37-081-21113

Well Details

Well ID: 37-081-21113
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cascade Township
Operator Name: ARD OPR LLC
Well Pad ID: 149066
Farm/Lease Name: PLANTS EVERGREEN FARMS A 211H
License Status:
Spud Date:
Permit Date: 2013-01-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.444306
Longitude: -76.864842

For data sources see[1][2][3]

Well History

Date Event
2013-01-31 New Permit Application
2013-03-22 Performed Spud Operation
2013-06-11 Drilling Completion
2013-09-14 Perforation
2014-02-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-22 2013-09-27 6,709 2,400,990 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Trican Well Service Proppant Quartz 14808-60-7 99 16.7087 4,058,350.0
Hexamethylenetretramine 100-97-0 1 0.168775 40993.4
FEAC-20 Trican Well Service Iron Control Citric Acid 77-92-9 30 0.0013622 330.863
Acetic Acid 64-19-7 50 0.00227034 551.438
Aqucar DB 5 Trican Well Service Biocide Sodium bromide 7647-15-6 1.5 0.000689616 167.499
Polyethylene glycol 25322-68-3 65.2 0.0299753 7280.63
Dibromoacetonitrile 3252-43-5 50 0.0229872 5583.31
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5 0.00229872 558.331
FR-15 Trican Well Service Friction Reducer Proprietary Amide Proprietary 2.5 0.00194386 472.139
Paraffinic, Naphthenic Solvent 64742-47-8 25 0.0194386 4721.39
AI-7NR Trican Well Service Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 1 0.00001924 4.673
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100 82.492 20,036,300.0
Hydrochloric Acid (7.5%) Trican Well Service Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0375183 9112.74
Water 7732-18-5 92.5 0.462726 112390
Bio-Clear 1000 Trican Well Service Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 98 0.00008877 21.56

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 ANADARKO E&P ONSHORE LLC 67,533.00 12 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 1,072,212.00 273 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 149,826.00 116 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 257,222.00 348 0.00 0 0.00 0
2017 ARD OPR LLC 113,736.68 309 0.00 0 0.00 0
2018 ARD OPR LLC 114,306.01 345 0.00 0 0.00 0
2019 ARD OPR LLC 94,086.64 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 ANADARKO E&P ONSHORE LLC Drill Cuttings 21.14 Tons LANDFILL 301626
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 988.62 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 6,223.94 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 689.92 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 606.01 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 13.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 14.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 167.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 107.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 3.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2017 ARD OPR LLC Produced Fluid 25.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 3.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 61.04 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 119.19 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2153073 Primary Facility 2013-03-27 Routine/Complete Inspection No Violations Noted
2213958 Primary Facility 2013-10-16 Routine/Complete Inspection No Violations Noted
2465527 Primary Facility 2016-03-16 Routine/Complete Inspection No Violations Noted At the time of the inspection, eight wells were in production. The well site is predominantly vegetated but erosion and was noted on the topsoil stockpile and the area lacks adequate vegetation to prevent accelerated erosion. In addition, the well site remains at the originally constructed size and has not been restored as indicated in the permitted plans. The requirement under Section 3216 (c) of the Oil and Gas Act requires that "within nine months after completion of drilling of a well, the owner or operator shall restore the well site." The approved plans call for a portion of the well site to be scarified and production facilities are installed where the site is to be scarified. I recommend re-permitting the site to incorporate a feasible restoration of the site. No Violations Noted
2583454 Primary Facility 2017-04-13 Routine/Complete Inspection No Violations Noted Plants Evergreen A209H: Could not read top gauge, 9-5/8” x 5-1/2”: 72 psi.

Plants Evergreen A2H: Top gauge: 0 psi, 0 9-5/8” x 5-1/2”: 0 psi, well not in production Plants Evergreen A4H: Top gauge, could not read exactly, >1000 psi, 9-5/8” x 5-1/2”: 0 psi Plants Evergreen A6H: Top gauge: 960 psi Plants Evergreen A211H: Top gauge: 1066 psi, 9-5/8x 5-1/2: 471 psi. mechanical lift. These signs were: rust at the lower part of the fitting, salt crystals at the lower portion of the joint, rusty discoloration on the pad below. Plants Evergreen A210H: Top gauge: could not read exactly, > 900 psi, 9-5/8” x 5-1/2”: 1 psi

Called Rick Hall and sent photos of the leaks, which were addressed by replacing the fittings, and using a shovel to remove the discharge on the pad, which was minor. There were no violations observed at the time of my inspection. Left location @ 13:50.

2755637 Primary Facility 2018-07-13 Routine/Complete Inspection No Violations Noted Notice of Termination Inspection; 7/13/2018.

The wells onsite are in production and workers leaving the site said they had just finished painting the wellheads. The site is permanently stabilized and Post Construction Stormwater Management has been implemented using the natural vegetated filter strip. I recommend approving the NOT request and I recommend approving the Well Site Restoration Report when it is submitted.

For data sources see[8]

References