X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21606

Well Details

Well ID: 37-081-21606
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Hepburn Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 152938
Farm/Lease Name: WALTERS GAMBLE 42H 51714
License Status:
Spud Date:
Permit Date: 2015-10-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.330369
Longitude: -77.032339

For data sources see[1][2][3]

Well History

Date Event
2015-10-06 New Permit Application
2016-09-23 Permit Renewal Application
2016-09-26 New Permit Application
2017-10-05 MOD
2017-10-06 Performed Spud Operation
2018-04-02 MOD

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-16 2018-07-16 8,110 8,466,060 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched
127087-87-0 5 0.00003897 31
Oxyalkylated phenolic resin Proprietary 30 0.000311744 248
Hydrochloric acid 7647-01-0 60 0.304913 241572
Ethoxylated alcohols Proprietary 30 0.000115041 92
Fatty acids, tall oil Proprietary 30 0.000115041 92
Hydrotreated light petroleum distillate 64742-47-8 30 0.0207922 16473
Propargyl alcohol 107-19-7 10 0.00003835 31
1,2,4 Trimethylbenzene 95-63-6 1 0.00000779 7
Olefins Proprietary 5 0.00004602 40
Phosphoric acid 7664-38-2 0.1 0.00002090 17
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000233808 186
Crystalline silica, quartz 14808-60-7 100 10.3642 8,211,180.0
Phosphate of a Diamine, Sodium Salt Proprietary 30 0.00660385 5232
Methanol 67-56-1 60 0.0068632 5439
Glutaraldehyde 111-30-8 30 0.00627117 4969
Ethanol 64-17-5 60 0.000676655 537
Ammonium chloride 12125-02-9 5 0.00346537 2746
Citric acid 77-92-9 60 0.000641497 509
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00346537 2746
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides
68424-85-1 5 0.0010452 829
Naphthalene 91-20-3 5 0.00003897 31
Modified thiourea polymer Proprietary 30 0.000115041 92
9-Octadecenamide, n,n-bis 2(hydroxy)-ethyl)-(Z) 93-83-4 5 0.00346537 2746
Sodium chloride 7647-14-5 30 0.0207922 16473
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
LD-2850 Multi-Chem Friction Reducer Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 89.0132 70,522,100.0
SAND-COMMON WHITE - 100 MESH Halliburton Proppant Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.539388 427339
SAND-PREMIUM WHITE-40/70 Halliburton Proppant Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
SCALECHEK LP-50 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 1,225,546.27 145 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 2,206,346.64 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 1,560.00 Bbl REUSE (AT WELL PAD)
2017 SENECA RESOURCES CO LLC Synthetic Liner Materials 0.71 Tons LANDFILL 301358
2017 SENECA RESOURCES CO LLC Drill Cuttings 39.83 Tons LANDFILL 301358
2018 SENECA RESOURCES CO LLC Produced Fluid 160.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2018 SENECA RESOURCES CO LLC Produced Fluid 16,170.00 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Synthetic Liner Materials 23.06 Tons LANDFILL 301358
2018 SENECA RESOURCES CO LLC Produced Fluid 138.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 SENECA RESOURCES CO LLC Produced Fluid 6,180.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 3,117.50 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Drill Cuttings 1,632.43 Tons LANDFILL 301358
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Produced Fluid 550.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 225.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 13.42 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 1,240.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 1,790.00 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Produced Fluid 60.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 SENECA RESOURCES CO LLC Produced Fluid 650.00 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 3.20 Tons LANDFILL 301358
2019 SENECA RESOURCES CO LLC Produced Fluid 257.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2511036 Primary Facility 2016-08-09 Routine/Complete Inspection No Violations Noted I entered the site off Spook Hollow Road at 10:56. The RCE (Rock Construction Entrance) has been installed and the perimeter E&S controls have been installed. At the time of the inspection, the contractor was scraping topsoil off the well pad area and stockpiling it on the southeast corner of the location as specified in the plans. No E&S issues were noted during the inspection and the area downslope of the earth disturbance is well vegetated, further reducing the potential for accelerated erosion. Spook Hollow and Rose Valley Roads were both upgraded prior to commencing earth disturbance on the well site. No Violations Noted.
2520322 Primary Facility 2016-09-14 Preoperation Inspection No Violations Noted I entered the site off Spook Hollow Road at 08:10. At the time of the inspection, the well pad’s limestone surface course was being installed and topsoil was being re-applied to graded slopes. The major earthmoving for the site is complete and most of the previously disturbed soils have been tracked-in and hydro-seeded. The infiltration trench has also been installed on the fill side of the pad as designed. Overall, the site is nearly complete. E&S controls remain installed and appear to be functioning properly. This inspection fulfills the Pre-Operational Inspection requirement of the O&G Act as amended by Act 13. No violations noted.
2550874 Primary Facility 2017-01-03 Routine/Complete Inspection No Violations Noted Routine Inspection; 1/3/2017. I entered the site off Spook Hollow Road at 09:54. At the time of the inspection, the well pad was completed and two well cellars were installed. Since the last inspection, a flash-flooding event on 10/20-21/2016 caused some damage but repairs were accomplished immediately afterward. Due to saturated conditions, relatively young vegetation, and freeze/thaw the site has been experiencing erosion since the growing season has ended. Currently, several layers of E&S controls have been installed and it appears the E&S issues have been confined to the LOD. Sediment is, however, accumulated along the uppermost E&S controls and significant erosion exists along the western edge of the well pad. I recommend evaluating ways to further minimize erosion until conditions become more favorable for a permanent solution. No Violations Noted.
2570508 Primary Facility 2017-03-10 Routine/Complete Inspection No Violations Noted Routine Inspection; 3/9/2017.

I entered the site off Spook Hollow Road and met with Kirk Gregory (Seneca) at 12:05. We met to discuss the ongoing erosion along the west and southwest side of the pad which began during an extreme rainfall event in the fall of 2016. The erosion has continued to get worse but has not impacted areas outside the LOD because several layers of silt sock have been added downslope of the pad. Seneca plans to armor the channel that is eroding (photos) and implement the PCSM plan when conditions improve. We also discussed routing some of the water from the upslope diversion in a different direction. Since the Department already has a major modification for the ESCGP, I suggested talking to Daniel Harvey (DEP) for any additional changes. We discussed how this one drainage pathway caries water from a majority of the well pad. It appears that this concentrated flow is responsible for scouring the west/southwest side of the well pad. In addition, groundwater appears to be seeping o

2591333 Primary Facility 2017-05-05 Routine/Partial Inspection No Violations Noted Routine Inspection; 5/5/2017. I entered the site at 11:20 to monitor the effectiveness of the E&S controls installed around the perimeter of the site. Erosion caused by significant rainfall in the fall of 2016 has been an ongoing concern on this site. Since the last inspection, the contractor has started to install rock armor along the ditch conveying water from the cut slope diversion. Erosion was visible but perimeter E&S controls were able to settle the sediment from the water before it left the site. Please continue to maintain controls as needed. No Violations Noted.
2606276 Primary Facility 2017-06-15 Routine/Partial Inspection No Violations Noted Routine Inspection; 6/15/2017. I entered the site at 13:19 to inspect installation of the PCSM features and the upgrade of the drainage system. Perimeter E&S controls are maintained and appear to be effective. Vegetation on the site outside the recent earth disturbance is well established and looks good. The bio-retention berm is being constructed but in not complete. Please be mindful of compaction in the bio-retention berm as compaction is evident. The production lines from the well cellars to the proposed location of the production equipment are installed and the pad surface has been re-graded around the well cellars for containment. Overall, the site is in good condition. I recommend seeding and stabilizing the dike/berm portion of the bio-retention berm when that part is complete. No Violations Noted.
2660075 Primary Facility 2017-11-14 Routine/Complete Inspection No Violations Noted Arrived at 1:40. Weather: cloudy. Inspected conductor. There were no personnel on site. There werte no violations observed.
2719303 Primary Facility 2018-04-16 Routine/Complete Inspection No Violations Noted Routine inspection; 4/16/2018.

At the time of the inspection, it was raining and equipment was being moved onsite in anticipation of the upcoming rig move. Pipeline is under construction upslope of the well site.

Sediment entering the basin is coming from the adjacent pipeline and not this site. The pipeline operator is doing a good job of using water bars to limit the area of concentrated flow entering the stormwater system on the well site. The basin is currently functioning effectively at preventing sediment from leaving the site. No violations noted.

2724811 Primary Facility 2018-05-01 Routine/Complete Inspection No Violations Noted Weather was 45 degrees F. and sunny at time of inspection. The surface casing was set on 4/24/18 and the intermediate casing was set on 4/28/18. Met with Seneca representative Kevin Bradford. Rig was in the process of drilling the 8 3/4" hole for the production casing. Reviewed the cement job logs for the surface and intermediate casing and no discrepancies were noted at time of inspection. Conducted a brief walk around inspection of location. No violations noted at time of inspection.
2726831 Primary Facility 2018-05-07 Routine/Complete Inspection No Violations Noted Weather was 52° and cloudy at time of inspection. Met with Seneca representative Kevin Bradford. Rig was in the process of drilling the 8 3/4'hole for the production casing. Kick off point was 7833'. Rig is estimated to TD the well on Thursday at 15400'. They are estimating to cement the production casing on Friday. Conducted a brief walk around inspection of location. No violations noted at time of inspection.
2731298 Primary Facility 2018-05-18 Routine/Complete Inspection No Violations Noted Weather was 60° and sunny at time of inspection. Met with Seneca representative Gus Trejo. Rig was in the process of cementing the production casing. Plug was bumped when I arrived on location. Reviewed the cement job with Gus following checking the floats. No discrepancies were noted at time of inspection. Rig will wait 8 hours on cement and then skid to the 44H. Rig is estimating to spud on the surface casing hole for the 44H on the morning of the 19th. Conducted a brief walk around inspection of location. No violations noted at time of inspection.
2738423 Primary Facility 2018-05-30 Routine/Complete Inspection No Violations Noted Weather was 75° and cloudy at time of inspection. Met with Seneca representative Kevin Bradford on location. Well was covered with a rig mat at time of inspection. Metered the area around the well cellar and 0% combustible gas was detected at time of inspection. No violations were noted at time of inspection.
2765755 Primary Facility 2018-08-21 Routine/Complete Inspection No Violations Noted Weather was 66° and raining at time of inspection. There were no Seneca resources representative on location at time of inspection. Wells have recently been stimulated and are in production. Well had digital pressure monitoring equipment attached to the tubing and to the production casing. Tubing pressure was 2675 and casing pressure was 3675 at time of inspection. Due to the inclement weather I did not test the annulus vents with Altair 5x gas meter. Will follow up for gas metering in the next couple days. No violations noted at time of inspection.
2766007 Primary Facility 2018-08-22 Routine/Complete Inspection No Violations Noted Weather was 71° and sunny at time of inspection. There were no Seneca resources representatives on location at time of inspection. Wells have recently been stimulated and are in production. Well had digital pressure monitoring equipment attached to the tubing and to the production casing. Tubing pressure was 2490 and casing pressure was 3400 at time of inspection. Well had 3 annulus vents plumbed to surface at time of inspection. There was 0% combustible gas detected on any of the annulus vents at time of inspection. No violations noted at time of inspection.
2819780 Primary Facility 2018-12-27 Routine/Complete Inspection No Violations Noted Flow back operations underway on well site. Two wells on location. Containment and rig matting in place. A flowback baker storage tank is on containment. Two GPUs within 10 inch containment.

For data sources see[8]

References