If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20719 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.283808,"lon":-76.58985,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Penn Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 148239 | |
Farm/Lease Name: DOEBLER UNIT 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-10-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.283808 | |
Longitude: -76.589850 |
Date | Event |
---|---|
2011-10-17 | New Permit Application |
2011-10-24 | Performed Spud Operation |
2012-03-12 | Drilling Completion |
2013-07-28 | Perforation |
2014-03-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-28 | 2013-07-31 | 7,644 | 3,575,190 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scalechek LP-65 | Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10 | 0.00252226 | 760 |
BE-9 | Halliburton | Biocide | tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00284418 | 857 | |
Hydrochloric Acid (7.5%) | Halliburton | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.082969 | 25000 | |
Water | Operator | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 99.0151 | 29,835,000.0 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0121301 | 3655 | |
Sand (Proppant) | Halliburton | Proppant | Silica Substrate | 14808-60-7 | 100 | 0.163376 | 49228 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 823,028.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 585,263.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 428,386.00 | 278 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 426,338.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 398,264.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 315,372.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 438.56 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Drill Cuttings | 623.44 Tons | LANDFILL | 301358 |
2013 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 219.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC024 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,259.46 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 816.62 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC024 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,845.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 3,400.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 885.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Fracturing Fluid Waste | 30.00 Tons | LANDFILL | 301358 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 440.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 164.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC024 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 55.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 432.70 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 330.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 55.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 55.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 109.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 235.80 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 40.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2012652 | Primary Facility | 2011-10-12 | Drilling/Alteration | No Violations Noted | |
2062939 | Primary Facility | 2012-04-25 | Routine/Complete Inspection | No Violations Noted | |
2067474 | Primary Facility | 2012-05-11 | Routine/Complete Inspection | No Violations Noted | |
2077300 | Primary Facility | 2012-06-14 | Follow-up Inspection | No Violations Noted | |
2092264 | Primary Facility | 2012-08-16 | Routine/Partial Inspection | No Violations Noted | |
2098769 | Primary Facility | 2012-09-11 | Routine/Partial Inspection | No Violations Noted | |
2098796 | Primary Facility | 2012-09-05 | Routine/Complete Inspection | No Violations Noted | |
2117184 | Primary Facility | 2012-11-20 | Routine/Complete Inspection | No Violations Noted | |
2123228 | Primary Facility | 2012-12-06 | Routine/Complete Inspection | No Violations Noted | |
2125971 | Primary Facility | 2012-12-21 | Complaint Inspection | No Violations Noted | |
2151245 | Primary Facility | 2013-03-27 | Drilling/Alteration | No Violations Noted | |
2198893 | Primary Facility | 2013-08-26 | Routine/Complete Inspection | No Violations Noted | |
2575316 | Primary Facility | 2017-03-20 | Routine/Complete Inspection | No Violations Noted | I entered the site at 09:40, in response to a spill notification phone call I received from Bird Smith (EXCO) at 08:20 this morning. Mr. Smith reported that
approximately 56 barrels of produced water were released to containment from the bottom valve on the Doebler 3H (081-20718) produced water tank. The release was caused when the produced water froze in the valve and dislodged the gasket. At the time of the inspection, the Doebler 1-5H (081-20454, 081- 20717, 081-20718, 081-20719, 081-20720) wells were in production. Water was actively leaking from the bottom valve on the production tank for the Doebler 3H well but the vac-truck driver/operator was onsite vacuuming water from the containment. Snow was covering the ground around the containment and I found no evidence that any produced water had leaked out of the containment. Field conductivity of produced water in the containment was between 1650- 1995 umhos/cm at several locations. The conductivity of the produced water is significantly lower than expecte |
2800854 | Primary Facility | 2018-11-08 | Routine/Complete Inspection | No Violations Noted | Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. No violations noted. |
2845622 | Primary Facility | 2019-02-27 | Routine/Complete Inspection | No Violations Noted | Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. No violations noted. |
For data sources see[8]