If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20877 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.250139,"lon":-76.630444,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Penn Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 148163 | |
Farm/Lease Name: DALE BOWER EAST UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-02-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.250139 | |
Longitude: -76.630444 |
Date | Event |
---|---|
2012-02-16 | New Permit Application |
2012-05-13 | Performed Spud Operation |
2012-06-08 | Drilling Completion |
2012-11-28 | Perforation |
2013-06-06 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-11-20 | 2012-11-20 | 6,319 | 3,786,038 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | DAP-901 | Calfrac Well Services | Scale Inhibitor | |||||
DWP-944 | Calfrac Well Services | Biocide | ||||||
DAP-925 | Calfrac Well Services | Acid Corrosion Inhibitor | ||||||
Sand (Proppant) | Calfrac Well Services | Propping Agent | ||||||
Water | BaseFluid/Mix Water | Water | 7732-18-5 | 100.00 | 83.75 | |||
DWP-612 | Calfrac Well Services | Friction Reducer | ||||||
DAP-103 | Calfrac Well Services | Iron Control | ||||||
Hydrochloric Acid | Calfrac Well Services | Clean Perforations | Formalin | 50-00-0 | 0.10 | 0.00003000 | ||
Oxyalkylated polyamine | 5.00 | 0.00095000 | ||||||
Polyacrylamide polymer | 40.00 | 0.03 | ||||||
Organic phosphonate 1 | 30.00 | 0.00569000 | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |||||
Amine salt | 5.00 | 0.00095000 | ||||||
Propargyl Alcohol | 10.00 | 0.00018000 | ||||||
Polyoxyalkylenes | 30.00 | 0.00054000 | ||||||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00114000 | |||||
Organic phosphonate 2 | 10.00 | 0.00190000 | ||||||
Biotite | 1302-27-8 | 0.10 | 0.00304000 | |||||
Apatite | 64476-38-6 | 0.10 | 0.00304000 | |||||
Polyoxyalkylenes surfactant | 5.00 | 0.00409000 | ||||||
Goethite | 1310-14-1 | 0.10 | 0.00587000 | |||||
Fatty acids | 30.00 | 0.00054000 | ||||||
Methanol | 67-56-1 | 60.00 | 0.00676000 | |||||
Ilmenite (FeTiO3), conc. | 98072-94-7 | 0.10 | 0.00162000 | |||||
Sodium chloride | 7647-14-5 | 1.00 | 0.00002000 | |||||
Olefin | 5.00 | 0.00009000 | ||||||
Citric acid | 77-92-9 | 60.00 | 0.00378000 | |||||
Hydrochloric acid | 7647-01-0 | 37.00 | 0.37 | |||||
Quartz | 14808-60-7 | 100.00 | 15.74 | |||||
Illite | 12173-60-3 | 1.00 | 0.00437000 | |||||
Acetic acid | 64-19-7 | 1.00 | 0.00019000 | |||||
Nonionic surfactant | 5.00 | 0.00409000 | ||||||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.01 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | |||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00054000 | |||||
Carbonic acid calcium salt (1:1) | 471-34-1 | 1.00 | 0.02 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 981,295.00 | 317 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 877,863.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 770,357.00 | 349 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 568,962.00 | 312 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 490,792.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 433,813.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 360,754.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 364.28 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 2,300.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 3,079.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EXCO RESOURCES PA LLC | Drill Cuttings | 1,594.46 Tons | LANDFILL | 301358 |
2012 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 54.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 54.70 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 188.58 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Fracturing Fluid Waste | 33.46 Tons | LANDFILL | 301358 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 1,314.72 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 54.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 164.80 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 208.90 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 22.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 106.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | Soil Contaminated by Oil | 43.27 Tons | LANDFILL | 301358 |
2017 | EXCO RESOURCES PA LLC | Servicing Fluid | 35.53 Tons | LANDFILL | 301358 |
2017 | EXCO RESOURCES PA LLC | Synthetic Liner Materials | 46.17 Tons | LANDFILL | 301358 |
2017 | EXCO RESOURCES PA LLC | Soil Contaminated by Oil & Gas Related Spills | 43.27 Tons | LANDFILL | 301358 |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 79.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 24.60 Bbl | REUSE (AT WELL PAD) | |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 32.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 63.80 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 38.40 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2056390 | Primary Facility | 2012-04-02 | Routine/Partial Inspection | Viol(s) Noted & Immediately Corrected | |
2072727 | Primary Facility | 2012-06-01 | Drilling/Alteration | No Violations Noted | |
2077286 | Primary Facility | 2012-06-14 | Routine/Complete Inspection | No Violations Noted | |
2081357 | Primary Facility | 2012-07-05 | Complaint Inspection | No Violations Noted | |
2084208 | Primary Facility | 2012-07-19 | Drilling/Alteration | No Violations Noted | |
2090092 | Primary Facility | 2012-08-07 | Incident- Response to Accident or Event | No Violations Noted | |
2110542 | Primary Facility | 2012-10-24 | Routine/Complete Inspection | No Violations Noted | |
2119049 | Primary Facility | 2012-11-27 | Routine/Complete Inspection | No Violations Noted | |
2128358 | Primary Facility | 2012-12-31 | Routine/Complete Inspection | No Violations Noted | |
2136080 | Primary Facility | 2013-01-25 | Routine/Complete Inspection | No Violations Noted | |
2462151 | Primary Facility | 2016-03-07 | Routine/Complete Inspection | No Violations Noted | I inspected the site after receiving an email about the operation of the waste impoundment (Frac impoundment on E&S Plans). At the time of the inspection, 5 wells onsite were in production. Two impoundments were located onsite. One impoundment was completely frozen over and the other had no ice. The waste impoundment had approximately 2 foot of freeboard and was completely frozen over so i could not collect a sample. I collected sample 3440267 at 12:15 from the northeast impoundment where no ice was present which was labeled as fresh water. Field conductivity from this impoundment was approximately 40 umhos/cm. The site, including the impoundments, has not been restored because an active well permit exists for the site; yet, the impoundment has been holding waste since 2012. I recommend reclaiming the waste impoundment to minimize the associated liability since the site was not constructed to the centralized impoundment standards and does not include groundwater monitoring through monitoring wells. |
2584387 | Primary Facility | 2017-04-13 | Routine/Partial Inspection | No Violations Noted | I arrived on-site @ 09:30 hrs. in response to an email notification regarding removal of sludge and liner from the on-site wastewater impoundment prior to closure. I was greeted by Russ Lawrence of EXCO as I arrived; Mr. Lawrence informed me that he was just getting ready to contact Ben Bahner, WQS for the area, to inform him of a potential issue with the impoundment. On Wednesday 4/12 the sludge had been removed from the impoundment and the upper layer of liner pulled out; Mr. Lawrence noted that there was fluid present on the lower layer of liner. Conductivity readings of this fluid were in the 11-12 mS/cm range, indicating that the upper liner had likely leaked. The felt and mesh material that had been present between the two layers of liner was pulled up onto the impoundment slope to dry and the fluid was removed by a vac truck. On Thursday 4/13 @08:00 hrs. removal of the lower liner commenced, and Mr. Lawrence began taking soil conductance readings in the impoundment; he noted an area approximately |
2584611 | Primary Facility | 2017-04-17 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 4/17/2017.
I entered the site at 12:03 and met with Rick Mays and Barry Graham (both EXCO). We met onsite to discuss the implementation of the PCSM (Post Construction Stormwater Management) plans after the Frac Pit onsite is properly removed and screened (see SeanVanFleet’s inspection report from 4/13/2017). EXCO proposes to push the PCSM BMP’s closer to the well pad after topsoil stockpile is removed on the north side of the well pad. In addition, they proposed using an earthen berm as an alternative. I requestedthe operator have their consultant contact Dan Harvey (DEP) to discuss what documentation is required for this proposed modification. I do agree that moving the PCSM BMP’s closer to the well pad will reduce the overall footprint and minimize the amount offarm land impacted by the well pad. While reviewing the newest ESCGP permit it was noted that one wetland is noted on the north side of the well pad. The area delineated as a wetland is currently in the middle of the land |
2773956 | Primary Facility | 2018-09-12 | Routine/Complete Inspection | No Violations Noted | Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. Methanol tank on location. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2056390 | 636053 | 04/02/2012 | 2012-04-02 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | failure to provide: erosion contril matting other erosion control for swale between fill slope and topsoil stockpile, failure to stabilize access road swales and ditches, no rock at culverts, no stockpile at RCE, RCE not maintained. |
2056390 | 636054 | 04/02/2012 | 2012-04-02 | 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. | Administrative | Lack of temp. stabilization: for pad fill slopes, topsoil stockpile. |
2056390 | 636055 | 04/02/2012 | 2012-04-02 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | 102.4(b)2: failure to follow plan. construction sequence specifies that access road be stabilized before major pad work. Access road not stabilized, pad work near completion, impoundment work started. |
For data sources see[8]