If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20371 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.205603,"lon":-76.642556,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Moreland Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148789 | |
Farm/Lease Name: LUCELLA 8564H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-09-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.205603 | |
Longitude: -76.642556 |
Date | Event |
---|---|
2010-09-27 | New Permit Application |
2010-12-19 | Performed Spud Operation |
2011-02-06 | Drilling Completion |
2011-04-14 | Perforation |
2012-03-06 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-05-11 | 2011-05-11 | 3,903 | 5,318,670 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Water | 7732-18-5 | 100.00 | 87.70 | |||
Acid - 7.5 HCl Acid | Skylkine Chemical Corp. | Cleaning | Hydrochloric acid | 7647-01-0 | 7.50 | 0.01 | ||
Water | 7732-18-5 | 92.50 | 0.18 | |||||
Whole Product | ||||||||
Acid Corrosion Inhibitor Plexhib 256 | Chemplex | Acid Corrosion Inhibitor | Methanol | 67-56-1 | 40.00 | 0.00014000 | ||
Propargyl alcohol | 107-19-7 | 8.00 | 0.00003000 | |||||
Other -(non hazardous) | 52.00 | 0.00018000 | ||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.00 | |||
Scale Inhibitor - Greenhib 677 | Chemplex | Scale Inhibitor | Other (75) | 75.00 | 0.01 | |||
Salt of phosphonomethylated diamine | 25.00 | 0.00618000 | ||||||
Acid Iron Chelating Agt Ferriplex 40 | Chemplex | Acid Iron Chelating | Sodium sulfate | 7757-82-6 | 2.00 | 0.00003000 | ||
Sodium hydroxide | 1310-73-2 | 1.00 | 0.00001000 | |||||
Other -(non hazardous) | 57.00 | 0.00073000 | ||||||
Nitrilotriacetic acid trisodium monohydrate | 18662-53-8 | 40.00 | 0.00051000 | |||||
Biocide - Plexcide 24L | Chemplex | Biocide | Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00706000 | ||
Sodium hydroxide | 1310-73-2 | 4.00 | 0.00118000 | |||||
Other (72) | 72.00 | 0.02 | ||||||
Friction Reducer - Plexslick 921 | Chemplex | Friction Reducer | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.00899000 | |||||
Other (70) | 70.00 | 0.02 | ||||||
Acid Non Emulsifier PlexBreak-145 | Chemplex | Acid Non-Emulsifier | Methanol | 67-56-1 | 15.00 | 0.00006000 | ||
Other -(non hazardous) | 85.00 | 0.00036000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 417,945.00 | 170 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 588,367.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 386,335.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 398,929.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 315,356.00 | 338 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 258,082.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 192,802.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 261,484.22 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 198,489.96 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XTO ENERGY INC | Produced Fluid | 428.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2011 | XTO ENERGY INC | Produced Fluid | 8,316.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Produced Fluid | 5,813.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC001 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 8,362.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC001 |
2011 | XTO ENERGY INC | Produced Fluid | 226.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | XTO ENERGY INC | Produced Fluid | 1,794.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-24189 |
2011 | XTO ENERGY INC | Produced Fluid | 2,073.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-133-20114 |
2011 | XTO ENERGY INC | Produced Fluid | 3,813.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 5,366.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 3,517.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 372.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | XTO ENERGY INC | Produced Fluid | 198.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 15,802.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | XTO ENERGY INC | Produced Fluid | 198.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 1,143.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 4,963.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 393.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 251.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 2,629.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 1,471.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 121.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Produced Fluid | 1,173.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 1,295.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 487.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 6,324.92 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 346.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Produced Fluid | 436.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 1,495.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 1,268.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 103.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 118.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2015 | XTO ENERGY INC | Produced Fluid | 2,372.11 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 2,793.49 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | XTO ENERGY INC | Produced Fluid | 2,048.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Other Oil & Gas Wastes | 3.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 2,175.53 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 666.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 222.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2016 | XTO ENERGY INC | Waste Water Treatment Sludge | 48.00 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 881.73 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 112.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 515.79 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 1,573.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 117.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 2,833.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Produced Fluid | 114.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 1,308.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 291.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | XTO ENERGY INC | Produced Fluid | 330.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 1,009.26 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 1,073.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XTO ENERGY INC | Produced Fluid | 2,418.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 1,034.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 263.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2018 | XTO ENERGY INC | Produced Fluid | 204.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | XTO ENERGY INC | Produced Fluid | 984.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 1,631.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 449.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 1,186.16 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 170.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1938447 | Primary Facility | 2010-12-21 | Drilling/Alteration | No Violations Noted | |
1938901 | Primary Facility | 2010-12-20 | Routine/Complete Inspection | No Violations Noted | |
1940952 | Primary Facility | 2011-01-05 | Drilling/Alteration | No Violations Noted | |
1943964 | Primary Facility | 2011-01-20 | Drilling/Alteration | No Violations Noted | |
1946109 | Primary Facility | 2011-01-28 | Routine/Partial Inspection | No Violations Noted | |
1947231 | Primary Facility | 2011-01-28 | Drilling/Alteration | No Violations Noted | |
1954759 | Primary Facility | 2011-02-24 | Routine/Partial Inspection | Violation(s) Noted | |
1957457 | Primary Facility | 2011-03-08 | Routine/Partial Inspection | No Violations Noted | |
1974881 | Primary Facility | 2011-05-19 | Routine/Complete Inspection | No Violations Noted | |
1975757 | Primary Facility | 2011-05-25 | Drilling/Alteration | No Violations Noted | |
1976799 | Primary Facility | 2011-05-27 | Drilling/Alteration | No Violations Noted | |
1980460 | Primary Facility | 2011-06-10 | Follow-up Inspection | No Violations Noted | |
1980550 | Primary Facility | 2011-06-13 | Follow-up Inspection | No Violations Noted | |
1980929 | Primary Facility | 2011-06-16 | Follow-up Inspection | No Violations Noted | |
1987378 | Primary Facility | 2011-07-07 | Follow-up Inspection | No Violations Noted | |
2041283 | Primary Facility | 2012-02-09 | Routine/Complete Inspection | No Violations Noted | |
2074998 | Primary Facility | 2012-06-11 | Routine/Complete Inspection | No Violations Noted | |
2106608 | Primary Facility | 2012-10-05 | Routine/Complete Inspection | No Violations Noted | |
2155565 | Primary Facility | 2013-04-09 | Routine/Complete Inspection | No Violations Noted | |
2157094 | Primary Facility | 2013-04-10 | Routine/Complete Inspection | Violation(s) Noted | |
2163624 | Primary Facility | 2013-05-03 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2444473 | Primary Facility | 2016-01-28 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Arrived at 14:40. Weather: cloudy and cool. There was one well in production on this location. The well was surrounded by a chain link fence. There were two annular vents on the same side of the well. (1”-diameter: 13-3/8” x 9-5/8”, 2”-diameter: 9-5/8” x 5-1/2”). Field monitoring detected no gas in either annulus (Altair 5X gas meter calibrated 1/28/2016). Well gauges read as follows:
Top gauge: 300 psi (0-5000 psi, analog) 5-1/2”: 0 psi (0-5000 psi, analog) Gauge to production unit: 298 psi (digital). Also on the pad were: 1 GPU, 1 sand separator, 1 produced water tank and one small wooden hut on a flatbed trailer. There were no violations at the time of my inspection. Left location @ 15:20. |
2492588 | Primary Facility | 2016-06-09 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Arrived at 12:15. Weather: sunny, pleasant. There was one well capable of production, but shut-in, on this location. The well was surrounded by a chain link fence. There were two annular vents on the same side of the well. (1”-diameter: 13-3/8” x 9-5/8”, 2”-diameter: 9-5/8” x 5-1/2”). Field monitoring detected no gas in either annulus (Altair 5X gas meter calibrated 5/23/2016). Well gauges read as follows:
Top gauge: 215 psi (0-5000 psi, analog) 5-1/2”: 319 psi (0-5000 psi, analog) The oil-filled analog gauge at the top of the well head was leaking oil onto the well head. I mentioned this to Mike Hahn when I saw him later at the Moser location. There were no violations observed during this inspection, however; a violation of §78.86 was cited on 04/10/2013 (IR# 2157094). The result of this inspection is OUTNO, Outstanding violation(s), no new violation(s). Left location @ 13:00 |
2537461 | Primary Facility | 2016-11-14 | Routine/Complete Inspection | No Violations Noted | Well Site Restoration/NOT Inspection; 11/14/2016.
The well pad surface is designed to remain at its current (originally constructed) size and the PCSM plan has been implemented according to the design. The site currently lacks adequate vegetative cover to be considered permanently stabilized. I recommend the Well Site Restoration Report and Notice of Termination for this site are denied. No Violations Noted. |
2616494 | Primary Facility | 2017-07-14 | Site Restoration | No Violations Noted | Well Site Restoration/Notice of Termination Inspection. The site is permanently stabilized and PCSM plans have been implemented. The well pad surface remains as constructed but justification for the production size has been provided. I recommend approving the Well Site Restoration Report and Notice of Termination. No violations noted. |
2773896 | Primary Facility | 2018-09-12 | Routine/Complete Inspection | No Violations Noted | One well staged for production phase. One each sand and water separator. No leaks detected from production equipment. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1954759 | 605913 | 02/24/2011 | 2011-02-24 | 402POTNLPOLL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit. | Environmental Health & Safety | |
1954759 | 605914 | 02/24/2011 | 2011-02-24 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
1954759 | 605915 | 02/24/2011 | 2011-02-24 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | 78.56(a) Failure to contain cuttings from drilling process |
2157094 | 665598 | 04/10/2013 | 2013-04-10 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | Combustible gas foundin the 9 5/8 x 5 1/2 annulus by the operator on 8/6/12. Discovered by OGI Rick Swank on 4/9/13. No action was taken to correct the defect in that time period |
For data sources see[8]