If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20496 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.239553,"lon":-76.638603,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Penn Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148833 | |
Farm/Lease Name: DERR 8545H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-01-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.239553 | |
Longitude: -76.638603 |
Date | Event |
---|---|
2011-01-10 | New Permit Application |
2011-04-27 | Performed Spud Operation |
2011-05-12 | Drilling Completion |
2011-06-30 | Perforation |
2012-07-20 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XTO ENERGY INC | 213,071.00 | 70 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 754,813.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 486,936.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 415,191.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 333,875.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 273,236.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 229,666.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 236,007.41 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 200,925.10 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XTO ENERGY INC | Produced Fluid | 118.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2011 | XTO ENERGY INC | Produced Fluid | 1,206.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2011 | XTO ENERGY INC | Fracing Fluid Waste | 2,464.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XTO ENERGY INC | Produced Fluid | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2011 | XTO ENERGY INC | Produced Fluid | 2,026.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2012 | XTO ENERGY INC | Produced Fluid | 1,356.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 970.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 121.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | INJECTION DISPOSAL WELL | 114 |
2012 | XTO ENERGY INC | Produced Fluid | 3,870.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | INJECTION DISPOSAL WELL | 0114 |
2012 | XTO ENERGY INC | Produced Fluid | 406.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2012 | XTO ENERGY INC | Produced Fluid | 1,571.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 116.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2013 | XTO ENERGY INC | Produced Fluid | 27.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Produced Fluid | 868.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 325.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | XTO ENERGY INC | Produced Fluid | 57.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | XTO ENERGY INC | Produced Fluid | 339.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | XTO ENERGY INC | Produced Fluid | 311.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2014 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2014 | XTO ENERGY INC | Produced Fluid | 1,296.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 543.23 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | XTO ENERGY INC | Produced Fluid | 413.36 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 605.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 121.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2015 | XTO ENERGY INC | Produced Fluid | 1,034.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | XTO ENERGY INC | Produced Fluid | 754.91 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Other Oil & Gas Wastes | 3.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 780.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 466.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2016 | XTO ENERGY INC | Produced Fluid | 216.71 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | XTO ENERGY INC | Produced Fluid | 214.35 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | XTO ENERGY INC | Produced Fluid | 575.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 118.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 1,447.85 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | XTO ENERGY INC | Produced Fluid | 589.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | XTO ENERGY INC | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | XTO ENERGY INC | Produced Fluid | 357.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 235.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | XTO ENERGY INC | Produced Fluid | 680.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | XTO ENERGY INC | Produced Fluid | 499.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | XTO ENERGY INC | Produced Fluid | 112.10 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 565.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 225.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 96.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 357.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 277.45 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Produced Fluid | 140.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1973446 | Primary Facility | 2011-05-17 | Drilling/Alteration | No Violations Noted | |
1987474 | Primary Facility | 2011-07-11 | Follow-up Inspection | Violation(s) Noted | |
2043066 | Primary Facility | 2012-02-15 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2074209 | Primary Facility | 2012-06-06 | Routine/Complete Inspection | No Violations Noted | |
2106598 | Primary Facility | 2012-10-05 | Routine/Complete Inspection | No Violations Noted | |
2135866 | Primary Facility | 2013-01-24 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2531213 | Primary Facility | 2016-10-20 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 10/20/2016.
At the time of the inspection, the three wells (081-20275, 081-20348, 081-20496) onsite were in production. In addition, PCSM facilities and conveyances have been installed, seeded and stabilized. The construction of the PCSM features was being performed based on a modification to the ESCGP and a 2-years restoration extension which were approved on 9/19/2016. E&S controls were installed and functioning properly. Overall, the site is in good condition. No Violations Noted. |
2625399 | Primary Facility | 2017-08-03 | Site Restoration | No Violations Noted | Notice of Termination/Well Site Restoration inspection. Three wells are in production and the site has been restored according to the Site Restoration plans. The well site remains at the originally constructed size but justification was provided in the permitting process to keep the current size to accommodate production and maintenance of the wells as wells (including a workover/service rig). I recommend the Well Site Restoration and Notice of Termination for this site be approved. No violations noted. |
2707330 | Primary Facility | 2018-03-19 | Routine/Complete Inspection | No Violations Noted | Weather was 33°, partly sunny and windy at time of inspection. There were no XTO representatives on location at time of inspection. Well has two digital gauges attached, one read the pressure for the tubing and one read the pressure for the casing. Tubing pressure was 212 psi and casing pressure was 284 psi. There were two annular vents plumbed to surface that were both 2 inch pipe. 0% combustible gas was discovered in any location at time of inspection. No violations were noted at time of inspection. |
2791547 | Primary Facility | 2018-10-19 | Routine/Complete Inspection | No Violations Noted | Three wells stage for production. Three each sand and water separators within containment. No leaks detected from production equipment. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1987474 | 615224 | 07/11/2011 | 2011-07-11 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | Defective Cement: Gas found in the annular space of the 9 5/8 x 5 1/2 casing. |
For data sources see[7]