If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-21680 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.319981,"lon":-76.76155,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Mill Creek Township | |
Operator Name: INFLECTION ENERGY (PA) LLC | |
Well Pad ID: 154322 | |
Farm/Lease Name: CONVERSE 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2017-05-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.319981 | |
Longitude: -76.761550 |
Date | Event |
---|---|
2017-05-31 | New Permit Application |
2018-03-22 | MOD |
2018-10-22 | Permit Renewal Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2629840 | Primary Facility | 2017-08-24 | Routine/Complete Inspection | No Violations Noted | I entered the site for an inspection during construction and talked to Jason DuPont. The majority of the earthmoving onsite has been completed and top-rock was being applied to the pad surface and the access road. Recent rain events have concentrated some sediment in the low spots and in the bottom of the infiltration basin. Work continues on adding topsoil and seeding and stabilizing the site. No violations noted. |
2635740 | Primary Facility | 2017-09-12 | Preoperation Inspection | No Violations Noted | The well site construction has been completed and all previously disturbed soils have been seeded and stabilized. Perimeter E & S controls are installed and functioning properly. Conveyance channels leading from throughout the project to the infiltration basin have been stabilized with permanent matting. This inspection fulfills the
Pre-Operational Inspection requirement of the Oil & Gas Act as amended by Act 13. No violations noted. |
2779835 | Primary Facility | 2018-09-26 | Routine/Complete Inspection | No Violations Noted | No wells drilled on pad. Site stable. The well permits for this location expire in March 2019. No violations noted. |
For data sources see[5]