If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-21281 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.346389,"lon":-76.95895,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Gamble Township | |
Operator Name: INFLECTION ENERGY (PA) LLC | |
Well Pad ID: 149762 | |
Farm/Lease Name: STUNNER SMITH 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-08-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.346389 | |
Longitude: -76.958950 |
Date | Event |
---|---|
Newly Drilled | |
2013-08-19 | New Permit Application |
2017-05-19 | Begin Plugging |
2017-05-19 | Finished Plugging |
2018-03-29 | New Permit Application |
2018-10-19 | MOD |
2018-11-10 | Performed Spud Operation |
2019-01-25 | MOD |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | INFLECTION ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | INFLECTION ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | INFLECTION ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | INFLECTION ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | INFLECTION ENERGY (PA) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | INFLECTION ENERGY (PA) LLC | 605,659.87 | 68 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | INFLECTION ENERGY LLC | Drill Cuttings | 286.65 Tons | LANDFILL | 301626 |
2014 | INFLECTION ENERGY LLC | Drill Cuttings | 286.65 Tons | LANDFILL | 301626 |
2018 | INFLECTION ENERGY (PA) LLC | Synthetic Liner Materials | 0.38 Tons | LANDFILL | 100955 |
2018 | INFLECTION ENERGY (PA) LLC | Drill Cuttings | 266.13 Tons | LANDFILL | 100955 |
2018 | INFLECTION ENERGY (PA) LLC | Other Oil & Gas Wastes | 140.00 Bbl | REUSE (AT WELL PAD) | |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 3,604.64 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | INFLECTION ENERGY (PA) LLC | Synthetic Liner Materials | 17.90 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 796.25 Bbl | REUSE (AT WELL PAD) | |
2019 | INFLECTION ENERGY (PA) LLC | Other Oil & Gas Wastes | 147.50 Bbl | REUSE (AT WELL PAD) | |
2019 | INFLECTION ENERGY (PA) LLC | Soil Contaminated by Oil & Gas Related Spills | 37.03 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 8,854.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 4.68 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Drilling Fluid Waste | 1,148.33 Bbl | REUSE (AT WELL PAD) | |
2019 | INFLECTION ENERGY (PA) LLC | Drill Cuttings | 1,892.92 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | INFLECTION ENERGY (PA) LLC | Soil Contaminated by Oil | 37.03 Tons | LANDFILL | 100955 |
2019 | INFLECTION ENERGY (PA) LLC | Filter Socks | 0.02 Tons | LANDFILL | 301626 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2209516 | Primary Facility | 2013-10-02 | Routine/Complete Inspection | No Violations Noted | |
2246460 | Primary Facility | 2014-02-19 | Routine/Complete Inspection | No Violations Noted | |
2247499 | Primary Facility | 2014-02-20 | Drilling/Alteration | No Violations Noted | |
2254935 | Primary Facility | 2014-03-18 | Routine/Partial Inspection | No Violations Noted | |
2261499 | Primary Facility | 2014-04-02 | Routine/Partial Inspection | No Violations Noted | H&P 354 onsite drilling the 081-21286 well, modular tank onsite storing flowback. No Vio. |
2299102 | Primary Facility | 2014-08-27 | Routine/Complete Inspection | No Violations Noted | |
2435554 | Primary Facility | 2015-12-17 | Routine/Complete Inspection | No Violations Noted | 081-21281: Department records indicate a SPUD date of 8/21/2013 for well 081-21281 (Stunner Smith 5H) yet the well was not located on the well site. |
2461950 | Primary Facility | 2016-03-01 | Routine/Complete Inspection | No Violations Noted | 7 wells spudded on site and a large above-ground water tank. There was a hose in place between the water tank and the produced water tanks on site. This well is a plugged conductor. Note permiting and reporting discrepancies associated with other wells on this pad. |
2554206 | Primary Facility | 2017-01-12 | Routine/Complete Inspection | No Violations Noted | Conductor only |
2570902 | Primary Facility | 2017-03-13 | Administrative/File Review | Violation(s) Noted | Administrative Inspection Record created for the purpose of entering Enforcement Record for failure to plug an abandoned well.
Well was plugged and the Plugging Certificate was reviewed and approved. VIOL resolved as CRCTD on the date the PLUGC was approved (7/5/2017). ~CMB~ |
2597321 | Primary Facility | 2017-05-24 | Routine/Complete Inspection | No Violations Noted | Routine Inspection of (3) conductors on Inflection’s Smith pad; the #5 (081-21281), #6 (081-21282), and #4 (081-21280). Notice of Intent to plug the conductors was recently received. All (3) conductors were capped and visible ground level time of inspection. No major issues at this time were noted. |
2610469 | Primary Facility | 2017-07-05 | Administrative/File Review | No Violations Noted | July 5th 2017: Certificate of Well Plugging for this conductor has been received, reviewed, signed, and sent to file. |
2686984 | Primary Facility | 2018-01-23 | Routine/Complete Inspection | No Violations Noted | Arrived at 13:15. Weather: warm, sunny, T¿s in upper 40s. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692¿ with a plug from 6648¿ to 6144. IC casing to 3018¿. SS 3H: TD 6621¿, IC casing to 3007. For both wells, methane was leaking (few bubbles, slow rate) from the join between the intermediate vent pipe and the intermediate casing (Altair 5X gas meter calibrated on 1/1/23/17). Notified Greg Malekos of the leaks. For the SS 6H, a plugged conductor, all that was visible was a gravel filled cellar. For the SS 4H and SS 5H, also plugged, the cellars were filled with water. The surface hole locations for the plugged conductors were updated in eFACTS to address locational discrepancies observed in the field. |
2696678 | Primary Facility | 2018-02-22 | Follow-up Inspection | No Violations Noted | Arrived at 7:40. Weather: rainy, temperatures in low 40's. There are 7 wells. The Stunner Smith 1H and Ryder Park 1H are in production. Stunner Smith 2H and 3H are top-holed. SS 2H: TD 6692' with a plug from 6648' to 6144'. IC casing to 3018'. SS 3H: TD 6621', IC casing to 3007. This is a follow up IR to see if methane is still leaking from the join between the intermediate vent pipe and the intermediate casing. It was. Will schedule follow-up with Inflection. For the SS 6H, a plugged conductor, all that was visible was a gravel filled cellar. For the SS 4H and SS 5H, also plugged, the cellars were filled with water. |
2817865 | Primary Facility | 2018-12-17 | Routine/Complete Inspection | No Violations Noted | Weather was 30° and cloudy at time of inspection. Met with Inflection representative Ross Drnjevich on location. Well was a spud conductor. Conductor casing had a steel plate covering it at time of inspection. Cellar was empty and clean. No violations were noted at time of inspection. |
2818954 | Primary Facility | 2018-12-26 | Routine/Complete Inspection | No Violations Noted | A H&P rig is drilling on the Smith Well pad. The Department representative did not locate the rig manager so Department could not determine which well was being drilled.
The site had a primary containment overlaid with wood plank rig matting with beveled edges (see photo). All materials held on containment and within secondary containment. The overall site conditions were clean and well organized. No leaks or spills detected. No violations. |
2822750 | Primary Facility | 2019-01-03 | Routine/Complete Inspection | No Violations Noted | Weather was 38° and cloudy at time of inspection. Met with Inflection representatives Jamie Czerneski and Greg Malekos on location. Well was covered with a steel plate at time of inspection. This well recently had the surface 18 5/8" casing cemented after the rig skidded back to the 10H to begin drilling the first intermediate. Reviewed the job log from the cement job and no discrepancies were noted at time of inspection. Rig will move back to drill subsequent strings. No violations were noted at time of inspection. |
2827944 | Primary Facility | 2019-01-15 | Routine/Complete Inspection | No Violations Noted | Weather was 25° and sunny at time of inspection. Met with Inflection representatives Ross Drjnevitch and Greg Malekos on location. Well recently had the first intermediate string of 13 3/8" casing drilled. They were intending on cementing this string of casing tomorrow (1/16/19). Well was closed in at time of inspection with a nightcap. Water in the cellar was frozen solid at time of inspection. No violations were noted at time of inspection. |
2835459 | Primary Facility | 2019-02-05 | Routine/Complete Inspection | No Violations Noted | Weather was 37° and sunny at time of inspection. Met with Inflection representatives Greg Malekos on location. Well recently had the first intermediate string of 13 3/8" casing drilled and cemented. Well was closed in at time of inspection with a nightcap. Water in the cellar was frozen solid at time of inspection. No violations were noted at time of inspection. |
2840026 | Primary Facility | 2019-02-13 | Routine/Complete Inspection | No Violations Noted | Weather was 30° and cloudy at time of inspection. Met with Inflection representative Jamie Czerneski on location. This well was shut in with a night cat at time of inspection. 0% combustible gas was detected in the cellar at time of inspection. Well is being batch drilled with 5 other wells on location. No violations were noted at time of inspection. |
2842020 | Primary Facility | 2019-02-20 | Routine/Complete Inspection | No Violations Noted | Weather- 21 degrees and cloudy at time of inspection
Met with Inflection representative Ross Drjnevitch and Greg Malekos on location. Well was closed in with a nightcap at time of inspection. Wells on pad are being batch drilled. No violations noted at time of inspection. |
2844696 | Primary Facility | 2019-02-26 | Routine/Complete Inspection | No Violations Noted | Weather was 24 degrees and sunny at time of inspection. Met with Inflection representative Ross Drjnevitch on location. This well was shut in with a night cap. This well will be completed at a later date. No violations at time of inspection. |
2849881 | Primary Facility | 2019-03-07 | Routine/Complete Inspection | No Violations Noted | Weather was 12 degrees and sunny. Met with Inflection representative Jamie Czerneski and Greg Malekos on location. Rig was in process of drilling 12 1/4' hole for the second intermediate casing. They were currently at a depth of 7013'. Hole will be drilled to an estimated TD of 8300'. They were estimating to cement around noon on Saturday 3/9/2019. Drilling rig will remain on this well and switch over to oil based mud to drill the production casing hole. No violations noted at time of inspection. |
2852764 | Primary Facility | 2019-03-13 | Routine/Complete Inspection | No Violations Noted | Weather was 30 degrees and sunny. Met with Inflection representative Ross Drnjevich on location. Rig recently cemented its second intermediate casing. Reviewed the job log and no discrepancies were noted at time of inspection. Rig was in process of drilling 8 1/2' hole for the production casing. They were currently at a depth of 8227'. Hole will be drilled to an estimated TD of 15600'. No violations noted at time of inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2570902 | 780481 | 2017-03-13 | 2017-07-05 | 78a91(a) | Environmental Health & Safety | The Stunner Smith 5H well was spud August 21, 2013 and was drilled to a depth necessary to set conductor casing under the authorization of well permit number 081-21281. The well permit for 081-21281 expired August 19, 2014. The well remains a conductor and has had no drilling activity since 2013. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
780481 | 351608 | NOV - Notice of Violation | 2017-07-05 |
For data sources see[7]