X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20352

Well Details

Well ID: 37-081-20352
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Franklin Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 150883
Farm/Lease Name: WARNER UNIT 3H
License Status:
Spud Date:
Permit Date: 2010-12-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.237783
Longitude: -76.600508

For data sources see[1][2][3]

Well History

Date Event
2010-12-09 New Permit Application
2011-05-17 Perforation
2011-06-09 New Permit Application
2011-06-24 Performed Spud Operation
2011-11-18 Drilling Completion
2013-12-05 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-12-17 2012-12-17 5,294 3,776,573

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Calfrac Well Services Propping Agent
DAP-925 Calfrac Well Services Acid Corrosion Inhibitor
DAP-901 Calfrac Well Services Scale Inhibitor
DWP-944 Calfrac Well Services Biocide
DWP-612 Calfrac Well Services Friction Reducer
Water BaseFluid/Mix Water Water 7732-18-5 100.00 94.99
FracBlack HT Propping Agent Copolymer resin 100.00 0.53
DAP-103 Calfrac Well Services Iron Control
Hydrochloric Acid Calfrac Well Services Clean Perforations Organic phosphonate 2 10.00 0.00206000
Ammonium chloride 12125-02-9 10.00 0.00124000
Goethite 1310-14-1 0.10 0.00246000
Oxyalkylated polyamine 5.00 0.00103000
Apatite 64476-38-6 0.10 0.00203000
Polyoxyalkylenes surfactant 5.00 0.00519000
Sodium chloride 7647-14-5 1.00 0.00002000
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 40.00 0.01
Nonionic surfactant 5.00 0.00519000
Formalin 50-00-0 0.10 0.00004000
Ilmenite (FeTiO3), conc. 98072-94-7 0.10 0.00182000
Quartz 14808-60-7 100.00 3.91
Organic phosphonate 1 30.00 0.00618000
Biotite 1302-27-8 0.10 0.00203000
Polyethylene glycol 25322-68-3 70.00 0.01
Illite 12173-60-3 1.00 0.00492000
Olefin 5.00 0.00011000
Thiourea polymer 68527-49-1 30.00 0.00065000
Hydrochloric acid 7647-01-0 37.00 0.45
Polyoxyalkylenes 30.00 0.00065000
Propargyl Alcohol 10.00 0.00022000
Polyacrylamide polymer 40.00 0.04
Amine salt 5.00 0.00103000
Citric acid 77-92-9 60.00 0.00457000
Fatty acids 30.00 0.00065000
Carbonic acid calcium salt (1:1) 471-34-1 1.00 0.00444000
Acetic acid 64-19-7 1.00 0.00021000
Methanol 67-56-1 60.00 0.00748000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 71,553.00 219 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 134,830.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 82,294.00 244 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 60,602.00 202 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 95,806.00 337 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 94,081.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 83,666.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 EXCO RESOURCES PA LLC Drilling Fluid Waste 790.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Drilling Fluid Waste 262.38 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 328.56 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2013 EXCO RESOURCES PA LLC Produced Fluid 219.04 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EXCO RESOURCES PA LLC Produced Fluid 109.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC024
2013 EXCO RESOURCES PA LLC Produced Fluid 1,152.02 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 EXCO RESOURCES PA LLC Fracing Fluid Waste 1,488.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EXCO RESOURCES PA LLC Produced Fluid 423.78 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Fracturing Fluid Waste 43.68 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 1,447.56 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 1,210.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 550.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 EXCO RESOURCES PA LLC Produced Fluid 364.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC024
2014 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EXCO RESOURCES PA LLC Produced Fluid 891.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 EXCO RESOURCES PA LLC Produced Fluid 1,302.90 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EXCO RESOURCES PA LLC Produced Fluid 1,480.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 1,029.80 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 1,175.30 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 122.90 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EXCO RESOURCES PA LLC Produced Fluid 967.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 250.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2003800 Primary Facility 2011-09-12 Follow-up Inspection No Violations Noted
2064902 Primary Facility 2012-05-03 Routine/Complete Inspection No Violations Noted
2072050 Primary Facility 2012-05-31 Routine/Complete Inspection No Violations Noted
2077074 Primary Facility 2012-06-12 Routine/Complete Inspection No Violations Noted
2081350 Primary Facility 2012-07-02 Routine/Complete Inspection No Violations Noted
2091255 Primary Facility 2012-08-13 Drilling/Alteration No Violations Noted
2098758 Primary Facility 2012-09-11 Routine/Partial Inspection No Violations Noted
2123246 Primary Facility 2012-12-06 Routine/Complete Inspection No Violations Noted
2130029 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted
2132665 Primary Facility 2013-01-16 Follow-up Inspection No Violations Noted
2136668 Primary Facility 2013-01-24 Incident- Response to Accident or Event No Violations Noted
2152179 Primary Facility 2013-03-29 Routine/Complete Inspection No Violations Noted
2177920 Primary Facility 2013-06-25 Routine/Complete Inspection No Violations Noted
2184122 Primary Facility 2013-07-16 Routine/Complete Inspection No Violations Noted
2200832 Primary Facility 2013-08-13 Routine/Partial Inspection No Violations Noted diesel spill to pad. excavated and field corfirmed w/ PID. VIOIC to 1H
2435527 Primary Facility 2015-12-04 Routine/Complete Inspection No Violations Noted I arrived onsite at 09:51. Five of the six wells on the pad were in production. The tank pad (located to the southwest of the well pad) remains in place yet no work has been done on any of the wells since July 2013. According to the well records, drilling on the last well (081-20492) was completed on 12/7/2011 and there are no other active well permits for this well site. Section 3216 (c) requires that "within nine months after completion of drilling of a well, the owner or operator shall restore the well site." The Well Site Restoration assessment summary indicates that a new well permit was to be submitted to the Department Fall 2015. As of the date of this inspection report, no well permit applications are pending or have been issued according to eFacts. In order to bring the well site into compliance, the Department recommends that EXCO restore the well site in accordance with Section 3216(c) or comply with the restoration schedule as submitted.
2492500 Primary Facility 2016-06-09 Routine/Complete Inspection No Violations Noted Arrived @ 09:00. Weather sunny and warm. No company representatives were present at the time of the inspection. Two of the six wells on site (4H and 5H) were in production.

Warner Unit 3H: Gravel cellar. Top gauge: 284 psi (digital), 5-1/2” gauge: 319 psi (digital). Annular vents (13-3/8” x 9-5/8” and 9-5/8” x 5-1/2”) were monitored for methane with an Altair 5X gas multimeter (calibrated on 5/23/16). No gas was detected. No violations were observed at the time of this inspection. Left location @ 09:30.

2568240 Primary Facility 2017-03-06 Routine/Complete Inspection No Violations Noted Routine Inspection; 3/6/2017.Dan Harvey (DEP) and I arrived onsite at 09:00 and met with the landowner. Five of the six wells on the pad were in production. The tank pad has been removed and the site has been restored in accordance with the ESCGP which was upgraded to include Post Construction Stormwater Management (PCSM). The site is well vegetated but has not quite reached >70% uniform perennial vegetative growth.

We discussed the PCSM features and maximizing the amount of area that can be restored to crop production. A long rock pile and a steep water bar at the northwest corner (near the entrance off SR118) of the well pad have not been restored back to approximate original contours. I recommend moving the rock pile onto the well pad and smoothing the water bar/soil stockpile so that the area can return to agricultural production. The landowner and the operator have already coordinated on the removal of silt sock on the site so that the fields can be returned to agricultural production. No Violation

2816689 Primary Facility 2018-12-18 Routine/Complete Inspection No Violations Noted Three wells stage for production. Three GPUs not within containment. No leaks detected from production equipment. No violations noted.
2817245 Primary Facility 2018-12-18 Routine/Complete Inspection No Violations Noted Five wells staged for production. One well in regulatory inactive status. Six GPUs not within containment. No leaks detected from production equipment. No violations noted.

For data sources see[8]

References