If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-21316 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.474219,"lon":-77.245389,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Pine Township | |
Operator Name: ARD OPR LLC | |
Well Pad ID: 150103 | |
Farm/Lease Name: TEXAS BLOCKHOUSE B 8H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-09-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.474219 | |
Longitude: -77.245389 |
Date | Event |
---|---|
2013-09-27 | New Permit Application |
2013-10-08 | Performed Spud Operation |
2014-01-15 | Drilling Completion |
2014-04-04 | Perforation |
2015-01-02 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-23 | 2014-04-30 | 7,575 | 3,787,200 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FEAC-20 | Trican Well Service | Iron Control | Citric Acid | 77-92-9 | 30 | 0.00201159 | 756.257 |
Acetic Acid | 64-19-7 | 50 | 0.00335265 | 1260.43 | ||||
Water | Anadarko | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.0649 | 31,604,200.0 | |
Sand (Proppant) | Trican Well Service | Proppant | Quartz | 14808-60-7 | 99 | 14.8986 | 5,601,140.0 | |
Hexamethylenetretramine | 100-97-0 | 1 | 0.150491 | 56577.2 | ||||
FR-15 | Trican Well Service | Friction Reducer | Proprietary Amide | Proprietary | 2.5 | 0.00225701 | 848.524 | |
Paraffinic, Naphthenic Solvent | 64742-47-8 | 25 | 0.0225701 | 8485.24 | ||||
AI-7NR | Trican Well Service | Corrosion Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00002841 | 10.682 | |
Aqucar DB 100 | Trican Well Service | Biocide | 2,2-Dibromomalonamide | 73003-80-2 | 0.2 | 0.00000035 | 0.13 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 97 | 0.000167708 | 63.05 | ||||
Hydrochloric Acid (7.5%) | Trican Well Service | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0554039 | 20829.1 | |
Water | 7732-18-5 | 92.5 | 0.683315 | 256892 | ||||
Aqucar DB 5 | Trican Well Service | Biocide | Sodium bromide | 7647-15-6 | 1.5 | 0.000709081 | 266.579 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5 | 0.0023636 | 888.597 | ||||
Dibromoacetonitrile | 3252-43-5 | 50 | 0.023636 | 8885.97 | ||||
Polyethylene glycol | 25322-68-3 | 65.2 | 0.0308214 | 11587.3 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | ANADARKO E&P ONSHORE LLC | 182,382.00 | 41 | 0.00 | 0 | 0.00 | 0 |
2015 | ANADARKO E&P ONSHORE LLC | 370,403.00 | 121 | 0.00 | 0 | 0.00 | 0 |
2016 | ANADARKO E&P ONSHORE LLC | 811,444.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2017 | ARD OPR LLC | 428,776.25 | 339 | 0.00 | 0 | 0.00 | 0 |
2018 | ARD OPR LLC | 311,051.34 | 323 | 0.00 | 0 | 0.00 | 0 |
2019 | ARD OPR LLC | 265,054.40 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | ANADARKO E&P ONSHORE LLC | Drill Cuttings | 687.74 Tons | LANDFILL | 301626 |
2014 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 8,781.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 9,413.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 314.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 165.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 206.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 308.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 1,605.16 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 5,205.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 1,445.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 72.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | ARD OPR LLC | Produced Fluid | 129.16 Bbl | REUSE (AT WELL PAD) | |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 242.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ARD OPR LLC | Produced Fluid | 117.42 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | ARD OPR LLC | Produced Fluid | 18.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ARD OPR LLC | Produced Fluid | 337.47 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Produced Fluid | 378.68 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Produced Fluid | 58.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2218413 | Primary Facility | 2013-10-30 | Routine/Complete Inspection | No Violations Noted | |
2232127 | Primary Facility | 2013-12-19 | Routine/Partial Inspection | No Violations Noted | |
2266686 | Primary Facility | 2014-04-09 | Drilling/Alteration | No Violations Noted | |
2267228 | Primary Facility | 2014-05-01 | Routine/Complete Inspection | No Violations Noted | |
2476854 | Primary Facility | 2016-04-13 | Routine/Complete Inspection | No Violations Noted | |
2671463 | Primary Facility | 2017-12-13 | Routine/Complete Inspection | No Violations Noted | Weather was 19° and cloudy at time of inspection. There were no ARD representatives on location at time of inspection. Well has a digital pressure gauge attached above swab valve, on the 5 1/2 x 9 5/8 annulus and on the production casing. Tubing pressure read 987 psi, casing pressure was 1121 and annulus pressure was 1161 psi at time of inspection. There appeared to be a spray pattern of an oily substance originating from a valve on the well head that extended out approximately 10-12 feet from the well head. Oily substance was also caked to the yellow guard rail that surrounds the wells on location. |
2816390 | Primary Facility | 2018-12-13 | Routine/Complete Inspection | No Violations Noted | On December 13, 2018, Department representative Brad Kline conducted a routine site inspection at ARD Operating , LLC. (Pad name). Monthly tank maintenance log was onsite for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 6 producing wells located on this well pad. One plugged well was also on the pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 GPU’s and 4 steel vertical production fluids tanks onsite. Both GPUs and production fluid tanks were stationed in secondary containment. No violations noted. |
2816392 | Primary Facility | 2018-12-13 | Routine/Complete Inspection | No Violations Noted | On December 13, 2018, Department representative Brad Kline conducted a routine site inspection at ARD Operating , LLC. (Pad name). Monthly tank maintenance log was onsite for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 6 producing wells located on this well pad. One plugged well was also on the pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 GPU’s and 4 steel vertical production fluids tanks onsite. Both GPUs and production fluid tanks were stationed in secondary containment. No violations noted. |
For data sources see[8]