If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-21460 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.553264,"lon":-76.823911,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: McNett Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 151161 | |
Farm/Lease Name: WISSLER SOUTH UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-05-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.553264 | |
Longitude: -76.823911 |
Date | Event |
---|---|
2014-05-07 | New Permit Application |
2014-12-02 | Performed Spud Operation |
2015-02-19 | Drilling Completion |
2015-03-04 | Perforation |
2015-06-23 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-03-04 | 2015-03-05 | 8,418 | 958,860 | |
2 | 2017-02-06 | 2017-02-15 | 8,411 | 14,222,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | Universal | Acid | Hydrochloric Acid | 7647-01-0 | 37 | 0.07 | 0 |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.89 | 0 | |
Unislik ST 50 | Universal | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.03 | 0 | |
Gyptron T-390 | Champion Technologies | Scale Inhibitor | Methanol | 67-56-1 | 10 | 0.0002 | 0 | |
Bactron K-139 | Champion Technologies | Biocide | Ethanol | 64-17-5 | 5 | 0.002 | 0 | |
Glutaraldehyde | 111-30-8 | 5 | 0.002 | 0 | ||||
Quaternary ammonium compounds, benzyl-C-12-16 alkyldimethyl, chlorides |
68424-85-1 | 10 | 0.004 | 0 | ||||
2 | Hydrochloric Acid(15%) | Keane | Acidizing | Listed Below | ||||
Sand | Keane | Proppant | Listed Below | |||||
EC6486A | Nalco Champion | Scale Inhibitor | Listed Below | |||||
Cinnamaldehyde | 104-55-2 | 10 | 0.00004000 | 51 | ||||
N,N-Diethanololeamide | 93-83-4 | 2 | 0.00143 | 1990 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.00162 | 2244 | ||||
Formic acid | 64-18-6 | 10 | 0.00004000 | 51 | ||||
Water | 7732-18-5 | 85 | 0.02007 | 166804 | ||||
Water | 7732-18-5 | 40 | 0.00215 | 2992 | ||||
Methanol | 67-56-1 | 45 | 0.0107 | 14868 | ||||
Dipropylene glycol monomethyl ether | 34590-94-8 | 20 | 0.00007000 | 101 | ||||
Crystallilne silica | 14808-60-7 | 100 | 14.3292 | 19,907,000.0 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.00162 | 2244 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00238 | 3304 | ||||
(Mineral oil) Light hydrotreated petroleum distillate | 64742-47-8 | 20 | 0.01432 | 19895 | ||||
2- Propanol | 67-63-0 | 5 | 0.00002000 | 25 | ||||
1,2- Ethanediol | 107-21-1 | 40 | 0.00015 | 202 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.02119 | 29436 | ||||
Water | 7732-18-5 | 40 | 0.00951 | 13216 | ||||
Water | 7732-18-5 | 100 | 85.4284 | 118,683,000.0 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00143 | 1990 | ||||
Ethanaminium, N,N,N-trimethyl-2-((1-oxo-2-propenyl)oxy)-, chloride, polymer with 2-propenamide |
69418-26-4 | 30 | 0.02148 | 29843 | ||||
Alcohols, C12-15 linear, ethoxylated | 68131-39-5 | 10 | 0.00004000 | 51 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00004000 | 51 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00119 | 1652 | ||||
KAI-13 | Keane | Acid Inhibitor | Listed Below | |||||
KFR-20 | Keane | Friction Reducer | Listed Below | |||||
Water | Chief Oil & Gas | Carrier/Base Fluid | Listed Below | |||||
Bactron K-139 | Nalco Champion | Biocide | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 66,624.97 | 154 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 4,144,602.07 | 315 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 2,163,543.86 | 334 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 1,299,250.05 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 1,978.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 554.41 Tons | LANDFILL | 301358 |
2015 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 2,163.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Drill Cuttings | 899.64 Tons | LANDFILL | 301358 |
2015 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 240.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 894.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 1,153.61 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 3.86 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 25,591.82 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 360.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Soil Contaminated by Oil & Gas Related Spills | 1.71 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 5,463.85 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 15.33 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 4,441.13 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 9.89 Tons | LANDFILL | 301358 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2277762 | Primary Facility | 2014-06-06 | Preoperation Inspection | No Violations Noted | Pre-Operational Inspection with Andrea Mullen (DEP); 6/6/2014. |
2351705 | Primary Facility | 2015-03-04 | Incident- Response to Accident or Event | Violation(s) Noted | spoke with the company men (Paul Beachum and Doug Eckels) in response to a brine spill reported to the Department earlier that day. At the time of the inspection, equipment was being assembled to (toe) fracture the Wissler South Unit 1H (081-21460) The spill was located at the back (south/southwest side) of the pad behind the working tanks (off containment). An area approximately 4'X10' had snow and slushy ice that was slightly brownish/off color. Field conductivity was approximately 1480 umhos/cm over the majority of the visibly effected area and approximately 8,140 umhos/cm at the highest. After returning to the company trailer we asked the company representatives to vacuum the spill area since solid ice was visible under the slushy snow and ice. The company representatives explained that they had been vacuuming the area for some time and were planning to continue until the frac-job is over. Violations Noted to 081-21460. |
2354885 | Primary Facility | 2015-03-23 | Routine/Complete Inspection | No Violations Noted | At the time of inspection clear sky, 20 degrees F, 2” snow cover |
2367260 | Primary Facility | 2015-04-22 | Compliance Evaluation | No Violations Noted | Compliance Evaluation Inspection; 4/22/2015. |
2566537 | Primary Facility | 2017-02-24 | Routine/Complete Inspection | No Violations Noted | Routine Compete Inspection 2/24/2017.
I entered the site at 12:40. At the time of the inspection, Wissler South Unit 1H (081-21460) was in the flowback phase of operations. Oil States (subcontractor) was onsite monitoring the temporary production equipment and sand separators. Other contractors were onsite removing equipment. Containment was cut back from the full Frac Job coverage to a smaller containment around the well heads, temporary production equipment, and sand separators. Frac tanks (containing flowback) were lining the northwest and southwest sides of the well pad. water in puddles on the pad surface was between 495-1110 umhos/cm while water in containment was between 345-450 umhos/cm. The entire pad and access road surfaces were covered in 6-8 inches of mud. Mud was flowing off the access road and into the basin near the entrance to the site. PCSM has been implemented and the 2-year extension (delaying restoration) was approved on 2/24/2016. I recommend stabilizing the site and maintaining |
2676460 | Primary Facility | 2017-12-19 | Routine/Complete Inspection | No Violations Noted | Routine inspection.
At the time of the inspection, one well was in production. The annular vent is plumbed to a poly tank. The production tank is in containment and is in good condition. PCSM was previously implemented and a 2-year extension was approved on 2/24/2016. The 2-year extension expires on 2/24/2018. I recommend evaluating the well site restoration plans. No violations noted. |
2716150 | Primary Facility | 2018-04-09 | Routine/Complete Inspection | No Violations Noted | Arrived at 14:30Weather: cold. One well in production. Top gauge: 900 psi. Cellar filled with gravel. Annular vents open and plumbed to 550-gallon poly tank. No methane detected at tank mouth. No violations were observed during this inspection. |
2758853 | Primary Facility | 2018-08-01 | Routine/Complete Inspection | No Violations Noted | Weather was 73 degrees and cloudy at time of inspection. Met with Chief representative Floyd Roberts on location. Well was shut in at time of inspection due to completion work being performed on the other 2 wells on the pad. Well had a 0-5k psi pressure gauge attached above the swab valve that read approximately 1200 psi at time of inspection. There were 2 annulus vents plumbed to surface that were both closed in at time of inspection. 0% combustible gas was detected in any area around the well at time of inspection. No violations noted at time of inspection. |
2784233 | Primary Facility | 2018-10-03 | Routine/Complete Inspection | No Violations Noted | Site was in flowback phase when I arrived; 2 temporary separators and heaters were hooked up to the wells. The site had a large number of puddles, both on and off containment. These all showed low conductance (.18-.33 mS/ cm). Water had also built up under the liner, creating small spots where the liner was pushed up by the water. Berms had been removed from the sitewide containment, but no equipment remained on that liner. The containments for the Baker tank batteries on site appeared to be in good condition; however, on the outside of the berms for these containments, the liner was stretched such that it was not making contact with the ground for 1-3', increasing the possibility of a tear. The site has an existing pipeline, and the wells will be put directly to sales after flowback is complete. |
2793146 | Primary Facility | 2018-10-23 | Routine/Complete Inspection | No Violations Noted | Three wells in flowback. Site remains in flowback with production going to pipeline for sale. Mobile GPUs and sand separators situated near well heads. All separators within temporary containment. Many (20+) baker tanks within containment. No leaks. No conductivity above 300 uS/cm inside containments. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2351705 | 717732 | 03/04/2015 | 2015-03-04 | CSL 402(b) - POTENTIAL POLLUTION - Conducting an activity regulated by a permit issued pursuant to Section 402 of The Clean Streams Law to prevent the potential of pollution to waters of the Commonwealth without a permit or contrary to a permit issue | Environmental Health & Safety | spoke with the company men (Paul Beachum and Doug Eckels) in response to a brine spill reported to the Department earlier that day. At the time of the inspection, equipment was being assembled to (toe) fracture the Wissler South Unit 1H (081-21460) The spill was located at the back (south/southwest |
2351705 | 717733 | 03/04/2015 | 2015-03-04 | 78.54 - GENERAL REQUIREMENTS - Operator failed to control and dispose of fluids, residual waste and drill cuttings, including tophole water, brines, drilling fluids, drilling muds, stimulation fluids, well servicing fluids, oil, and production fluids | Environmental Health & Safety | spoke with the company men (Paul Beachum and Doug Eckels) in response to a brine spill reported to the Department earlier that day. At the time of the inspection, equipment was being assembled to (toe) fracture the Wissler South Unit 1H (081-21460) The spill was located at the back (south/southwest |
2351705 | 717734 | 03/04/2015 | 2015-03-04 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | spoke with the company men (Paul Beachum and Doug Eckels) in response to a brine spill reported to the Department earlier that day. At the time of the inspection, equipment was being assembled to (toe) fracture the Wissler South Unit 1H (081-21460) The spill was located at the back (south/southwest |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
717732 | 320960 | NOV - Notice of Violation | Comply/Closed | 2015-04-22 | |||
717733 | 320960 | NOV - Notice of Violation | Comply/Closed | 2015-04-22 | |||
717734 | 320960 | NOV - Notice of Violation | Comply/Closed | 2015-04-22 |
For data sources see[8]