X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20877

Well Details

Well ID: 37-081-20877
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Penn Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 148163
Farm/Lease Name: DALE BOWER EAST UNIT 1H
License Status:
Spud Date:
Permit Date: 2012-02-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.250139
Longitude: -76.630444

For data sources see[1][2][3]

Well History

Date Event
2012-02-16 New Permit Application
2012-05-13 Performed Spud Operation
2012-06-08 Drilling Completion
2012-11-28 Perforation
2013-06-06 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-20 2012-11-20 6,319 3,786,038

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 DAP-901 Calfrac Well Services Scale Inhibitor
DWP-944 Calfrac Well Services Biocide
DAP-925 Calfrac Well Services Acid Corrosion Inhibitor
Sand (Proppant) Calfrac Well Services Propping Agent
Water BaseFluid/Mix Water Water 7732-18-5 100.00 83.75
DWP-612 Calfrac Well Services Friction Reducer
DAP-103 Calfrac Well Services Iron Control
Hydrochloric Acid Calfrac Well Services Clean Perforations Formalin 50-00-0 0.10 0.00003000
Oxyalkylated polyamine 5.00 0.00095000
Polyacrylamide polymer 40.00 0.03
Organic phosphonate 1 30.00 0.00569000
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Amine salt 5.00 0.00095000
Propargyl Alcohol 10.00 0.00018000
Polyoxyalkylenes 30.00 0.00054000
Ammonium chloride 12125-02-9 10.00 0.00114000
Organic phosphonate 2 10.00 0.00190000
Biotite 1302-27-8 0.10 0.00304000
Apatite 64476-38-6 0.10 0.00304000
Polyoxyalkylenes surfactant 5.00 0.00409000
Goethite 1310-14-1 0.10 0.00587000
Fatty acids 30.00 0.00054000
Methanol 67-56-1 60.00 0.00676000
Ilmenite (FeTiO3), conc. 98072-94-7 0.10 0.00162000
Sodium chloride 7647-14-5 1.00 0.00002000
Olefin 5.00 0.00009000
Citric acid 77-92-9 60.00 0.00378000
Hydrochloric acid 7647-01-0 37.00 0.37
Quartz 14808-60-7 100.00 15.74
Illite 12173-60-3 1.00 0.00437000
Acetic acid 64-19-7 1.00 0.00019000
Nonionic surfactant 5.00 0.00409000
Polyethylene glycol 25322-68-3 70.00 0.01
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 40.00 0.01
Thiourea polymer 68527-49-1 30.00 0.00054000
Carbonic acid calcium salt (1:1) 471-34-1 1.00 0.02

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 981,295.00 317 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 877,863.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 770,357.00 349 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 568,962.00 312 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 490,792.00 337 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 433,813.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 360,754.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 EXCO RESOURCES PA LLC Produced Fluid 364.28 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Drilling Fluid Waste 2,300.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Fracing Fluid Waste 3,079.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Drill Cuttings 1,594.46 Tons LANDFILL 301358
2012 EXCO RESOURCES PA LLC Fracing Fluid Waste 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 54.76 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EXCO RESOURCES PA LLC Produced Fluid 54.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 188.58 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Fracturing Fluid Waste 33.46 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 1,314.72 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 54.76 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2014 EXCO RESOURCES PA LLC Produced Fluid 164.80 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 208.90 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 EXCO RESOURCES PA LLC Produced Fluid 106.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 95.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Soil Contaminated by Oil 43.27 Tons LANDFILL 301358
2017 EXCO RESOURCES PA LLC Servicing Fluid 35.53 Tons LANDFILL 301358
2017 EXCO RESOURCES PA LLC Synthetic Liner Materials 46.17 Tons LANDFILL 301358
2017 EXCO RESOURCES PA LLC Soil Contaminated by Oil & Gas Related Spills 43.27 Tons LANDFILL 301358
2018 EXCO RESOURCES PA LLC Produced Fluid 79.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 24.60 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 32.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EXCO RESOURCES PA LLC Produced Fluid 63.80 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 38.40 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2056390 Primary Facility 2012-04-02 Routine/Partial Inspection Viol(s) Noted & Immediately Corrected
2072727 Primary Facility 2012-06-01 Drilling/Alteration No Violations Noted
2077286 Primary Facility 2012-06-14 Routine/Complete Inspection No Violations Noted
2081357 Primary Facility 2012-07-05 Complaint Inspection No Violations Noted
2084208 Primary Facility 2012-07-19 Drilling/Alteration No Violations Noted
2090092 Primary Facility 2012-08-07 Incident- Response to Accident or Event No Violations Noted
2110542 Primary Facility 2012-10-24 Routine/Complete Inspection No Violations Noted
2119049 Primary Facility 2012-11-27 Routine/Complete Inspection No Violations Noted
2128358 Primary Facility 2012-12-31 Routine/Complete Inspection No Violations Noted
2136080 Primary Facility 2013-01-25 Routine/Complete Inspection No Violations Noted
2462151 Primary Facility 2016-03-07 Routine/Complete Inspection No Violations Noted I inspected the site after receiving an email about the operation of the waste impoundment (Frac impoundment on E&S Plans). At the time of the inspection, 5 wells onsite were in production. Two impoundments were located onsite. One impoundment was completely frozen over and the other had no ice. The waste impoundment had approximately 2 foot of freeboard and was completely frozen over so i could not collect a sample. I collected sample 3440267 at 12:15 from the northeast impoundment where no ice was present which was labeled as fresh water. Field conductivity from this impoundment was approximately 40 umhos/cm. The site, including the impoundments, has not been restored because an active well permit exists for the site; yet, the impoundment has been holding waste since 2012. I recommend reclaiming the waste impoundment to minimize the associated liability since the site was not constructed to the centralized impoundment standards and does not include groundwater monitoring through monitoring wells.
2584387 Primary Facility 2017-04-13 Routine/Partial Inspection No Violations Noted I arrived on-site @ 09:30 hrs. in response to an email notification regarding removal of sludge and liner from the on-site wastewater impoundment prior to closure. I was greeted by Russ Lawrence of EXCO as I arrived; Mr. Lawrence informed me that he was just getting ready to contact Ben Bahner, WQS for the area, to inform him of a potential issue with the impoundment. On Wednesday 4/12 the sludge had been removed from the impoundment and the upper layer of liner pulled out; Mr. Lawrence noted that there was fluid present on the lower layer of liner. Conductivity readings of this fluid were in the 11-12 mS/cm range, indicating that the upper liner had likely leaked. The felt and mesh material that had been present between the two layers of liner was pulled up onto the impoundment slope to dry and the fluid was removed by a vac truck. On Thursday 4/13 @08:00 hrs. removal of the lower liner commenced, and Mr. Lawrence began taking soil conductance readings in the impoundment; he noted an area approximately
2584611 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted Routine Inspection; 4/17/2017.

I entered the site at 12:03 and met with Rick Mays and Barry Graham (both EXCO). We met onsite to discuss the implementation of the PCSM (Post Construction Stormwater Management) plans after the Frac Pit onsite is properly removed and screened (see SeanVanFleet’s inspection report from 4/13/2017). EXCO proposes to push the PCSM BMP’s closer to the well pad after topsoil stockpile is removed on the north side of the well pad. In addition, they proposed using an earthen berm as an alternative. I requestedthe operator have their consultant contact Dan Harvey (DEP) to discuss what documentation is required for this proposed modification. I do agree that moving the PCSM BMP’s closer to the well pad will reduce the overall footprint and minimize the amount offarm land impacted by the well pad. While reviewing the newest ESCGP permit it was noted that one wetland is noted on the north side of the well pad. The area delineated as a wetland is currently in the middle of the land

2773956 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. Methanol tank on location. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2056390 636053 04/02/2012 2012-04-02 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. Administrative failure to provide: erosion contril matting other erosion control for swale between fill slope and topsoil stockpile, failure to stabilize access road swales and ditches, no rock at culverts, no stockpile at RCE, RCE not maintained.
2056390 636054 04/02/2012 2012-04-02 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. Administrative Lack of temp. stabilization: for pad fill slopes, topsoil stockpile.
2056390 636055 04/02/2012 2012-04-02 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety 102.4(b)2: failure to follow plan. construction sequence specifies that access road be stabilized before major pad work. Access road not stabilized, pad work near completion, impoundment work started.

For data sources see[8]

References