37-081-21333

Well Details

Well ID: 37-081-21333
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cummings Township
Operator Name: PA GEN ENERGY CO LLC
Well Pad ID: 150215
Farm/Lease Name: COP TRACT 322 PAD E 2686
License Status: INACTIVE
Spud Date:
Permit Date: 2013-10-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.407886
Longitude: -77.349978

For data sources see[1][2][3]

Well History

Date Event
2013-10-01 New Permit Application
2014-06-14 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-07 2018-05-15 8,220 10,509,400 1,396,880

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unislik ST50 UPP Friction Reducer Listed Below
Unihib G UPP Corrosion Inhibitor Listed Below
Polylactide Resin 9051-89-2 98 0.0018
Polyethylene glycol 25322-68-3 50 0.004
Ethylene Glycol 107-21-1 40 0.0036
Formaldehyde 50-00-0 1 0.00000830
Water 7732-18-5 100 88.78
Alcohols 68439-50-9 5 0.0034
Alcohols 68002-97-1 5 0.0034
Ethoxylated alcohol 68002-97-1 50 0.0004
Methanol 67-56-1 5 0.0004
Ammonium acetate 631-61-8 13 0.0088
Thourea 62-56-6 1 0.00000830
Crystalline Silica 14808-60-7 100 10.7
Butyl glycol 112-34-5 75 0.00062
Hydrotreated Light Disillate 64742-47-8 30 0.0203
Alcohols 68551-12-2 5 0.0034
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 21 0.0017
Water PGE Carrier/Base Fluid Listed Below
K-BAC 1020 UPP Biocide Listed Below
Scale Hib PE-18 UPP Scale Inhibitor Listed Below
Sand CWS Proppant Listed Below
SureVerter UPP Diverter Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2015 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2016 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2017 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2018 PA GEN ENERGY CO LLC 511,370.00 139 0.00 0 0.00 0
2019 PA GEN ENERGY CO LLC 930,544.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 PA GEN ENERGY CO LLC Drilling Fluid Waste 1,005.14 Bbl REUSE OTHER THAN ROAD SPREADING
2014 PA GEN ENERGY CO LLC Drill Cuttings 102.32 Tons LANDFILL 301626
2014 PA GEN ENERGY CO LLC Drill Cuttings 1,173.27 Tons LANDFILL 100955
2014 PA GEN ENERGY CO LLC Drilling Fluid Waste 170.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 PA GEN ENERGY CO LLC Drilling Fluid Waste 376.07 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2018 PA GEN ENERGY CO LLC Produced Fluid 957.80 Bbl INJECTION DISPOSAL WELL 34-133-20525
2018 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 66.00 Bbl REUSE (AT WELL PAD)
2018 PA GEN ENERGY CO LLC Produced Fluid 1,490.80 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PA GEN ENERGY CO LLC Produced Fluid 3,592.40 Bbl REUSE (AT WELL PAD)
2018 PA GEN ENERGY CO LLC Produced Fluid 1,152.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018 PA GEN ENERGY CO LLC Produced Fluid 1,029.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 PA GEN ENERGY CO LLC Synthetic Liner Materials 1.21 Tons LANDFILL 301358
2018 PA GEN ENERGY CO LLC Produced Fluid 536.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 PA GEN ENERGY CO LLC Produced Fluid 231.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 PA GEN ENERGY CO LLC Produced Fluid 1,949.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 PA GEN ENERGY CO LLC Produced Fluid 1,303.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PA GEN ENERGY CO LLC Produced Fluid 1,084.60 Bbl INJECTION DISPOSAL WELL 34-007-24355
2018 PA GEN ENERGY CO LLC Produced Fluid 4,881.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 PA GEN ENERGY CO LLC Produced Fluid 3,267.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 PA GEN ENERGY CO LLC Produced Fluid 7,776.60 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 PA GEN ENERGY CO LLC Waste Water Treatment Sludge 5.47 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 PA GEN ENERGY CO LLC Produced Fluid 8,611.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 PA GEN ENERGY CO LLC Produced Fluid 658.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 PA GEN ENERGY CO LLC Produced Fluid 326.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2018 PA GEN ENERGY CO LLC Produced Fluid 402.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 PA GEN ENERGY CO LLC Produced Fluid 817.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 PA GEN ENERGY CO LLC Produced Fluid 2,782.60 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 PA GEN ENERGY CO LLC Produced Fluid 630.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 PA GEN ENERGY CO LLC Produced Fluid 25.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 PA GEN ENERGY CO LLC Produced Fluid 757.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 PA GEN ENERGY CO LLC Produced Fluid 1,816.60 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 PA GEN ENERGY CO LLC Produced Fluid 42.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 PA GEN ENERGY CO LLC Other Oil & Gas Wastes 82.00 Bbl REUSE (AT WELL PAD)
2019 PA GEN ENERGY CO LLC Produced Fluid 327.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 PA GEN ENERGY CO LLC Produced Fluid 3,610.20 Bbl REUSE (AT WELL PAD)
2019 PA GEN ENERGY CO LLC Produced Fluid 615.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2019 PA GEN ENERGY CO LLC Produced Fluid 5,539.60 Bbl INJECTION DISPOSAL WELL 34-155-24079

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2276591 Primary Facility 2014-05-27 Preoperation Inspection No Violations Noted The site signage, well pad, and access road have all been completed. Previously disturbed soils have been seeded and stabilized. Vegetation is beginning to grow throughout the site. Overall, the site is in good condition and no E&S issues were observed. Please be mindful of the sharp curves on the access road near the entrance and plan to maintain accordingly. It's probable that truck traffic may have difficulty staying on the road.
2303572 Primary Facility 2014-09-10 Routine/Complete Inspection No Violations Noted Routine Inspection with Sue Herzing (DEP); 9/10/2014.
2305270 Primary Facility 2014-09-16 Routine/Complete Inspection No Violations Noted
2386840 Primary Facility 2015-07-10 Routine/Complete Inspection No Violations Noted No Bubbles in Cellar / Location clean
2463084 Primary Facility 2016-03-09 Routine/Complete Inspection No Violations Noted
2728677 Primary Facility 2018-05-03 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection of PGE's COP Tract 322 Pad E on May 1, 2018 with company man Matt Cobine.

A fracking operation was going on during my inspection. Crews were in the process of fracking wells 081-21330 and 081-213331. All fracking equipment, diesel tanks, etc. were stationed on secondary containment with a berm. No sign of rips were observed in the containment. No water was observed on the containment. Overall, the containment looked great.

Above ground double walled 4" HDEP water lines were pumping water from nearby PGE freshwater impoundments (FWI). The water line configuration is the following: a 4" double walled HDEP pipe is running above ground from PGEs COP Tract 293 A FWI and discharging into COP Tract 293 WI 2 impoundment. Water from COP Tract 293 WI 2 is being withdrawn from this impoundment and going into the buried water line running paralleling Okome Rd. and this waterline is discharging into Tract 322 FWI. From there (2) generators are

2738659 Primary Facility 2018-06-05 Routine/Complete Inspection No Violations Noted I met Matt Covine when I arrived. Frac was finished, activity on location included moving metal drip pans/rig mats and cleaning out Baker tanks. A Matt believes that flowback operations will not begin until mid-July. Site was clean, most containment had been removed. Near the well heads, moving the large drip pans had exposed a small amount (2-3 gallons) of water on the liner; conductance readings were over my meter's limit (19.99 mS/cm). Matt was aware of the water and had a vac truck ready to clean the area.

For data sources see[8]

References