If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20720 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.283844,"lon":-76.589906,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Penn Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 148239 | |
Farm/Lease Name: DOEBLER UNIT 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-10-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.283844 | |
Longitude: -76.589906 |
Date | Event |
---|---|
2011-10-17 | New Permit Application |
2011-10-19 | Performed Spud Operation |
2012-03-30 | Drilling Completion |
2012-09-03 | Perforation |
2013-07-05 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-08-20 | 2012-08-20 | 7,688 | 5,619,574 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | DAP-103 | Calfrac Well Services | Iron Control | |||||
Hydrochloric Acid | Calfrac Well Services | Clean Perforations | Oxyalkylated polyamine | 5.00 | 0.00101000 | |||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | |||||
Illite | 12173-60-3 | 1.00 | 0.00734000 | |||||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.01 | |||||
Biotite | 1302-27-8 | 0.10 | 0.00394000 | |||||
Fatty acids | 30.00 | 0.00037000 | ||||||
Polyacrylamide polymer | 40.00 | 0.02 | ||||||
Quartz | 14808-60-7 | 100.00 | 14.92 | |||||
Organic phosphonate 1 | 30.00 | 0.00603000 | ||||||
Citric acid | 77-92-9 | 60.00 | 0.00258000 | |||||
Carbonic acid calcium salt (1:1) | 471-34-1 | 1.00 | 0.02 | |||||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00121000 | |||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00037000 | |||||
Olefin | 5.00 | 0.00006000 | ||||||
Sodium chloride | 7647-14-5 | 1.00 | 0.00001000 | |||||
Propargyl Alcohol | 10.00 | 0.00012000 | ||||||
Ilmenite (FeTiO3), conc. | 98072-94-7 | 0.10 | 0.00272000 | |||||
Acetic acid | 64-19-7 | 1.00 | 0.00020000 | |||||
Methanol | 67-56-1 | 60.00 | 0.00677000 | |||||
Formalin | 50-00-0 | 0.10 | 0.00003000 | |||||
Nonionic surfactant | 5.00 | 0.00277000 | ||||||
Goethite | 1310-14-1 | 0.10 | 0.00640000 | |||||
Polyoxyalkylenes | 30.00 | 0.00037000 | ||||||
Polyoxyalkylenes surfactant | 5.00 | 0.00277000 | ||||||
Hydrochloric acid | 7647-01-0 | 37.00 | 0.25 | |||||
Apatite | 64476-38-6 | 0.10 | 0.00394000 | |||||
Organic phosphonate 2 | 10.00 | 0.00201000 | ||||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | |||||
Amine salt | 5.00 | 0.00101000 | ||||||
DWP-944 | Calfrac Well Services | Biocide | ||||||
Sand (Proppant) | Calfrac Well Services | Propping Agent | ||||||
DAP-925 | Calfrac Well Services | Acid Corrosion Inhibitor | ||||||
Water | BaseFluid/Mix Water | Water | 7732-18-5 | 100.00 | 84.70 | |||
DAP-901 | Calfrac Well Services | Scale Inhibitor | ||||||
DWP-612 | Calfrac Well Services | Friction Reducer |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 914,765.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 486,881.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 504,007.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 386,627.00 | 295 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 405,765.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 277,940.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 333,078.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 4,370.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 219.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 7,547.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EXCO RESOURCES PA LLC | Drill Cuttings | 623.44 Tons | LANDFILL | 301358 |
2012 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 81.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC024 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 766.64 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 219.02 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 383.26 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC024 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,330.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 219.52 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Fracturing Fluid Waste | 105.58 Tons | LANDFILL | 301358 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 54.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 657.12 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 550.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 54.80 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 164.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC024 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 326.10 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 165.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 165.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 950.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 177.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 85.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2012670 | Primary Facility | 2011-10-20 | Drilling/Alteration | No Violations Noted | |
2062937 | Primary Facility | 2012-04-25 | Routine/Complete Inspection | No Violations Noted | |
2067475 | Primary Facility | 2012-05-11 | Routine/Complete Inspection | No Violations Noted | |
2077301 | Primary Facility | 2012-06-14 | Follow-up Inspection | No Violations Noted | |
2092266 | Primary Facility | 2012-08-16 | Routine/Partial Inspection | No Violations Noted | |
2098771 | Primary Facility | 2012-09-11 | Routine/Partial Inspection | No Violations Noted | |
2098797 | Primary Facility | 2012-09-05 | Routine/Complete Inspection | No Violations Noted | |
2117186 | Primary Facility | 2012-11-20 | Routine/Complete Inspection | No Violations Noted | |
2123230 | Primary Facility | 2012-12-06 | Routine/Complete Inspection | No Violations Noted | |
2125973 | Primary Facility | 2012-12-21 | Complaint Inspection | No Violations Noted | |
2151251 | Primary Facility | 2013-03-27 | Drilling/Alteration | No Violations Noted | |
2198894 | Primary Facility | 2013-08-26 | Routine/Complete Inspection | No Violations Noted | |
2575317 | Primary Facility | 2017-03-27 | Routine/Complete Inspection | No Violations Noted | I entered the site at 09:40, in response to a spill notification phone call I received from Bird Smith (EXCO) at 08:20 this morning. Mr. Smith reported that
approximately 56 barrels of produced water were released to containment from the bottom valve on the Doebler 3H (081-20718) produced water tank. The release was caused when the produced water froze in the valve and dislodged the gasket. At the time of the inspection, the Doebler 1-5H (081-20454, 081- 20717, 081-20718, 081-20719, 081-20720) wells were in production. Water was actively leaking from the bottom valve on the production tank for the Doebler 3H well but the vac-truck driver/operator was onsite vacuuming water from the containment. Snow was covering the ground around the containment and I found no evidence that any produced water had leaked out of the containment. Field conductivity of produced water in the containment was between 1650- 1995 umhos/cm at several locations. The conductivity of the produced water is significantly lower than expecte |
2800856 | Primary Facility | 2018-11-08 | Routine/Complete Inspection | No Violations Noted | Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. No violations noted. |
2845626 | Primary Facility | 2019-02-27 | Routine/Complete Inspection | No Violations Noted | Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. No violations noted. |
For data sources see[8]