If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20172 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.327089,"lon":-76.718226,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Shrewsbury Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148496 | |
Farm/Lease Name: HAZLAK 8497H | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2009-06-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.327089 | |
Longitude: -76.718226 |
Date | Event |
---|---|
2009-06-02 | New Permit Application |
2009-12-18 | Performed Spud Operation |
2010-02-05 | Drilling Completion |
2010-06-13 | Perforation |
2010-10-01 | DEVIATED |
2011-05-20 | NEWLY DRILLED |
2014-05-06 | Drilling Completion |
2016-05-09 | FULLY PLUGGED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 17,475.00 | 188 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 5,975.00 | 182 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | XTO ENERGY INC | Fracing Fluid Waste | 5,024.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 4,976.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | XTO ENERGY INC | Drilling Fluid Waste | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | XTO ENERGY INC | Drilling Fluid Waste | 126.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | XTO ENERGY INC | Fracing Fluid Waste | 29,786.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | XTO ENERGY INC | Produced Fluid | 624.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2011 | XTO ENERGY INC | Produced Fluid | 211.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-20114 |
2011 | XTO ENERGY INC | Produced Fluid | 2,559.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XTO ENERGY INC | Produced Fluid | 1,318.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | XTO ENERGY INC | Produced Fluid | 990.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 774.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid | 2,878.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 1,365.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 3,620.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | XTO ENERGY INC | Produced Fluid | 1,365.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Basic Sediment | 240.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | XTO ENERGY INC | Drill Cuttings | 385.00 Tons | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | XTO ENERGY INC | Servicing Fluid | 1,545.65 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Servicing Fluid | 112.03 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Servicing Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1864605 | Primary Facility | 2010-02-19 | Routine/Complete Inspection | No Violations Noted | |
1964238 | Primary Facility | 2011-04-06 | Routine/Partial Inspection | No Violations Noted | |
2062877 | Primary Facility | 2012-04-20 | Routine/Complete Inspection | No Violations Noted | |
2062904 | Primary Facility | 2012-04-24 | Routine/Complete Inspection | No Violations Noted | |
2064430 | Primary Facility | 2012-05-01 | Drilling/Alteration | No Violations Noted | |
2083387 | Primary Facility | 2012-07-12 | Routine/Complete Inspection | No Violations Noted | |
2133585 | Primary Facility | 2013-01-09 | Routine/Complete Inspection | No Violations Noted | |
2153056 | Primary Facility | 2013-03-26 | Routine/Complete Inspection | No Violations Noted | |
2259359 | Primary Facility | 2014-04-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2268394 | Primary Facility | 2014-05-06 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2271987 | Primary Facility | 2014-05-14 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2280704 | Primary Facility | 2014-06-23 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2303251 | Primary Facility | 2014-09-05 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2303255 | Primary Facility | 2014-09-11 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2394758 | Primary Facility | 2015-07-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection sunny sky, ~ 75° F. |
2407771 | Primary Facility | 2015-09-16 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 09:00, weather was sunny and warm. Met Company man Mike Hahn and inspected well and site. There was one well spudded on this location. The well was previously 081-plugged. I checked the vent stack port and casing at ground level with an Altair 5 Gas Meter calibrated on 9/11/15. Ground level reading was 0% methane. Vent reading was 68% methane. Discussed this with Mike Hahn. Left location @ 9:20. |
2411482 | Primary Facility | 2015-09-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | 5% methane at candy cane. |
2422934 | Primary Facility | 2015-11-05 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 14:00, temperatures in 70’s, beautiful day. There was one well spudded on this location. The well was previously plugged. I checked the vent stack port with an Altair 5X Gas Meter calibrated on 10/27/15. Vent reading was 3% methane. Left location @14:12 |
2428052 | Primary Facility | 2015-11-24 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 14:15, weather cloudy and cold. There was one well spudded on this location. The well was previously plugged. I checked the vent stack port with an Altair 5X Gas Meter calibrated on 11/24/15. Vent reading was 0% methane. Left location @14:20 |
2428622 | Primary Facility | 2015-11-30 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Arrived at 15:20, weather cloudy and cool. There was one well spudded on this location. The well was previously plugged. I checked the vent stack port with an Altair 5X Gas Meter calibrated on 11/24/15. Vent reading was 3% methane. Left location @ 15:30 |
2444451 | Primary Facility | 2016-01-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | AArrived at 13:40, weather cloudy and cool. There was one well spudded on this location. The well was previously plugged. I checked the vent stack port with an Altair 5X Gas Meter calibrated on 01/28/16. Vent reading was 7% LEL, or approximately 0.35% methane. I also met with the property owner and updated him on the timeline for restoring the site. Left location @ 14:05. |
2464842 | Primary Facility | 2016-03-15 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection, the well (081-20172) was plugged and cut off below plow depth. The site was being reclaimed and returned to approximate original contours. An infiltration trench and a vegetative filter strip have been left in place while the main earthmoving is being completed. No E&S issues were observed. No Violations Noted. |
2501112 | Primary Facility | 2016-07-12 | Complaint Inspection | No Violations Noted | Complaint inspection (CID 320890); 7/12/2016.
Dan Harvey (DEP) and I met with the complainant, Mike Hahn (XTO), and Mike Vale (XTO consultant). At the time of the inspection, the well site was reclaimed to approximate original contours and seeded and stabilized. The E&S module from 2009 does not include any relevant details or a plan of the final reclamation (after wells are plugged) of the well site. The complainant had 4 major concerns about the well site including the vegetation, topsoil, existing surface rock/piles, and the restoration of a pre-existing drainage swale. XTO agreed to install the 10’ wide drainage swale as designed in the plans attached. These plans were provided to the complainant for approval but were not previously submitted to the Department. We all agree that the designed swale will adequately restore the site to its approximate pre-construction condition and function. XTO also agreed to re-grade a portion of the rock pile/rock outcrop (41-19-40.90N, -76-43-07.66W) in the field |
2502504 | Primary Facility | 2016-07-18 | Routine/Complete Inspection | No Violations Noted | Complaint inspection (CID 320890); 7/18/2016.
I arrived onsite at 10:45 and met with Mike Hahn (XTO) and the construction contractor. The swale across the field had been installed and the operator was working on smoothing the area around the rock pile/ rock outcrop. The swale appears to be constructed as depicted in the plans attached to my last inspection (7/12/2016) of the site. No Violations Noted. |
2537429 | Primary Facility | 2016-11-04 | Routine/Complete Inspection | No Violations Noted | Well Site Restoration/NOT Inspection; 11/4/2016.
At the time of the inspection, the former well pad area was had been mowed and the warm season grasses turned brown. The site has been restored to approximate original conditions and is permanently stabilized. I recommend the Well Site Restoration Report and Notice of Termination be approved for this site. No Violations Noted. |
For data sources see[7]