If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-21429 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: McNett Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 145293 | |
Farm/Lease Name: WEILER UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.590061 | |
Longitude: -76.822753 |
Date | Event |
---|---|
2014-03-06 | New Permit Application |
2014-04-17 | Performed Spud Operation |
2014-06-10 | Drilling Completion |
2014-08-25 | Perforation |
2015-02-03 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-09-07 | 2014-09-19 | 8,973 | 9,533,620 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid 10-30% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.1 | 0 |
MCS-2510T | MULTI-CHEM | Scale Inhibitor | ETHYLENE GLYCOL | 107-21-1 | 60 | 0.01 | 0 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.02 | 0 | |
MCB-8614 | MULTI-CHEM | BIOCIDE | ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE | 68424-85-1 | 5 | 0.003 | 0 | |
GLUTARALDEHYDE | 111-30-8 | 30 | 0.02 | 0 | ||||
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.9 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 184,808.54 | 16 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 2,217,203.88 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 1,089,735.51 | 348 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 816,959.09 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 677,259.21 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 452.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 480.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 12,352.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 3,068.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,255.65 Tons | LANDFILL | 301358 |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 518.14 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 24,620.61 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 2,937.68 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 914.35 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 3,051.01 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 3,521.84 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2269143 | Primary Facility | 2014-05-08 | Routine/Complete Inspection | No Violations Noted | |
2271936 | Primary Facility | 2014-05-13 | Drilling/Alteration | No Violations Noted | |
2275784 | Primary Facility | 2014-06-03 | Drilling/Alteration | No Violations Noted | |
2306284 | Primary Facility | 2014-09-18 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 9/18/2014. |
2307013 | Primary Facility | 2014-09-25 | Routine/Complete Inspection | No Violations Noted | |
2566534 | Primary Facility | 2017-02-24 | Routine/Complete Inspection | No Violations Noted | Routine Complete Inspection 2/24/2017.
I entered the site at 12:05. At the time of the inspection, the Cotton Hanlon 1H (081-21428) and the Weiler 1H (081-21429) wells were in production. The fresh water tank pad at the access road remains installed but the tank has been removed. The PCSM (Post Construction Stormwater Management) is permitted for this site has not been implemented. The roadside ditch leading to the first stilling basin (Approximately 575’ south of Barnes Hill Road) has erosion which is causing water to flow around the basin. The well pad was constructed as designed but the permitted plan has an impoundment located south of the well pad. Stormwater is handled by an infiltration berm which has not yet been implemented. The latest restoration schedule, submitted on 11/16/016, indicates Chief is planning to restore the site on 6/10/2017. Currently, the site has not been restored as per 3216(c) of the Oil and Gas Act as amended by Act 13. I recommend implementing the PCSM designed for th |
2793514 | Primary Facility | 2018-10-24 | Site Restoration | No Violations Noted | Two wells staged for production phase. Two each water separators. No leaks detected from production equipment. No violations noted. Property is owned by Cotton Hanlon Incorporated c/o Forestry Dept.
The eSubmission Post Drilling Site Restoration Report was submitted to the DEP on 10/23/2018. Based on this inspection report the Post Drilling Restoration report was accepted on 5/24/2018. |
For data sources see[8]