If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-081-21335 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.326114,"lon":-76.874378,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Lycoming | |
| Municipality: Upper Fairfield Township | |
| Operator Name: INFLECTION ENERGY (PA) LLC | |
| Well Pad ID: 150097 | |
| Farm/Lease Name: ALLEGHENY RIDGE WEST HILLEGAS | |
| License Status: Active | |
| Spud Date: 2013-11-08 | |
| Permit Date: 2013-10-09 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.326114 | |
| Longitude: -76.874378 |
| Date | Event |
|---|---|
| 2013-10-09 | New Permit Application |
| 2013-10-31 | Performed Spud Operation |
| 2013-11-01 | Begin Plugging |
| 2013-11-01 | Finished Plugging |
| 2014-06-12 | Fully Plugged |
| 2018-01-03 | MOD |
For data sources see[4]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-05-28 | 2014-06-03 | 9,103 | 7,865,090 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00023 | 165 |
| WFRA-405 | U.S. Well Services | Friction Reducer | Petroleum Distillates | 64742-47-8 | 22 | 0.0009 | 655.794 | |
| Anionic Polyacrylamide | 62649-23-4 | 40 | 0.00202 | 1481.18 | ||||
| Water | 7732-18-5 | 40 | 0.00202 | 1481.18 | ||||
| Ammonium Chloride | 12125-02-9 | 5 | 0.00025 | 185.148 | ||||
| Ethoxylate Alcohol | 68551-12-2 | 5 | 0.00025 | 185.148 | ||||
| Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 10.2447 | 7,501,520.0 | |
| SI-1100 | U.S. Well Services | Scale Inhibitor | bis (hexamethylene) tramine penta (methylene phosphonic acid) - phosphate acid |
40623-75-4 | 10 | 0.00206 | 1504.83 | |
| Acrylic polymer | 52255-49-9 | 5 | 0.00089 | 654.273 | ||||
| 2-Phosphonobutane 1,2,4 tricarboxylic salt | 37971-36-1 | 10 | 0.00231 | 1688.02 | ||||
| Ethylene Glycol | 107-21-1 | 40 | 0.00808 | 5914.63 | ||||
| Di Water | 7732-18-5 | 80 | 0.0143 | 10468.4 | ||||
| Potassium salt of diethylene triamine penta (methylene phosphonic acid) |
15827-60-8 | 10 | 0.00241 | 1766.54 | ||||
| hexamethylenediamine tetra (methylene phosphonic acid) | 38820-59-6 | 10 | 0.00223 | 1635.68 | ||||
| Copolymer of Maleic and Acrylic acid | 26677-99-6 | 10 | 0.00211 | 1544.08 | ||||
| K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Polyethylene Glycol | 25322-68-3 | 50 | 0.00947 | 6935.54 | |
| 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00829 | 6071.08 | ||||
| Water | 7732-18-5 | 20 | 0.00338 | 2476.98 | ||||
| HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17.5 | 0.04555 | 33356.7 | |
| Water | 7732-18-5 | 87.4 | 0.10952 | 80192.2 | ||||
| LGC-15 | U.S. Well Services | Gelling Agents | Petroleum Distillates | 64742-47-8 | 60 | 0.01203 | 8809.72 | |
| Guar Gum | 9000-30-0 | 50 | 0.00149 | 1093.5 | ||||
| Suspending agent (solid) | 14808-60-7 | 3 | 0.00009000 | 65.61 | ||||
| Surfactant | 68439-51-0 | 3 | 0.00076 | 558.131 | ||||
| AI-301 | U.S. Well Services | Acid Corrosion Inhibitors | Diethylene Glycol | 111-46-6 | 30 | 0.00017 | 123.188 | |
| Coco amine | 61791-14-8 | 5 | 0.00002000 | 16.8802 | ||||
| Hydrogen Chloride | 7647-01-0 | 10 | 0.00006000 | 42.5674 | ||||
| Methenamine | 100-97-0 | 20 | 0.00013 | 97.6114 | ||||
| Polyethylene polyamine | 68603-67-8 | 10 | 0.00005000 | 36.9529 | ||||
| WFRA-405e | U.S. Well Services | Friction Reducer | Petroleum Distillates | 64742-47-8 | 20 | 0.01422 | 10415.6 | |
| Sodium Chloride | 7647-14-5 | 20 | 0.01778 | 13016.3 | ||||
| Water | Inflection Energy | Base Fluid | Water | 7732-18-5 | 100 | 89.4922 | 65,529,200.0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2013 | INFLECTION ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2014 | INFLECTION ENERGY (PA) LLC | 199,536.00 | 152 | 0.00 | 0 | 0.00 | 0 |
| 2015 | INFLECTION ENERGY (PA) LLC | 454,937.19 | 357 | 0.00 | 0 | 0.00 | 0 |
| 2016 | INFLECTION ENERGY (PA) LLC | 419,073.18 | 360 | 0.00 | 0 | 0.00 | 0 |
| 2017 | INFLECTION ENERGY (PA) LLC | 382,649.00 | 330 | 0.00 | 0 | 0.00 | 0 |
| 2018 | INFLECTION ENERGY (PA) LLC | 317,646.00 | 270 | 0.00 | 0 | 0.00 | 0 |
| 2019 | INFLECTION ENERGY (PA) LLC | 279,057.04 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2013 | INFLECTION ENERGY LLC | Drill Cuttings | 309.01 Tons | LANDFILL | 301626 |
| 2013 | INFLECTION ENERGY LLC | Drilling Fluid Waste | 204.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
| 2014 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 1,283.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
| 2014 | INFLECTION ENERGY LLC | Drill Cuttings | 309.01 Tons | LANDFILL | 301626 |
| 2014 | INFLECTION ENERGY (PA) LLC | Fracturing Fluid Waste | 21.83 Tons | LANDFILL | 301626 |
| 2014 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 16,308.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2014 | INFLECTION ENERGY (PA) LLC | Fracing Fluid Waste | 39.05 Bbl | LANDFILL | 301626 |
| 2014 | INFLECTION ENERGY LLC | Drilling Fluid Waste | 204.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
| 2014 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 4,883.23 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
| 2014 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 1,944.52 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
| 2015 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 16,801.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 9,418.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2016 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 140.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2016 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 60.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
| 2017 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 231.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
| 2017 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 1,807.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2017 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 1,139.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
| 2017 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 1,527.00 Bbl | REUSE (AT WELL PAD) | |
| 2017 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 963.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2017 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 126.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2018 | INFLECTION ENERGY (PA) LLC | Other Oil & Gas Wastes | 680.00 Bbl | REUSE (AT WELL PAD) | |
| 2018 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 1,603.00 Bbl | REUSE (AT WELL PAD) | |
| 2018 | INFLECTION ENERGY (PA) LLC | Other Oil & Gas Wastes | 50.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
| 2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 270.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
| 2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 5.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
| 2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 350.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
| 2019 | INFLECTION ENERGY (PA) LLC | Other Oil & Gas Wastes | 60.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
| 2019 | INFLECTION ENERGY (PA) LLC | Other Oil & Gas Wastes | 395.00 Bbl | REUSE (AT WELL PAD) | |
| 2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 1,310.00 Bbl | REUSE (AT WELL PAD) | |
| 2019 | INFLECTION ENERGY (PA) LLC | Produced Fluid | 280.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2216075 | Primary Facility | 2013-10-23 | Preoperation Inspection | No Violations Noted | pre-op insp. perimeter controls installed earthmoving underway. No Vio |
| 2222823 | Primary Facility | 2013-11-19 | Routine/Complete Inspection | No Violations Noted | |
| 2232124 | Primary Facility | 2013-12-19 | Routine/Partial Inspection | No Violations Noted | |
| 2254175 | Primary Facility | 2014-03-14 | Routine/Complete Inspection | No Violations Noted | 4 wells drilled to KOP, some minor erosion from weather/ lack of veg. growth. No Vio. |
| 2266761 | Primary Facility | 2014-04-11 | Drilling/Alteration | No Violations Noted | |
| 2430328 | Primary Facility | 2015-11-18 | Routine/Complete Inspection | No Violations Noted | After the operator provided photos of a discharge from the FWI; I arrived onsite to see if the previous discharge caused any issues. The FWI was not being dewatered and I fould no evidence of the previous discharge. I sent an email explaining I did not see violations at the time of the inspection. |
| 2430337 | Primary Facility | 2015-11-19 | Routine/Complete Inspection | No Violations Noted | The FWI was being dewatered the sed. basin. The water was flowing overland from the sedimentation basin, into the roadside ditch along Kaiser Hollow Road, and into an UNT to Loyalsock Creek. The UNT to Loyalsock Creek is designated Exceptional Value. I met with Inflection representatives who agreed to stop the discharge. At 14:20, I collected sample 3440257 from the outlet of the sedimentation. On 11/20/2015, I returned to the well pad and documented the impacts of this discharge. The Department’s observation of the discharge at the well pad is inconsistent with the approved permit. The permit states water will not be discharged from the FWI. The permit specifically states that runoff from the well pad and other impervious surfaces other than the access road will be directed to the FWI for the use in the well completions operations. Violations cited to the ESCGP. |
| 2435857 | Primary Facility | 2015-12-28 | Administrative/File Review | Violation(s) Noted | NOV for improper casing |
| 2446169 | Primary Facility | 2016-01-26 | Routine/Complete Inspection | No Violations Noted | |
| 2446175 | Primary Facility | 2016-02-02 | Follow-up Inspection | No Violations Noted | |
| 2472692 | Primary Facility | 2016-01-26 | Routine/Complete Inspection | No Violations Noted | |
| 2472700 | Primary Facility | 2016-04-06 | Routine/Complete Inspection | No Violations Noted | |
| 2502475 | Primary Facility | 2016-07-12 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 7/12/2016.
At the time of the inspection, a gasoline powered pump was being used to pump water to three sprinklers. Approximately, 5-10 feet of water were left in the bottom of the impoundment. The sprinklers were being used to discharge water onto well vegetated areas where silt sock remains downslope. No overland flow of any kind was visible from the dewatering operation. Prior to discharging, water was previously hauled via truck from the impoundment to reduce the volume in the impoundment. Overall, I appreciate the cautious approach to dewatering the impoundment. No Violations Noted. |
| 2506374 | Primary Facility | 2016-07-27 | Routine/Complete Inspection | No Violations Noted | I received a complaint (via voicemail) of water discharging at the entrance of the site and followed-up at 08:37. A the time of the inspection, the upgrades to the infiltration basin and access road were being implemented as part of the Post Construction Stormwater Management (PCSM) plans which are also planning on converting the Freshwater Impoundment into an infiltration basin. It appears the water coming down the access road was just water accumulated in a trench for an additional cross-culvert. It appears the water was simply scooped out with an excavator. I found no evidence that the water from the trench carried sediment offsite. Workers onsite were preparing to start the gasoline powered pump for dewatering the impoundment. No Violations Noted. |
| 2522915 | Primary Facility | 2016-09-27 | Routine/Complete Inspection | No Violations Noted | I entered the site off Kaiser Hollow Road at 10:00. At the time of the inspection, two wells (081-21337, 081-21335) were in production. The infiltration basin at the base of the access road appeared to be functioning properly since underdrains were installed and the outlet changed. The fresh water impoundment has been removed and approximately half of that area has been graded to the pad elevation. An infiltration basin has been installed covering the western half of the previous impoundment area. The basin has been graded and the outlet structure installed. In addition, the outlet structure on the basin southwest of the pad has been updated and an underdrain has been installed. The area of the removed impoundment (including surrounding slopes) is currently un-stabilized but the contractor’s onsite said they were planning on seeding and mulching the entire disturbed area today (9/27/2016). No Violations Noted. |
| 2526757 | Primary Facility | 2016-09-29 | Routine/Complete Inspection | No Violations Noted | I entered the site off Kaiser Hollow Road at 11:35 with Erin Gocek (DEP). At the time of the inspection, two wells (081-21337, 081-21335) were in production. A steady rain had been falling for several hours. The infiltration basin at the base of the access road appeared to be functioning properly since underdrains were installed and the outlet changed (as noted in my 9/27/2016 inspection report). Some water was overtopping the rubber diversion flap on the access road nearest to Kaiser Hollow Road. The infiltration basin appears to be infiltrating well and no water was entering the dewatering structure. The outside fill slopes were seeded and mulched but the infiltration basin area and the converted impoundment area were un-stabilized. No Violations Noted. |
| 2528471 | Primary Facility | 2016-10-03 | Routine/Complete Inspection | No Violations Noted | Arrived @ 11:24. Weather: cloudy, cool. There were 4 wells on location – 2 in production and 2 top-hole only. The impoundment along the northern side of the site was being removed.
For the gas wells, annular vents were monitored for methane gas with an Altair 5X gas meter calibrated on 10-3-16. ARWH 5H: Gravel in cellar. Well in production. There were two, 2-inch vents on either side of the wellhead and one, 1-inch vent. Field monitoring detected no methane at any of the annular vents. There were no violations for this well at the time of my inspection. Left location@ 12:00 |
| 2560396 | Primary Facility | 2017-02-08 | Complaint Inspection | No Violations Noted | Complaint Inspection; 2/8/2017.
On 2/6/2017, the complainant (CID#324908) contacted me. I was informed that beer bottles and trash found in the nearby woods led the complainant to discover evidence that someone had a campfire (including the burning of trash) on the well pad. The complainant explained that he had contacted Inflection Energy earlier that day and all of the trash and debris was removed and disposed of properly. The complaint documents the unauthorized use of the well pad by currently unidentified individuals. On 2/8/2017, I arrived onsite and walked to the southwest corner of the well pad. The trash and campfire residue had been thoroughly cleaned-up. Later, I talked to the complainant and explained that the complaint would be closed as of the inspection. Complaint Closed. The implementation of the PCSM Plans onsite appears to be functioning properly with exception of the level-spreader at the outlet of the infiltration basin. The level-spreader is already undermined and discharging |
| 2605669 | Primary Facility | 2017-06-20 | Administrative/File Review | Violation(s) Noted | Administrative Inspection entered for the purpose of entering an Enforcement Record (NOV).
VIOLS closed (CRCTD) 1/3/2018 upon issuance of permit modification. |
| 2637649 | Primary Facility | 2017-09-19 | Routine/Complete Inspection | No Violations Noted | 4 wells on location - 2 top-holed , and 2 in production. Wells are clearly labelled. Available annuli were monitored for combustible gas. No combustible gas was detected. Altair 5X gas meter calibrated 9/19/17). |
| 2776819 | Primary Facility | 2018-09-19 | Routine/Complete Inspection | No Violations Noted | Two wells staged for production (081-21335 and 081-21337). Two wells plugged (081-21314 and 081-21336). Two GPUs within containment. No leaks from production equipment. No violations.
Fresh water impoundment removed from site. |
| Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
|---|---|---|---|---|---|---|
| 2435857 | 742042 | 12/28/2015 | 2015-12-28 | 78.83(c) - CASING AND CEMENTING - SURFACE AND COAL PROTECTIVE CASING AND CEMENTING PROCEEDURES - Operator failed to drill to approximately 50 feet below the deepest fresh groundwater or at least 50 feet into consolidated rock, whichever is deeper, an | Environmental Health & Safety | |
| 2435857 | 742043 | 12/28/2015 | 2015-12-28 | OGA 3217(B) - Failure to prevent migration of gas or fluids into sources of fresh water causing pollution or diminution. Failure to properly case and cement well through a fresh water-bearing strata in regulated manner or depth. | Environmental Health & Safety | |
| 2605669 | 788455 | 2017-06-20 | 2018-01-03 | OGA3211(F1) | Administrative | Well was intentionally drilled at a Surface Hole Location (SHL) other than the approved SHL on the well permit, resulting in the actual SHL being approximately 80 feet from the permitted SHL. |
| 2605669 | 788456 | 2017-06-20 | 2018-01-03 | 78a12 | Administrative | The well was not drilled in accordance with the approved well permit. The actual SHL is approximately 80 feet from the permitted SHL. |
| Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
|---|---|---|---|---|---|---|---|
| 742042 | 333060 | NOV - Notice of Violation | |||||
| 742043 | 333060 | NOV - Notice of Violation | |||||
| 788455 | 354433 | NOV - Notice of Violation | 2018-01-03 | ||||
| 788456 | 354433 | NOV - Notice of Violation | 2018-01-03 |
For data sources see[8]