X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20470

Well Details

Well ID: 37-081-20470
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Gamble Township
Operator Name: ARD OPR LLC
Well Pad ID: 148602
Farm/Lease Name: JACK L HIPPLE A 3H
License Status:
Spud Date:
Permit Date: 2010-12-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.412492
Longitude: -76.956256

For data sources see[1][2][3]

Well History

Date Event
2010-12-27 New Permit Application
2011-01-24 Performed Spud Operation
2011-05-02 Drilling Completion
2013-04-13 Perforation
2014-03-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-21 2013-05-25 7,600 2,238,020 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Trican Well Service Proppant Silica Substrate NA 100 15.3268 3,417,580.0
FEAC-20 Trican Well Service Iron Control Citric Acid 77-92-9 30 0.00211974 472.661
Acetic Acid 64-19-7 50 0.00353291 787.768
Hydrochloric Acid (7.5%) Trican Well Service Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0583828 13018.2
Bio-Clear 5000 Trican Well Service Biocide 2,2-dibromo-3-nitrilopropionamide 10222-01-2 10 0.00472901 1054.47
Polyethylene glycol 25322-68-3 70 0.033103 7381.32
AI-7NR Trican Well Service Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00002994 6.676
Bio Clear 1000 Trican Well Service Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 98 0.000210961 47.04
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100 83.7575 18,676,300.0
FR-15 Trican Well Service Friction Reducer Proprietary Amide Proprietary 2.5 0.00199046 443.833
Paraffinic, Naphthenic Solvent 64742-47-8 25 0.0199046 4438.33

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 612,159.00 188 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 434,198.00 365 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 241,296.00 328 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 144,329.00 365 0.00 0 0.00 0
2017 ARD OPR LLC 95,336.77 301 0.00 0 0.00 0
2018 ARD OPR LLC 69,278.03 109 0.00 0 0.00 0
2019 ARD OPR LLC 113,613.13 219 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 12.12 Tons LANDFILL 100955
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 15.85 Tons OTHER
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 918.90 Tons LANDFILL THR029
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 18,079.13 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 4,156.90 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 480.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 737.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 2,200.33 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 972.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 46.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 653.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 115.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 655.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 306.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 115.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 ARD OPR LLC Produced Fluid 12.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 81.46 Bbl REUSE (AT WELL PAD)
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 381.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 237.98 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 832.54 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1968036 Primary Facility 2011-04-22 Drilling/Alteration No Violations Noted
2006226 Primary Facility 2011-09-28 Routine/Complete Inspection No Violations Noted
2064720 Primary Facility 2012-04-27 Routine/Complete Inspection No Violations Noted
2077253 Primary Facility 2012-06-13 Follow-up Inspection No Violations Noted
2139407 Primary Facility 2013-02-12 Drilling/Alteration No Violations Noted
2167520 Primary Facility 2013-05-15 Routine/Complete Inspection No Violations Noted
2554572 Primary Facility 2017-01-19 Routine/Complete Inspection No Violations Noted Routine Inspection; 1/19/2017.

I entered the site at 10:02. At the time of the inspection, the Jack Hipple A 1H (081-20472), 2H (081-20471), 3H (081-20470), 4H (081-20469), and 6H (081-20831) were in production while the monument of the plugged 5H (081-20468) was visible. ESX10-081-0069 expired on 9/1/2015 without being terminated. Currently, the site remains at the originally permitted size, has not been restored or reduced, and no PCSM (Post Construction Stormwater Management) has been implemented on the site.

The most recent update to the well site restoration assessment Anadarko provided on 12/22/2016 indicates infiltration testing was completed in 2016 and the site is planned to be permitted with an ESCGP-2 in 2017. At this time, the Department does not have a permit or permit application for the site. I recommend re-permitting the site (as planned) to comply with PCSM requirements and implementing that plan including well site restoration. No Violations Noted.

2554720 Primary Facility 2017-01-23 Routine/Complete Inspection No Violations Noted
2805240 Primary Facility 2018-11-20 Routine/Complete Inspection No Violations Noted Five wells staged for production phase. Five each sand and water separators. Two additional sand separators. No leaks detected from production equipment. Foamer tank located near well heads. No violations noted.

For data sources see[8]

References