If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20352 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.237783,"lon":-76.600508,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Franklin Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 150883 | |
Farm/Lease Name: WARNER UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.237783 | |
Longitude: -76.600508 |
Date | Event |
---|---|
2010-12-09 | New Permit Application |
2011-05-17 | Perforation |
2011-06-09 | New Permit Application |
2011-06-24 | Performed Spud Operation |
2011-11-18 | Drilling Completion |
2013-12-05 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-12-17 | 2012-12-17 | 5,294 | 3,776,573 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Calfrac Well Services | Propping Agent | |||||
DAP-925 | Calfrac Well Services | Acid Corrosion Inhibitor | ||||||
DAP-901 | Calfrac Well Services | Scale Inhibitor | ||||||
DWP-944 | Calfrac Well Services | Biocide | ||||||
DWP-612 | Calfrac Well Services | Friction Reducer | ||||||
Water | BaseFluid/Mix Water | Water | 7732-18-5 | 100.00 | 94.99 | |||
FracBlack HT | Propping Agent | Copolymer resin | 100.00 | 0.53 | ||||
DAP-103 | Calfrac Well Services | Iron Control | ||||||
Hydrochloric Acid | Calfrac Well Services | Clean Perforations | Organic phosphonate 2 | 10.00 | 0.00206000 | |||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00124000 | |||||
Goethite | 1310-14-1 | 0.10 | 0.00246000 | |||||
Oxyalkylated polyamine | 5.00 | 0.00103000 | ||||||
Apatite | 64476-38-6 | 0.10 | 0.00203000 | |||||
Polyoxyalkylenes surfactant | 5.00 | 0.00519000 | ||||||
Sodium chloride | 7647-14-5 | 1.00 | 0.00002000 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | |||||
Nonionic surfactant | 5.00 | 0.00519000 | ||||||
Formalin | 50-00-0 | 0.10 | 0.00004000 | |||||
Ilmenite (FeTiO3), conc. | 98072-94-7 | 0.10 | 0.00182000 | |||||
Quartz | 14808-60-7 | 100.00 | 3.91 | |||||
Organic phosphonate 1 | 30.00 | 0.00618000 | ||||||
Biotite | 1302-27-8 | 0.10 | 0.00203000 | |||||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.01 | |||||
Illite | 12173-60-3 | 1.00 | 0.00492000 | |||||
Olefin | 5.00 | 0.00011000 | ||||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00065000 | |||||
Hydrochloric acid | 7647-01-0 | 37.00 | 0.45 | |||||
Polyoxyalkylenes | 30.00 | 0.00065000 | ||||||
Propargyl Alcohol | 10.00 | 0.00022000 | ||||||
Polyacrylamide polymer | 40.00 | 0.04 | ||||||
Amine salt | 5.00 | 0.00103000 | ||||||
Citric acid | 77-92-9 | 60.00 | 0.00457000 | |||||
Fatty acids | 30.00 | 0.00065000 | ||||||
Carbonic acid calcium salt (1:1) | 471-34-1 | 1.00 | 0.00444000 | |||||
Acetic acid | 64-19-7 | 1.00 | 0.00021000 | |||||
Methanol | 67-56-1 | 60.00 | 0.00748000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 71,553.00 | 219 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 134,830.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 82,294.00 | 244 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 60,602.00 | 202 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 95,806.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 94,081.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 83,666.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 790.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 262.38 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 328.56 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 219.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 109.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC024 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,152.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 1,488.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 423.78 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Fracturing Fluid Waste | 43.68 Tons | LANDFILL | 301358 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,447.56 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 1,210.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 550.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 364.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC024 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 891.70 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 1,302.90 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 1,480.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 1,029.80 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 1,175.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 122.90 Bbl | REUSE (AT WELL PAD) | |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 967.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 250.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2003800 | Primary Facility | 2011-09-12 | Follow-up Inspection | No Violations Noted | |
2064902 | Primary Facility | 2012-05-03 | Routine/Complete Inspection | No Violations Noted | |
2072050 | Primary Facility | 2012-05-31 | Routine/Complete Inspection | No Violations Noted | |
2077074 | Primary Facility | 2012-06-12 | Routine/Complete Inspection | No Violations Noted | |
2081350 | Primary Facility | 2012-07-02 | Routine/Complete Inspection | No Violations Noted | |
2091255 | Primary Facility | 2012-08-13 | Drilling/Alteration | No Violations Noted | |
2098758 | Primary Facility | 2012-09-11 | Routine/Partial Inspection | No Violations Noted | |
2123246 | Primary Facility | 2012-12-06 | Routine/Complete Inspection | No Violations Noted | |
2130029 | Primary Facility | 2013-01-10 | Routine/Complete Inspection | No Violations Noted | |
2132665 | Primary Facility | 2013-01-16 | Follow-up Inspection | No Violations Noted | |
2136668 | Primary Facility | 2013-01-24 | Incident- Response to Accident or Event | No Violations Noted | |
2152179 | Primary Facility | 2013-03-29 | Routine/Complete Inspection | No Violations Noted | |
2177920 | Primary Facility | 2013-06-25 | Routine/Complete Inspection | No Violations Noted | |
2184122 | Primary Facility | 2013-07-16 | Routine/Complete Inspection | No Violations Noted | |
2200832 | Primary Facility | 2013-08-13 | Routine/Partial Inspection | No Violations Noted | diesel spill to pad. excavated and field corfirmed w/ PID. VIOIC to 1H |
2435527 | Primary Facility | 2015-12-04 | Routine/Complete Inspection | No Violations Noted | I arrived onsite at 09:51. Five of the six wells on the pad were in production. The tank pad (located to the southwest of the well pad) remains in place yet no work has been done on any of the wells since July 2013. According to the well records, drilling on the last well (081-20492) was completed on 12/7/2011 and there are no other active well permits for this well site. Section 3216 (c) requires that "within nine months after completion of drilling of a well, the owner or operator shall restore the well site." The Well Site Restoration assessment summary indicates that a new well permit was to be submitted to the Department Fall 2015. As of the date of this inspection report, no well permit applications are pending or have been issued according to eFacts. In order to bring the well site into compliance, the Department recommends that EXCO restore the well site in accordance with Section 3216(c) or comply with the restoration schedule as submitted. |
2492500 | Primary Facility | 2016-06-09 | Routine/Complete Inspection | No Violations Noted | Arrived @ 09:00. Weather sunny and warm. No company representatives were present at the time of the inspection. Two of the six wells on site (4H and 5H) were in production.
Warner Unit 3H: Gravel cellar. Top gauge: 284 psi (digital), 5-1/2” gauge: 319 psi (digital). Annular vents (13-3/8” x 9-5/8” and 9-5/8” x 5-1/2”) were monitored for methane with an Altair 5X gas multimeter (calibrated on 5/23/16). No gas was detected. No violations were observed at the time of this inspection. Left location @ 09:30. |
2568240 | Primary Facility | 2017-03-06 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 3/6/2017.Dan Harvey (DEP) and I arrived onsite at 09:00 and met with the landowner. Five of the six wells on the pad were in production. The tank pad has been removed and the site has been restored in accordance with the ESCGP which was upgraded to include Post Construction Stormwater Management (PCSM). The site is well vegetated but has not quite reached >70% uniform perennial vegetative growth.
We discussed the PCSM features and maximizing the amount of area that can be restored to crop production. A long rock pile and a steep water bar at the northwest corner (near the entrance off SR118) of the well pad have not been restored back to approximate original contours. I recommend moving the rock pile onto the well pad and smoothing the water bar/soil stockpile so that the area can return to agricultural production. The landowner and the operator have already coordinated on the removal of silt sock on the site so that the fields can be returned to agricultural production. No Violation |
2816689 | Primary Facility | 2018-12-18 | Routine/Complete Inspection | No Violations Noted | Three wells stage for production. Three GPUs not within containment. No leaks detected from production equipment. No violations noted. |
2817245 | Primary Facility | 2018-12-18 | Routine/Complete Inspection | No Violations Noted | Five wells staged for production. One well in regulatory inactive status. Six GPUs not within containment. No leaks detected from production equipment. No violations noted. |
For data sources see[8]