If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20354 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.255475,"lon":-76.604389,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Franklin Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 147738 | |
Farm/Lease Name: ARTHUR UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-09-09 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.255475 | |
Longitude: -76.604389 |
Date | Event |
---|---|
2010-09-09 | New Permit Application |
2011-05-04 | Performed Spud Operation |
2011-09-02 | Drilling Completion |
2012-07-16 | Perforation |
2013-07-11 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-07-16 | 2012-07-16 | 6,499 | 8,061,546 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | DWP-612 | Calfrac Well Services | Friction Reducer | |||||
DWP-944 | Calfrac Well Services | Biocide | ||||||
Water | BaseFluid/Mix Water | Water | 7732-18-5 | 100.00 | 85.49 | |||
Sand (Proppant) | Calfrac Well Services | Propping Agent | ||||||
DAP-103 | Calfrac Well Services | Iron Control | ||||||
DAP-901 | Calfrac Well Services | Scale Inhibitor | ||||||
Hydrochloric Acid | Calfrac Well Services | Clean Perforations | Acetic acid | 64-19-7 | 1.00 | 0.00019000 | ||
Olefin | 5.00 | 0.00004000 | ||||||
Polyoxyalkylenes | 30.00 | 0.00026000 | ||||||
Amine salt | 5.00 | 0.00096000 | ||||||
Goethite | 1310-14-1 | 0.10 | 0.00762000 | |||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00026000 | |||||
Sodium chloride | 7647-14-5 | 1.00 | 0.00001000 | |||||
Citric acid | 77-92-9 | 60.00 | 0.00182000 | |||||
Polyacrylamide polymer | 40.00 | 0.02 | ||||||
Ilmenite (FeTiO3), conc. | 98072-94-7 | 0.10 | 0.00477000 | |||||
Nonionic surfactant | 5.00 | 0.00298000 | ||||||
Formalin | 50-00-0 | 0.10 | 0.00003000 | |||||
Organic phosphonate 2 | 10.00 | 0.00191000 | ||||||
Hydrochloric acid | 7647-01-0 | 37.00 | 0.18 | |||||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00115000 | |||||
Fatty acids | 30.00 | 0.00026000 | ||||||
Propargyl Alcohol | 10.00 | 0.00009000 | ||||||
Oxyalkylated polyamine | 5.00 | 0.00096000 | ||||||
Organic phosphonate 1 | 30.00 | 0.00574000 | ||||||
Biotite | 1302-27-8 | 0.10 | 0.00572000 | |||||
Carbonic acid calcium salt (1:1) | 471-34-1 | 1.00 | 0.01 | |||||
Methanol | 67-56-1 | 60.00 | 0.00625000 | |||||
Illite | 12173-60-3 | 1.00 | 0.01 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | |||||
Apatite | 64476-38-6 | 0.10 | 0.00572000 | |||||
Polyoxyalkylenes surfactant | 5.00 | 0.00298000 | ||||||
Quartz | 14808-60-7 | 100.00 | 14.19 | |||||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.01 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 154,445.00 | 93 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 676,769.00 | 303 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 629,308.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 455,992.00 | 306 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 352,366.00 | 278 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 358,092.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 318,739.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 275,102.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 125.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 480.01 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 1,971.18 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 816.18 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 728.55 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 7,234.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EXCO RESOURCES PA LLC | Drill Cuttings | 3.94 Tons | LANDFILL | 301358 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 312.14 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,604.71 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 109.52 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 109.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC024 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,517.07 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 2,490.45 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,518.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 440.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 219.50 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 219.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC024 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 750.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 440.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 165.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 155.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 165.60 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 20.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2002122 | Primary Facility | 2011-09-12 | Routine/Partial Inspection | No Violations Noted | |
2021373 | Primary Facility | 2011-11-21 | Routine/Complete Inspection | No Violations Noted | |
2043081 | Primary Facility | 2012-02-15 | Routine/Partial Inspection | No Violations Noted | |
2045292 | Primary Facility | 2012-02-21 | Routine/Complete Inspection | No Violations Noted | |
2049686 | Primary Facility | 2012-03-06 | Routine/Complete Inspection | No Violations Noted | |
2055056 | Primary Facility | 2012-03-29 | Follow-up Inspection | No Violations Noted | |
2055062 | Primary Facility | 2012-03-28 | Follow-up Inspection | No Violations Noted | |
2064896 | Primary Facility | 2012-05-03 | Routine/Complete Inspection | No Violations Noted | |
2072456 | Primary Facility | 2012-05-30 | Routine/Complete Inspection | No Violations Noted | |
2081206 | Primary Facility | 2012-07-03 | Follow-up Inspection | No Violations Noted | |
2090476 | Primary Facility | 2012-08-09 | Compliance Evaluation | No Violations Noted | |
2092258 | Primary Facility | 2012-08-16 | Routine/Partial Inspection | No Violations Noted | |
2123219 | Primary Facility | 2012-12-06 | Routine/Complete Inspection | No Violations Noted | |
2161205 | Primary Facility | 2013-04-25 | Routine/Complete Inspection | No Violations Noted | |
2469507 | Primary Facility | 2016-03-25 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection, the Arthur Unit 1H (081-20353), 2H (081-20354), and (081-20452) were in production. The tanks permitted under the WMGR123NC009 permit had at least 2 feet of freeboard.
Your reply to the Well Site Restoration Compliance Information Request indicates you will apply for a well permit in 2015 but, no well permits have been issued for the site since 11/30/2010. The well site was re-permitted with an ESCGP-2 in November 2015 to include stormwater management but those revisions have not yet been implemented. Currently, erosion is noted throughout the cut slope of the well pad and rock-lined ditches. The sedimentation basin’s slopes have little vegetation and several inches of sediment have accumulated in the bottom. The well site has not been restored. I recommend you implement the ESCGP-2 measures and address the erosion and lack of vegetative cover on the cut slope of the well pad. |
2502499 | Primary Facility | 2016-07-18 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 7/19/2016. At the time of the inspection, the Arthur Unit 1H (081-20353), Arthur Unit 2H (081-20354), and Arthur Unit 3H (081-20452) were in production. The PCSM (Post Construction Stormwater Management) plans were recently implemented as part of the ESCGP-2 issued in November of 2015. Construction has been completed and the area was seeded and stabilized. Stabilization was somewhat sparse in some areas. I recommend keeping an eye on these places and stabilizing further as needed. No Violations Noted. |
2544956 | Primary Facility | 2016-12-07 | Routine/Complete Inspection | No Violations Noted | Arrived @ 15:00. Weather sunny. No company representatives were present at the time of the inspection. A total of 3 wells onsite, all in production. All three had open annular vents for the 13-3/8” x 9-5/8” , and 9-5/8” x 5-1/2” annuli. The vents were monitored with an Altair 5X gas meter (calibrated on 12/6/16). No combustible gas was detected in any of the annular vents.
Arthur 1H: top gauge: 392 psi Arthur 2H: top gauge: 371 psi Arthur 3H: top gauge: 436 psi There were no vioations noted during this inspection. Left location @ 15:30. |
2816702 | Primary Facility | 2018-12-18 | Routine/Complete Inspection | No Violations Noted | Three wells stage for production. Three GPUs not within containment. No leaks detected from production equipment. No violations noted. |
For data sources see[8]