If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-21318 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.474239,"lon":-77.245225,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Pine Township | |
Operator Name: ARD OPR LLC | |
Well Pad ID: 150103 | |
Farm/Lease Name: TEXAS BLOCKHOUSE B 11H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-09-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.474239 | |
Longitude: -77.245225 |
Date | Event |
---|---|
2013-09-27 | New Permit Application |
2013-10-11 | Performed Spud Operation |
2013-12-12 | Drilling Completion |
2014-04-02 | Perforation |
2015-01-02 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-08 | 2014-04-21 | 7,650 | 3,382,600 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Anadarko | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.6896 | 28,227,800.0 |
AI-7NR | Trican Well Service | Corrosion Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00002804 | 9.346 | |
FR-15 | Trican Well Service | Friction Reducer | Proprietary Amide | Proprietary | 2.5 | 0.00235733 | 785.719 | |
Paraffinic, Naphthenic Solvent | 64742-47-8 | 25 | 0.0235733 | 7857.19 | ||||
FEAC-20 | Trican Well Service | Iron Control | Acetic Acid | 64-19-7 | 50 | 0.00330886 | 1102.88 | |
Citric Acid | 77-92-9 | 30 | 0.00198532 | 661.725 | ||||
Aqucar DB 100 | Trican Well Service | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 97 | 0.000247368 | 82.45 | |
2,2-Dibromomalonamide | 73003-80-2 | 0.2 | 0.00000051 | 0.17 | ||||
Hydrochloric Acid (7.5%) | Trican Well Service | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0546804 | 18225.5 | |
Water | 7732-18-5 | 92.5 | 0.674392 | 224781 | ||||
Aqucar DB 5 | Trican Well Service | Biocide | Polyethylene glycol | 25322-68-3 | 65.2 | 0.0310066 | 10334.8 | |
Sodium bromide | 7647-15-6 | 1.5 | 0.000713343 | 237.764 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5 | 0.00237781 | 792.546 | ||||
Dibromoacetonitrile | 3252-43-5 | 50 | 0.0237781 | 7925.45 | ||||
Sand (Proppant) | Trican Well Service | Proppant | Hexamethylenetretramine | 100-97-0 | 1 | 0.144298 | 48095.8 | |
Quartz | 14808-60-7 | 99 | 14.2855 | 4,761,480.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | ANADARKO E&P ONSHORE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | ANADARKO E&P ONSHORE LLC | 148,592.00 | 37 | 0.00 | 0 | 0.00 | 0 |
2015 | ANADARKO E&P ONSHORE LLC | 344,436.00 | 121 | 0.00 | 0 | 0.00 | 0 |
2016 | ANADARKO E&P ONSHORE LLC | 891,534.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2017 | ARD OPR LLC | 513,697.42 | 341 | 0.00 | 0 | 0.00 | 0 |
2018 | ARD OPR LLC | 394,885.01 | 340 | 0.00 | 0 | 0.00 | 0 |
2019 | ARD OPR LLC | 353,924.67 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | ANADARKO E&P ONSHORE LLC | Drill Cuttings | 785.62 Tons | LANDFILL | 301626 |
2014 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 9,674.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 5,760.96 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 261.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 125.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 176.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 194.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 1,454.81 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 4,467.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 1,097.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 48.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | ARD OPR LLC | Produced Fluid | 91.58 Bbl | REUSE (AT WELL PAD) | |
2017 | ANADARKO E&P ONSHORE LLC | Produced Fluid | 153.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ARD OPR LLC | Produced Fluid | 179.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | ARD OPR LLC | Produced Fluid | 27.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | ARD OPR LLC | Produced Fluid | 495.23 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Produced Fluid | 422.98 Bbl | REUSE (AT WELL PAD) | |
2019 | ARD OPR LLC | Produced Fluid | 84.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2218415 | Primary Facility | 2013-10-30 | Routine/Complete Inspection | No Violations Noted | |
2219566 | Primary Facility | 2013-11-05 | Drilling/Alteration | No Violations Noted | |
2232130 | Primary Facility | 2013-12-19 | Routine/Partial Inspection | No Violations Noted | |
2266689 | Primary Facility | 2014-04-09 | Drilling/Alteration | No Violations Noted | |
2267230 | Primary Facility | 2014-05-01 | Routine/Complete Inspection | No Violations Noted | |
2476856 | Primary Facility | 2016-04-13 | Routine/Complete Inspection | No Violations Noted | |
2671453 | Primary Facility | 2017-12-13 | Routine/Complete Inspection | No Violations Noted | Weather was 19° and cloudy at time of inspection. There were no ARD representatives on location at time of inspection. Well has a digital pressure gauge attached above swab valve, on the 5 1/2 x 9 5/8 annulus and on the production casing. Tubing pressure read 474 psi, casing pressure was 1228 and annulus pressure was 1537 psi at time of inspection. There appeared to be a spray pattern of an oily substance originating from a valve on the well head that extended out approximately 10-12 feet from the well head. Oily substance was also caked to the yellow guard rail that surrounds the wells on location. |
2816398 | Primary Facility | 2018-12-13 | Routine/Complete Inspection | No Violations Noted | On December 13, 2018, Department representative Brad Kline conducted a routine site inspection at ARD Operating , LLC. (Pad name). Monthly tank maintenance log was onsite for review. No E&S issues were observed during the time of inspection. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.
There are a total of 6 producing wells located on this well pad. One plugged well was also on the pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 6 GPU’s and 4 steel vertical production fluids tanks onsite. Both GPUs and production fluid tanks were stationed in secondary containment. No violations noted. |
For data sources see[8]