Well ID: 37-081-21682 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.367464,"lon":-76.994225,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Gamble Township | |
Operator Name: SENECA RESOURCES CO LLC | |
Well Pad ID: 153513 | |
Farm/Lease Name: EASTON 103H 52657 | |
License Status: Plugged and Abandoned | |
Spud Date: 2017-06-01 | |
Permit Date: 2017-05-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.367464 | |
Longitude: -76.994225 |
Date | Event |
---|---|
Deviated | |
2017-05-24 | New Permit Application |
2017-06-20 | Performed Spud Operation |
2017-07-13 | MOD |
2017-08-06 | Drilling Completion |
2019-04-18 | Fully Plugged |
2019-04-18 | Newly Drilled |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-10-05 | 2017-10-26 | 8,935 | 11,587,600 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KAI-12 | Keane | Acid Inhibitor | prop-2-yn-1-0l | 107-19-7 | 5 | 0.00004857 | 54.036 |
methanol | 67-56-1 | 90 | 0.000874326 | 972.647 | ||||
alcohols, c7-9-0so, c8-rich | 68526-83-0 | 5 | 0.00004857 | 54.036 | ||||
xylne | 1330-20-7 | 5 | 0.00004857 | 54.036 | ||||
ethylbenzene | 100-41-4 | 1 | 0.00000971 | 10.807 | ||||
fatty imidazoline | 61790-69-0 | 5 | 0.00004857 | 54.036 | ||||
propan-2-ol | 67-63-0 | 5 | 0.00004857 | 54.036 | ||||
KFEAC-30 | Keane | Iron Control | Acetic acid | 64-19-7 | 60 | 0.000491994 | 547.32 | |
Citric acid | 77-92-9 | 40 | 0.000327996 | 364.88 | ||||
Water (Clean - Acid - Chems) | Seneca Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.7676 | 96,525,000.0 | |
KFR-20 | Keane | Friction Reducer | Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 20 | 0.0192023 | 21361.7 | |
Ammonium Chloride | 12125-02-9 | 1 | 0.000960115 | 1068.08 | ||||
Water | 7732-18-5 | 45 | 0.0432052 | 48063.7 | ||||
oleic acid diethanolamide | 93-83-4 | 2 | 0.00192023 | 2136.17 | ||||
cololymer of 2-propenamide | 69418-26-4 | 30 | 0.0288034 | 32042.5 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00192023 | 2136.17 | ||||
MBC-516 | Keane | Biocide | ethanol | 64-17-5 | 2.8 | 0.000261342 | 290.731 | |
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000495617 | 551.351 | ||||
gluteral | 111-30-8 | 26.7 | 0.00249209 | 2772.33 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 8 | 0.000743893 | 827.546 | ||||
KSI-19 NW | Keane | Scale Inhibitor | Aqueous Solution | Proprietary | 100 | 0.0139729 | 15544.2 | |
DustProof (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 99.9 | 12.7198 | 14,150,200.0 | |
Blend | Proprietary | 0.1 | 0.0127325 | 14164.4 | ||||
7.5% Acid | Keane | Acidizing | Water | 7732-18-5 | 92.5 | 0.350315 | 389709 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0284039 | 31598 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | SENECA RESOURCES CO LLC | 469.94 | 2 | 0.00 | 0 | 0.00 | 0 |
2018 | SENECA RESOURCES CO LLC | 2,758,977.23 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | SENECA RESOURCES CO LLC | 1,432,286.50 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 170.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | SENECA RESOURCES CO LLC | Produced Fluid | 1,480.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | SENECA RESOURCES CO LLC | Produced Fluid | 107.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | SENECA RESOURCES CO LLC | Produced Fluid | 171.43 Bbl | REUSE (AT WELL PAD) | |
2017 | SENECA RESOURCES CO LLC | Drill Cuttings | 1,658.80 Tons | LANDFILL | 301358 |
2017 | SENECA RESOURCES CO LLC | Waste Water Treatment Sludge | 45.71 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | SENECA RESOURCES CO LLC | Waste Water Treatment Sludge | 128.43 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 3,629.04 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 24,003.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 39.28 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Drill Cuttings | 1.50 Tons | LANDFILL | 301358 |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 130.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | SENECA RESOURCES CO LLC | Synthetic Liner Materials | 7.98 Tons | LANDFILL | 301358 |
2018 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 82.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 18.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 832.84 Bbl | REUSE (AT WELL PAD) | |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 74.29 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC038 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 1,063.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 102.85 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | SENECA RESOURCES CO LLC | Synthetic Liner Materials | 2.22 Tons | LANDFILL | 301358 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 18.57 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 2,355.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 310.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC003 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2601603 | Primary Facility | 2017-06-01 | Drilling/Alteration | No Violations Noted | Weather: Sunny. Arrived @ 08:00. Patterson 339 on location, 9-5/8” cement job recently completed. At the time of my inspection, crew were nippling up BOPs. Met with company man Danny Berrera and drilling and construction foreman Scott Barr who was onsite to supervise spudding of up to 3 conductors for the Easton 102H, 103H, and101H. Also onsite was an Express Energy Services auger rig. Plan was to set these conductors deeper (formerly 77’, increased to 120’-150’) because the 31H had lost circulation high up in the hole (90-100’ from surface). For 31H, had pumped extra cement in this shallow section before proceeding further. Left location @ 09:00. |
2605177 | Primary Facility | 2017-06-08 | Drilling/Alteration | No Violations Noted | Weather: Sunny. Arrived @ 08:00. Patterson 339 on location, drilling at 15060’, TD will be 16,000. Met with company man Danny Berrera, drilling going well. Also looked at the plugged conductor, Easton 103H 52657, the plugged conductor, no issues were noted. Left location @ 9:15. |
2606269 | Primary Facility | 2017-06-15 | Routine/Complete Inspection | No Violations Noted | Routine complete inspection; 6/15/1017. The Patterson rig 339 was on the Easton 30H (081-21634) running 9 5/8" intermediate casing in the hole. I walked the site with Justin Greene (company man). The containment looked excellent, clean, and well maintained. Cuttings management looks clean and well kept. Chemical storage was all on containment and clearly separated. Overall, the site looks very good. No violations noted. |
2610546 | Primary Facility | 2017-07-05 | Administrative/File Review | No Violations Noted | July 5th 2017: Received, signed, and sent to file the Well Record, Notice of Intent to Plug, and Plugging Certificate pertaining to a plug and skid event from this conductor, permit #081-21682-00-00 |
2618847 | Primary Facility | 2017-07-19 | Drilling/Alteration | No Violations Noted | Weather: Sunny, hot. Arrived @ 7:45. Met with company man Justin Green. Patterson 339 on location, drilling at 7230’, just starting curve, drilling going well. TD estimated to be approximately 16,000’. Checked IC integrity test: held 2500 psi for 30 min. There were no violations identified during this inspection. Left @ 09:15. |
2623874 | Primary Facility | 2017-07-26 | Drilling/Alteration | No Violations Noted | Weather: Cloudy. Arrived @ 13:45. Met with company man Danny Barrera. Inspection followed notification that Seneca would conduct an open hole sidetrack to bypass an area of high dogleg severity following loss and retrieval of the BHA near the end of the curve. Patterson 339 was time drilling at the time of my inspection. There were no violations identified during this inspection. Left @ 15:06. |
2623953 | Primary Facility | 2017-07-28 | Drilling/Alteration | No Violations Noted | Weather: Cloudy. Arrived @ 9:10. Met with company man Danny Barrera. Patterson 339 on location. The open sidetrack failed, so Seneca had just set a 940’ cement plug from the hole bottom at 9689’ to 8749’. At the time of my inspection the crew was waiting on cement for 18 hours and meanwhile making up the BHA. Observed BHA make-up and left location @ 11:04. There were no violations identified during this inspection. |
2645933 | Primary Facility | 2017-10-11 | Drilling/Alteration | No Violations Noted | Arrived at 11:00. Weather: warm, rain. Met with company man Anthony Murphy. Keane Frac onsite fraccing the 102H and 103H wells. At the time of my inspection, stage 6 on the 103H, had been perf'ed, gun was stuck at 14,477. Left at 12:20. No violations were noted during this inspection. |
2650624 | Primary Facility | 2017-10-16 | Routine/Complete Inspection | No Violations Noted | I entered the site and met with Anthony Murphy (Company Man). At the time of the inspection, the wireline was running in the Easton 102H (081-21684) on the 13th stage while the 12th stage was under pressure on the Easton 103H(081-21682). Field conductivity in puddles adjacent to the produced water storage containment was between 267-588 umhos/cm. Field conductivity in containment at the southeastern corner of containment was 356 umhos/cm. Dust was visible coming from the sand handling equipment. After looking into the sand concern, the filters were being cleaned before I left the site. The site was in excellent condition and as usual, the containment is graded toward the cellars and covered with rig mats. No violations noted. |
2650634 | Primary Facility | 2017-10-20 | Drilling/Alteration | No Violations Noted | Arrived at 14:40. Met with Anthony Murphy, company man, and Mike Cauley, frac engineer. At the time of my inspection, they were preparing to frac stage 18 on the 102H and 103H. They were also then going to frac stage 3 on the 29H. No violations were obaerved at the time of my inspection. |
2654839 | Primary Facility | 2017-10-27 | Routine/Complete Inspection | No Violations Noted | I met Justin Weaver when I arrived on-site. Frac was idle, and Justin informed me that they are only fracing at night. Individual secondary containments were in good condition, and rig mats on sitewide containment were clean and dry. Water trucks were offloading to the reused water tanks. Justin estimated that the frac would continue through the end of November. |
2672651 | Primary Facility | 2017-12-19 | Drilling/Alteration | No Violations Noted | Arrived at 11:50. Weather sunny, windy, temps in 40s. M35 with Anthony Murphy, company man Seneca. Currently drilling out plugs. Running 2 snubbing rigs (Hydraulic Pressure Control). At the time of my inspection, had just finished a well, changed out the bag, and were moving to the final well. No violations observed at the time of my inspection. |
2676389 | Primary Facility | 2017-12-19 | Site Restoration | No Violations Noted | The operator submitted a Post Drilling Well Site Restoration Report on 11/10/2017. Post Construction Stormwater Management (PCSM) plans have been implemented but vegetation is not sufficient to be considered permanently stabilized. Pipeline construction operations were ongoing at the time of the inspection.
After entering the site, I met with Anthony Murphy and we walked the site. One snubbing unit/workover rig was on the Easton 29H (081-21633) while the second was on the 101H (081-21683). The site was very clean and housekeeping was excellent. Individual containments were well placed and effective. Production equipment and flow lines were being installed as the site transitions toward flow-back/production. Overall, the site is in excellent condition but does not meet the requirements to be considered restored. No violations noted. |
2682044 | Primary Facility | 2018-01-11 | Drilling/Alteration | No Violations Noted | Arrived at 11:00. Met with Lee Kennemoth, completions foreman. Flow back operations are nearing a conclusion with 6 of the 7 wells on the pad are flowing gas to pipeline. Flow back ops anticipate another few days before turning site over to production. For the 101H, plugs still need to be drilled out. |
2715434 | Primary Facility | 2018-04-04 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 4/4/2018.
I met Aaron Hoffman (company man),and walked the site. At the time of the inspection, the wells were on temporary sand separation and produced water was being transferred from the production tanks to a battery of frac-tanks. Water on the well pad surface had field conductivity between 350-545 umhos/cm. Field conductivity at the south end of the frac-tank battery containment was 5,350 umhos/cm. I recommended (to Mr. Hoffman) that the frac-tank battery containment be vacuumed as soon as it is practical. The vac-truck was removing water from the well cellars and surrounding containment during the inspection. Water was ponded near the entrance to the site west of SugarCamp Road. I recommend evaluating the drainage in this existing swale between the two houses. No violations noted. |
2746597 | Primary Facility | 2018-06-27 | Site Restoration | No Violations Noted | Well Site Restoration Report Inspection; 6/27/2018.
At the time of the inspection the wells were in production and produced water was being stored in frac tanks on containment (a pump was installed and was actively pumping from the permanent production tanks to the frac tanks. HRI was onsite removing a temporary HDPE water line which had previously been buried in the pad. I recommend restoring the site in accordance with the ESCGP or requesting a 2-year extension. I recommend denying the Well Site Restoration Report. No violations noted. |
2819093 | Primary Facility | 2018-12-26 | Routine/Complete Inspection | No Violations Noted | Seven wells staged for production. Seven GPUs within 10 inch containment. No leaks detected from production equipment.
Service rig on location to run additional production pipe. Containment and rig matting in place. All baker tanks within containment. No violations noted. |
2819095 | Primary Facility | 2018-12-26 | Routine/Complete Inspection | No Violations Noted | Seven wells staged for production. Seven GPUs within 10 inch containment. No leaks detected from production equipment.
Service rig on location to run additional production pipe. Containment and rig matting in place. All baker tanks within containment. No violations noted. |