If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20405 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.264597,"lon":-76.627514,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Penn Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 148666 | |
Farm/Lease Name: KENSINGER UNIT 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-12-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.264597 | |
Longitude: -76.627514 |
Date | Event |
---|---|
2010-12-08 | New Permit Application |
2011-03-24 | Performed Spud Operation |
2011-06-08 | Drilling Completion |
2011-07-22 | Perforation |
2012-07-19 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-07-21 | 2011-07-21 | 6,422 | 7,951,976 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Base Fluid | Water | 100.00 | 85.99 | |||
DAP-103 | Calfrac Well Services | Iron Control | Citric acid | 77-92-9 | 60.00 | 0.00203000 | ||
Sand (Proppant) | Calfrac Well Services | Propping Agent | Quartz | 14808-60-7 | 99.90 | 13.38 | ||
DAP-923 | Calfrac Well Services | Corrosion Inhibitor | Propargyl alcohol | 107-19-7 | 10.00 | 0.00008000 | ||
Fatty acids, tall-oil | 61790-12-3 | 30.00 | 0.00024000 | |||||
Ethoxylated C14-15 alcohols | 68951-67-7 | 30.00 | 0.00024000 | |||||
Methanol | 67-56-1 | 60.00 | 0.00049000 | |||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00024000 | |||||
Alkenes, C>10 .alpha.- | 64743-02-8 | 5.00 | 0.00004000 | |||||
DWP-944 | Calfrac Well Services | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | ||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.02 | |||||
3 HCl Acid | Calfrac Well Services | Perforation Breakdown | Hydrochloric acid | 7647-01-0 | 100.00 | 0.46 | ||
DAP-901 | Calfrac Well Services | Scale Inhibitor | Oxyalkylated polyamine | 5.00 | 0.00094000 | |||
Amine salt | 5.00 | 0.00094000 | ||||||
Methanol | 67-56-1 | 30.00 | 0.00566000 | |||||
Organic phosphonate | 30.00 | 0.00566000 | ||||||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00189000 | |||||
Phosphoric acid ammonium salt | 5.00 | 0.00094000 | ||||||
DWP-612 | Calfrac Well Services | Friction Reducer | No Hazardous Materials | 100.00 | 0.05 | |||
DWP-972 | Calfrac Well Services | Oxygen Scavenger | Sodium thiosulfate | 7772-98-7 | 31.00 | 0.01 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA LLC | 307,289.00 | 92 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 851,452.00 | 211 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 305,097.00 | 253 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 568,475.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 492,523.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 358,705.00 | 277 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 351,751.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 319,331.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 263,108.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 4,309.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA LLC | Produced Fluid | 71.40 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2011 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 2,090.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | EXCO RESOURCES PA LLC | Produced Fluid | 1,216.07 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 1,964.22 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Fracturing Fluid Waste | 9.56 Tons | LANDFILL | 301358 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 109.50 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 71.43 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC024 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 219.04 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 2,395.66 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 92.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 54.80 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 107.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 83.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1960714 | Primary Facility | 2011-03-28 | Drilling/Alteration | No Violations Noted | |
1985125 | Primary Facility | 2011-06-27 | Routine/Partial Inspection | No Violations Noted | |
1987901 | Primary Facility | 2011-07-14 | Drilling/Alteration | No Violations Noted | |
1995995 | Primary Facility | 2011-08-16 | Follow-up Inspection | No Violations Noted | |
2060343 | Primary Facility | 2012-04-16 | Routine/Complete Inspection | No Violations Noted | |
2062917 | Primary Facility | 2012-04-25 | Routine/Complete Inspection | No Violations Noted | |
2074202 | Primary Facility | 2012-06-06 | Routine/Complete Inspection | No Violations Noted | |
2076732 | Primary Facility | 2012-06-12 | Routine/Complete Inspection | No Violations Noted | |
2092043 | Primary Facility | 2012-08-15 | Routine/Complete Inspection | No Violations Noted | |
2098775 | Primary Facility | 2012-09-11 | Routine/Partial Inspection | No Violations Noted | |
2148021 | Primary Facility | 2013-03-12 | Routine/Complete Inspection | No Violations Noted | |
2478331 | Primary Facility | 2016-04-19 | Routine/Complete Inspection | No Violations Noted | At the time of the inspection, the Kensinger Unit 1 (081-20062, 2H (081-20089), 4H (081-20404), and 5H (081-20405) were in production. The well pad area, Fresh Water Impoundment, and adjacent parking area are all stabilized and no erosion was noted. The landowner appears to be using the site for parking vehicles and equipment. Currently, milled asphalt is being stored on the parking area between the well pad and the impoundment. The well site has not been restored and the Well Site Compliance Information Request reply (submitted 9/21/2015) says a new drilling permit will be submitted in 9/2015. The Department has no record of an ESCGP issued for the site and no well permits have been issued for the site 2010. According to the Department’s records, the wells on the pad were drilled between 2007 and 2011 and completed between 2008 and 2011. I recommend you apply for an ESCGP-2 to cover this since it has not been restored and is part of a larger disturbance. |
2518854 | Primary Facility | 2016-08-24 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 8/24/2016.
I entered the site off Dr. Poust Road at 14:47 to evaluate EXCO’s plan to discharge from the FWI (Fresh Water Impoundment) onsite. The dewatering plan indicates 200 ft of 2” hose with sprinkler holes will be deployed on the northern side of the impoundment discharging at approximately 50 GPM. Overall, the area is well vegetated but the slope appears to be compacted. I recommend discharging at the toe of the impoundment slope. The proposed discharge location and application rate appears to be reasonable but I recommend monitoring the dewatering rate and adjusting to field conditions accordingly. Please remember to notify the Department prior to discharging as indicated in your plan. No Violations Noted. |
2813863 | Primary Facility | 2018-12-12 | Routine/Complete Inspection | No Violations Noted | Fours wells staged for production phase. Four each water separators not within containment. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. No violations noted. |
For data sources see[8]