primary Facility | 2014-08-06 | Administrative/File Review | No Violations Noted | |
2405948 | Primary Facility | 2015-09-08 | Routine/Complete Inspection | No Violations Noted | |
2538342 | Primary Facility | 2016-11-17 | Site Restoration | No Violations Noted | |
2694425 | Primary Facility | 2018-02-14 | Routine/Complete Inspection | No Violations Noted | Inspected location. Compressor operating. Well is producing. |
2770456 | Primary Facility | 2018-09-04 | Administrative/File Review | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2209053 | 679513 | 09/26/2013 | 2013-09-26 | 212WELLRCD - Failure to submit well record within 30 days of completion of drilling | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
679513 | 302984 | NOV - Notice of Violation | Comply/Closed | 2014-01-13 | |||
679513 | 306634 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2014-01-13 | 2014-01-13 | $1,000.00 | $1,000.00 |
For data sources see[9]