37-081-20534

Well Details

Well ID: 37-081-20534
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Penn Township
Operator Name: XTO ENERGY INC
Well Pad ID: 148833
Farm/Lease Name: MARQUARDT UNIT C
License Status: Plugged and Abandoned
Spud Date: 2011-05-12
Permit Date: 2011-03-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.239575
Longitude: -76.638731

For data sources see[1][2][3]

Well History

Date Event
2011-03-14 New Permit Application
2011-04-06 Performed Spud Operation
2014-04-24 Inactive Well Request Granted
2019-03-28 Begin Plugging
2019-03-28 Finished Plugging
2019-10-04 Fully Plugged
2019-10-04 Newly Drilled

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2016 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2017 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2019 XTO ENERGY INC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 XTO ENERGY INC Soil Contaminated by Oil 1.50 Tons LANDFILL 100955
2019 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 1.50 Tons LANDFILL 100955

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2043061 Primary Facility 2012-02-15 Routine/Complete Inspection No Violations Noted
2074210 Primary Facility 2012-06-06 Routine/Complete Inspection No Violations Noted
2106595 Primary Facility 2012-10-05 Routine/Complete Inspection No Violations Noted
2135844 Primary Facility 2013-01-24 Routine/Complete Inspection No Violations Noted
2625404 Primary Facility 2017-08-03 Site Restoration No Violations Noted Notice of Termination/Well Site Restoration inspection. Three wells are in production and the site has been restored according to the Site Restoration plans. The well site remains at the originally constructed size but justification was provided in the permitting process to keep the current size to accommodate production and maintenance of the wells as wells (including a workover/service rig). I recommend the Well Site Restoration and Notice of Termination for this site be approved. No violations noted.
2791549 Primary Facility 2018-10-19 Routine/Complete Inspection No Violations Noted Three wells stage for production. Three each sand and water separators within containment. No leaks detected from production equipment. No violations noted.

One regulatory inactive well on location.

2854456 Primary Facility 2019-03-15 Routine/Complete Inspection No Violations Noted A routine (pre-plugging) inspection of this uncompleted well was conducted March 15, 2019. Records indicate this well has (cemented) surface casing only set. There is no indication float equipment was drilled out and therefore any formation below the casing seat is isolated with cement by shoe and shoe track. The operator intends to satisfy the regulatory requirements outlined in the plugging regulations by filling the inside of the surface casing with a non-cementing material (gravel) to surface. At the time of inspection, access to the well was limited due to a metal cover placed over the well cellar. The well could be seen somewhat through a small hole in this cover. There was no audible or visible venting, bubbling, discharge, or other obvious issues observed. No gas was detected in the cellar with an Altair 5x gas meter. The operator has submitted a Notice of Intent to plug this well, and the operation is tentatively scheduled for next week.

For data sources see[7]