Well ID: 37-081-20209
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Penn Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 148314
Farm/Lease Name: FALK UNIT 4H
License Status:
Spud Date:
Permit Date: 2009-10-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.272186
Longitude: -76.636589

For data sources see[1][2][3]

Well History

Date Event
2009-10-29 New Permit Application
2009-11-27 Performed Spud Operation
2009-12-17 Drilling Completion
2010-03-10 DEVIATED
2010-06-12 Perforation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2010 CHIEF OIL & GAS LLC 621,253.50 159 0.00 0 0.00 0
2011 EXCO RESOURCES PA LLC 817,707.00 305 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 784,113.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 646,194.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 499,997.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 410,281.00 342 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 313,260.00 275 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 284,198.00 337 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 259,348.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 187,158.00 364 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 CHIEF OIL & GAS LLC Drilling 2,428.00 Bbl Brine or Industrial Waste Treatment Plt PA0008451
2010 CHIEF OIL & GAS LLC Produced Fluid 460.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Produced Fluid 1,790.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 1,815.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Produced Fluid 179.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 2,262.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 EXCO RESOURCES PA LLC Produced Fluid 317.75 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 EXCO RESOURCES PA LLC Produced Fluid 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2012 EXCO RESOURCES PA LLC Produced Fluid 1,197.17 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Fracturing Fluid Waste 407.67 Tons LANDFILL 301358
2012 EXCO RESOURCES PA LLC Drill Cuttings 33.94 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 87.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC024
2013 EXCO RESOURCES PA LLC Produced Fluid 161.76 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 273.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 359.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 2.34 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2014 EXCO RESOURCES PA LLC Produced Fluid 121.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EXCO RESOURCES PA LLC Produced Fluid 705.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 141.40 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 EXCO RESOURCES PA LLC Produced Fluid 331.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014 EXCO RESOURCES PA LLC Produced Fluid 33.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 EXCO RESOURCES PA LLC Produced Fluid 219.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC024
2014 EXCO RESOURCES PA LLC Produced Fluid 667.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 EXCO RESOURCES PA LLC Produced Fluid 36.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2015 EXCO RESOURCES PA LLC Produced Fluid 1,004.90 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 11.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EXCO RESOURCES PA LLC Produced Fluid 1,207.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 653.10 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 75.80 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 1,169.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 146.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EXCO RESOURCES PA LLC Produced Fluid 107.40 Bbl REUSE (AT WELL PAD)
2019 EXCO RESOURCES PA LLC Produced Fluid 443.80 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1929491 Primary Facility 2010-11-15 Follow-up Inspection No Violations Noted
1942094 Primary Facility 2011-01-06 Routine/Complete Inspection No Violations Noted
1942184 Primary Facility 2011-01-10 Routine/Complete Inspection Violation(s) Noted
1965789 Primary Facility 2011-04-13 Routine/Complete Inspection No Violations Noted
2051037 Primary Facility 2012-03-15 Routine/Complete Inspection No Violations Noted
2056688 Primary Facility 2012-04-02 Routine/Partial Inspection No Violations Noted
2069510 Primary Facility 2012-05-18 Routine/Complete Inspection No Violations Noted
2072691 Primary Facility 2012-06-01 Drilling/Alteration No Violations Noted
2076713 Primary Facility 2012-06-12 Routine/Complete Inspection No Violations Noted
2092496 Primary Facility 2012-08-15 Routine/Complete Inspection No Violations Noted
2100913 Primary Facility 2012-09-13 Routine/Complete Inspection No Violations Noted
2436746 Primary Facility 2015-12-30 Routine/Complete Inspection No Violations Noted Arrived @ 11:40. Weather: foggy, cloudy, some fine drizzle. Five wells, formerly in production, were shut-in. Lease tender Bobby Hamel was onsite pumping rain water out of the containment around the produced water tank. All well cellars were filled with gravel. There were two open annular vents at each well. The 13-3/8” x 9-5/8” was vented with a 1” pipe. The 9-5/8” x 5-1/2” annulus was vented with a 2” pipe. The annuli were monitored with an Altair 5X gas meter calibrated on 12/28/15.
2543933 Primary Facility 2016-12-08 Routine/Complete Inspection No Violations Noted Routine Inspection; 12/8/2016. I entered the location at 10:06 and began the inspection. At the time of the inspection, the Falk Unit 1H (081-20144), 2H (081-20180), 3H (081-20205), 4H (20209) and 5H(081-20210)wells were in production. The well pad area was relatively well vegetated but some erosion was noted along the access road and one of the basins onsite was had a fair amount of standing water. The well site has not been restored and the Well Site Compliance Information Request reply (submitted 9/21/2015) says an ESCGP-2 was to be submitted in the fall of 2015. The well pad remains at its original size and the site currently does not conform to the permitted restoration plan. The original E&S permit has been expired since 10/16/2014.
 The Department considers a well site to be restored under Section 3216(c) of the 2012 Oil and Gas Act when the oil or gas owners or operators meet the following:
1. All permanent post construction stormwater control features as identified in the Post Construction
2774020 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Five wells staged for production phase. Five each water separators. The 2H well is using a sand separator. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Methanol tank in use on 2H well. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1942184 602823 01/10/2011 2011-01-10 78.85 - Inadequate, insufficient, and/or improperly installed cement Environmental Health & Safety 18 psi on the 5 1/2 x 9 5/8 and may be connected to other annuli such as the 9 5/8 x 13 3/8 annulus. stone in cellar. Steven Travis from American Peak Production who was present told me that he is not certain that the pressure is limited to only annulus
1942184 602824 01/10/2011 2011-01-10 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative 18 psi on the 5 1/2 x 9 5/8 and may be connected to other annuli such as the 9 5/8 x 13 3/8 annulus. stone in cellar. Steven Travis from American Peak Production who was present told me that he is not certain that the pressure is limited to only annulus

For data sources see[7]