X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21682

Well Details

Well ID: 37-081-21682
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Gamble Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 153513
Farm/Lease Name: EASTON 103H 52657
License Status: Plugged and Abandoned
Spud Date: 2017-06-01
Permit Date: 2017-05-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.367464
Longitude: -76.994225

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-05-24 New Permit Application
2017-06-20 Performed Spud Operation
2017-07-13 MOD
2017-08-06 Drilling Completion
2019-04-18 Fully Plugged
2019-04-18 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-05 2017-10-26 8,935 11,587,600 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KAI-12 Keane Acid Inhibitor prop-2-yn-1-0l 107-19-7 5 0.00004857 54.036
methanol 67-56-1 90 0.000874326 972.647
alcohols, c7-9-0so, c8-rich 68526-83-0 5 0.00004857 54.036
xylne 1330-20-7 5 0.00004857 54.036
ethylbenzene 100-41-4 1 0.00000971 10.807
fatty imidazoline 61790-69-0 5 0.00004857 54.036
propan-2-ol 67-63-0 5 0.00004857 54.036
KFEAC-30 Keane Iron Control Acetic acid 64-19-7 60 0.000491994 547.32
Citric acid 77-92-9 40 0.000327996 364.88
Water (Clean - Acid - Chems) Seneca Resources Carrier/Base Fluid Water 7732-18-5 100 86.7676 96,525,000.0
KFR-20 Keane Friction Reducer Mineral oil/ light hydrotreated pet. distillate 64742-47-8 20 0.0192023 21361.7
Ammonium Chloride 12125-02-9 1 0.000960115 1068.08
Water 7732-18-5 45 0.0432052 48063.7
oleic acid diethanolamide 93-83-4 2 0.00192023 2136.17
cololymer of 2-propenamide 69418-26-4 30 0.0288034 32042.5
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00192023 2136.17
MBC-516 Keane Biocide ethanol 64-17-5 2.8 0.000261342 290.731
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000495617 551.351
gluteral 111-30-8 26.7 0.00249209 2772.33
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.000743893 827.546
KSI-19 NW Keane Scale Inhibitor Aqueous Solution Proprietary 100 0.0139729 15544.2
DustProof (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 99.9 12.7198 14,150,200.0
Blend Proprietary 0.1 0.0127325 14164.4
7.5% Acid Keane Acidizing Water 7732-18-5 92.5 0.350315 389709
Hydrochloric Acid 7647-01-0 7.5 0.0284039 31598

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SENECA RESOURCES CO LLC 469.94 2 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 2,758,977.23 365 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 1,432,286.50 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 170.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 1,480.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 107.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 SENECA RESOURCES CO LLC Produced Fluid 171.43 Bbl REUSE (AT WELL PAD)
2017 SENECA RESOURCES CO LLC Drill Cuttings 1,658.80 Tons LANDFILL 301358
2017 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 45.71 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 128.43 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 SENECA RESOURCES CO LLC Produced Fluid 3,629.04 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 24,003.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 39.28 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Drill Cuttings 1.50 Tons LANDFILL 301358
2018 SENECA RESOURCES CO LLC Produced Fluid 130.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Synthetic Liner Materials 7.98 Tons LANDFILL 301358
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 82.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 18.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 832.84 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Produced Fluid 74.29 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 SENECA RESOURCES CO LLC Produced Fluid 1,063.00 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 SENECA RESOURCES CO LLC Produced Fluid 102.85 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 2.22 Tons LANDFILL 301358
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 18.57 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 SENECA RESOURCES CO LLC Produced Fluid 2,355.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 310.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2601603 Primary Facility 2017-06-01 Drilling/Alteration No Violations Noted Weather: Sunny. Arrived @ 08:00. Patterson 339 on location, 9-5/8” cement job recently completed. At the time of my inspection, crew were nippling up BOPs. Met with company man Danny Berrera and drilling and construction foreman Scott Barr who was onsite to supervise spudding of up to 3 conductors for the Easton 102H, 103H, and101H. Also onsite was an Express Energy Services auger rig. Plan was to set these conductors deeper (formerly 77’, increased to 120’-150’) because the 31H had lost circulation high up in the hole (90-100’ from surface). For 31H, had pumped extra cement in this shallow section before proceeding further. Left location @ 09:00.
2605177 Primary Facility 2017-06-08 Drilling/Alteration No Violations Noted Weather: Sunny. Arrived @ 08:00. Patterson 339 on location, drilling at 15060’, TD will be 16,000. Met with company man Danny Berrera, drilling going well. Also looked at the plugged conductor, Easton 103H 52657, the plugged conductor, no issues were noted. Left location @ 9:15.
2606269 Primary Facility 2017-06-15 Routine/Complete Inspection No Violations Noted Routine complete inspection; 6/15/1017. The Patterson rig 339 was on the Easton 30H (081-21634) running 9 5/8" intermediate casing in the hole. I walked the site with Justin Greene (company man). The containment looked excellent, clean, and well maintained. Cuttings management looks clean and well kept. Chemical storage was all on containment and clearly separated. Overall, the site looks very good. No violations noted.
2610546 Primary Facility 2017-07-05 Administrative/File Review No Violations Noted July 5th 2017: Received, signed, and sent to file the Well Record, Notice of Intent to Plug, and Plugging Certificate pertaining to a plug and skid event from this conductor, permit #081-21682-00-00
2618847 Primary Facility 2017-07-19 Drilling/Alteration No Violations Noted Weather: Sunny, hot. Arrived @ 7:45. Met with company man Justin Green. Patterson 339 on location, drilling at 7230’, just starting curve, drilling going well. TD estimated to be approximately 16,000’. Checked IC integrity test: held 2500 psi for 30 min. There were no violations identified during this inspection. Left @ 09:15.
2623874 Primary Facility 2017-07-26 Drilling/Alteration No Violations Noted Weather: Cloudy. Arrived @ 13:45. Met with company man Danny Barrera. Inspection followed notification that Seneca would conduct an open hole sidetrack to bypass an area of high dogleg severity following loss and retrieval of the BHA near the end of the curve. Patterson 339 was time drilling at the time of my inspection. There were no violations identified during this inspection. Left @ 15:06.
2623953 Primary Facility 2017-07-28 Drilling/Alteration No Violations Noted Weather: Cloudy. Arrived @ 9:10. Met with company man Danny Barrera. Patterson 339 on location. The open sidetrack failed, so Seneca had just set a 940’ cement plug from the hole bottom at 9689’ to 8749’. At the time of my inspection the crew was waiting on cement for 18 hours and meanwhile making up the BHA. Observed BHA make-up and left location @ 11:04. There were no violations identified during this inspection.
2645933 Primary Facility 2017-10-11 Drilling/Alteration No Violations Noted Arrived at 11:00. Weather: warm, rain. Met with company man Anthony Murphy. Keane Frac onsite fraccing the 102H and 103H wells. At the time of my inspection, stage 6 on the 103H, had been perf'ed, gun was stuck at 14,477. Left at 12:20. No violations were noted during this inspection.
2650624 Primary Facility 2017-10-16 Routine/Complete Inspection No Violations Noted I entered the site and met with Anthony Murphy (Company Man). At the time of the inspection, the wireline was running in the Easton 102H (081-21684) on the 13th stage while the 12th stage was under pressure on the Easton 103H(081-21682). Field conductivity in puddles adjacent to the produced water storage containment was between 267-588 umhos/cm. Field conductivity in containment at the southeastern corner of containment was 356 umhos/cm. Dust was visible coming from the sand handling equipment. After looking into the sand concern, the filters were being cleaned before I left the site. The site was in excellent condition and as usual, the containment is graded toward the cellars and covered with rig mats. No violations noted.
2650634 Primary Facility 2017-10-20 Drilling/Alteration No Violations Noted Arrived at 14:40. Met with Anthony Murphy, company man, and Mike Cauley, frac engineer. At the time of my inspection, they were preparing to frac stage 18 on the 102H and 103H. They were also then going to frac stage 3 on the 29H. No violations were obaerved at the time of my inspection.
2654839 Primary Facility 2017-10-27 Routine/Complete Inspection No Violations Noted I met Justin Weaver when I arrived on-site. Frac was idle, and Justin informed me that they are only fracing at night. Individual secondary containments were in good condition, and rig mats on sitewide containment were clean and dry. Water trucks were offloading to the reused water tanks. Justin estimated that the frac would continue through the end of November.
2672651 Primary Facility 2017-12-19 Drilling/Alteration No Violations Noted Arrived at 11:50. Weather sunny, windy, temps in 40s. M35 with Anthony Murphy, company man Seneca. Currently drilling out plugs. Running 2 snubbing rigs (Hydraulic Pressure Control). At the time of my inspection, had just finished a well, changed out the bag, and were moving to the final well. No violations observed at the time of my inspection.
2676389 Primary Facility 2017-12-19 Site Restoration No Violations Noted The operator submitted a Post Drilling Well Site Restoration Report on 11/10/2017. Post Construction Stormwater Management (PCSM) plans have been implemented but vegetation is not sufficient to be considered permanently stabilized. Pipeline construction operations were ongoing at the time of the inspection.

After entering the site, I met with Anthony Murphy and we walked the site. One snubbing unit/workover rig was on the Easton 29H (081-21633) while the second was on the 101H (081-21683). The site was very clean and housekeeping was excellent. Individual containments were well placed and effective. Production equipment and flow lines were being installed as the site transitions toward flow-back/production. Overall, the site is in excellent condition but does not meet the requirements to be considered restored. No violations noted.

2682044 Primary Facility 2018-01-11 Drilling/Alteration No Violations Noted Arrived at 11:00. Met with Lee Kennemoth, completions foreman. Flow back operations are nearing a conclusion with 6 of the 7 wells on the pad are flowing gas to pipeline. Flow back ops anticipate another few days before turning site over to production. For the 101H, plugs still need to be drilled out.
2715434 Primary Facility 2018-04-04 Routine/Complete Inspection No Violations Noted Routine Inspection; 4/4/2018.

I met Aaron Hoffman (company man),and walked the site. At the time of the inspection, the wells were on temporary sand separation and produced water was being transferred from the production tanks to a battery of frac-tanks. Water on the well pad surface had field conductivity between 350-545 umhos/cm. Field conductivity at the south end of the frac-tank battery containment was 5,350 umhos/cm. I recommended (to Mr. Hoffman) that the frac-tank battery containment be vacuumed as soon as it is practical. The vac-truck was removing water from the well cellars and surrounding containment during the inspection. Water was ponded near the entrance to the site west of SugarCamp Road. I recommend evaluating the drainage in this existing swale between the two houses. No violations noted.

2746597 Primary Facility 2018-06-27 Site Restoration No Violations Noted Well Site Restoration Report Inspection; 6/27/2018.

At the time of the inspection the wells were in production and produced water was being stored in frac tanks on containment (a pump was installed and was actively pumping from the permanent production tanks to the frac tanks. HRI was onsite removing a temporary HDPE water line which had previously been buried in the pad. I recommend restoring the site in accordance with the ESCGP or requesting a 2-year extension. I recommend denying the Well Site Restoration Report. No violations noted.

2819093 Primary Facility 2018-12-26 Routine/Complete Inspection No Violations Noted Seven wells staged for production. Seven GPUs within 10 inch containment. No leaks detected from production equipment.

Service rig on location to run additional production pipe. Containment and rig matting in place. All baker tanks within containment. No violations noted.

2819095 Primary Facility 2018-12-26 Routine/Complete Inspection No Violations Noted Seven wells staged for production. Seven GPUs within 10 inch containment. No leaks detected from production equipment.

Service rig on location to run additional production pipe. Containment and rig matting in place. All baker tanks within containment. No violations noted.

For data sources see[8]

References