If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20769 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.192703,"lon":-76.583294,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Franklin Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 146354 | |
Farm/Lease Name: FARNSWORTH UNIT | |
License Status: Inactive | |
Spud Date: | |
Permit Date: 2011-12-15 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.192703 | |
Longitude: -76.583294 |
Date | Event |
---|---|
2011-12-15 | New Permit Application |
2012-03-24 | Performed Spud Operation |
2012-06-04 | Drilling Completion |
2012-08-06 | Perforation |
2013-04-08 | NEWLY DRILLED |
2019-06-12 | Inactive Well Request Granted |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-08-02 | 2012-08-02 | 4,136 | 6,497,741 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Calfrac Well Services | Propping Agent | |||||
DWP-944 | Calfrac Well Services | Biocide | ||||||
DAP-901 | Calfrac Well Services | Scale Inhibitor | ||||||
DAP-103 | Calfrac Well Services | Iron Control | ||||||
Hydrochloric Acid | Calfrac Well Services | Clean Perforations | Citric acid | 77-92-9 | 60.00 | 0.00182000 | ||
Illite | 12173-60-3 | 1.00 | 0.01 | |||||
Methanol | 67-56-1 | 60.00 | 0.00622000 | |||||
Organic phosphonate 1 | 30.00 | 0.00571000 | ||||||
Propargyl Alcohol | 10.00 | 0.00009000 | ||||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00026000 | |||||
Hydrochloric acid | 7647-01-0 | 37.00 | 0.18 | |||||
Apatite | 64476-38-6 | 0.10 | 0.00570000 | |||||
Carbonic acid calcium salt (1:1) | 471-34-1 | 1.00 | 0.01 | |||||
Quartz | 14808-60-7 | 100.00 | 14.13 | |||||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.01 | |||||
Nonionic surfactant | 5.00 | 0.00178000 | ||||||
Fatty acids | 30.00 | 0.00026000 | ||||||
Oxyalkylated polyamine | 5.00 | 0.00095000 | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | |||||
Polyoxyalkylenes surfactant | 5.00 | 0.00178000 | ||||||
Sodium chloride | 7647-14-5 | 1.00 | 0.00001000 | |||||
Polyacrylamide polymer | 40.00 | 0.01 | ||||||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00114000 | |||||
Ilmenite (FeTiO3), conc. | 98072-94-7 | 0.10 | 0.00475000 | |||||
Polyoxyalkylenes | 30.00 | 0.00026000 | ||||||
Goethite | 1310-14-1 | 0.10 | 0.00759000 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | |||||
Formalin | 50-00-0 | 0.10 | 0.00003000 | |||||
Biotite | 1302-27-8 | 0.10 | 0.00570000 | |||||
Organic phosphonate 2 | 10.00 | 0.00190000 | ||||||
Olefin | 5.00 | 0.00004000 | ||||||
Acetic acid | 64-19-7 | 1.00 | 0.00019000 | |||||
Amine salt | 5.00 | 0.00095000 | ||||||
Water | BaseFluid/Mix Water | Water | 7732-18-5 | 100.00 | 85.56 | |||
DWP-612 | Calfrac Well Services | Friction Reducer |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 4,410.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 52,934.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 348.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Drill Cuttings | 878.28 Tons | LANDFILL | 301358 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2072433 | Primary Facility | 2012-05-25 | Routine/Complete Inspection | No Violations Noted | |
2072721 | Primary Facility | 2012-05-31 | Drilling/Alteration | No Violations Noted | |
2081363 | Primary Facility | 2012-07-05 | Routine/Complete Inspection | No Violations Noted | |
2081868 | Primary Facility | 2012-06-29 | Drilling/Alteration | No Violations Noted | |
2088277 | Primary Facility | 2012-07-27 | Routine/Complete Inspection | No Violations Noted | |
2092254 | Primary Facility | 2012-08-16 | Routine/Partial Inspection | No Violations Noted | |
2104864 | Primary Facility | 2012-09-27 | Routine/Complete Inspection | No Violations Noted | |
2133580 | Primary Facility | 2013-01-25 | Routine/Complete Inspection | No Violations Noted | |
2142058 | Primary Facility | 2013-02-20 | Routine/Complete Inspection | No Violations Noted | |
2502480 | Primary Facility | 2016-07-18 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 7/18/2016.
At the time of the inspection, the Farnsworth Unit 1H (081-20769) was shut-in after completions. Both the Well Record and Completion Report were submitted. No pipeline is connected to the well pad and the well has never been in production. The well pad remains at its original size as per the minor modification approved on 6/20/2012 but has not been restored as depicted in the PCSM plans. No other wells were ever permitted for the site and the ESCGP expires on 10/16/2016. The Department considers a well site to be restored under Section 3216(c) of the 2012 Oil and Gas Act when the oil or gas owners or operators meet the following: 1. All permanent post construction stormwater control features as identified in the Post Construction Stormwater Management/Site Restoration Plan are in place. 2. Remaining impervious areas are minimized. See Section 102.8 (b)(4). Impervious areas include, but are not limited to, areas where the soil has been compacted, areas where the soil ha |
2543869 | Primary Facility | 2016-12-07 | Routine/Complete Inspection | No Violations Noted | Large site, one well tagged and locked. Water in cellar, no bubbles. 2 annuli, open. No gas detected. Need to check on well status. |
2841519 | Primary Facility | 2019-01-28 | Routine/Complete Inspection | No Violations Noted | Department representative Jared Jacobini conducted a routine site inspection at Farnsworth Unit 1H (081-20769) on January 28, 2019. The site sign, emergency response plan, and weekly inspection log were onsite for review.
The well site has one shut-in well (1H). No active permits for additional wells are permitted with DEP. The 1H well was finished drilling on 6/24/2012. Based on the drill date, this site has not been restored to Site Restoration Plan Specifications, and PCSM's have not been implemented. The well remains in active status, but it clearly is not being produced due to the lack of production equipment. The well will be referred to the Oil and Gas inspector for further review. Recommended Site options: Implement PCSM's and apply for a 2-year restoration extension if the site and tank pad will be utilized. Or Restore site per site restoration plan described in the ESCGP if the site will not be utilized. Or Consider plugging and full restoration if the site will not be utilized. The Depart |
For data sources see[8]