X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21705

Well Details

Well ID: 37-081-21705
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cascade Township
Operator Name: ARD OPR LLC
Well Pad ID: 152517
Farm/Lease Name: BROOKS FAMILY A-201H
License Status:
Spud Date:
Permit Date: 2017-09-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.428678
Longitude: -76.945294

For data sources see[1][2][3]

Well History

Date Event
2017-09-19 New Permit Application
2017-10-04 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-21 2018-05-09 7,630 32,117,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCl, 5.1 - 7.5% BJ Services Acidizing MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.632237 1,922,500.0
ResCare IC 300L BJ Services Iron Control MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.00505452 15369.7
Water Operator Carrier Water 7732-18-5 100 88.0665 267,792,000.0
BIOC11139A BJ Services Biocide MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.018707 56884.1
ThinFrac MP BJ Services Friction Reducer MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.14855 451709
Sand, White BJ Services Proppant MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 11.1026 33,760,700.0
CI-14 BJ Services Corrosion Inhibitor MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.00168546 5125.15
FraCare SI 720 BJ Services Scale Inhibitor MSDS and Non-MSDS Ingredients are
listed below the green line.
Listed Below 0 0.024677 75037.6
Sorbitan monooleate ethoxylate 9005-65-6 5 0.00433849 13192.4
Ethanol 64-17-5 5 0.00089081 2708.77
Hydrochloric Acid 7647-01-0 7.5 0.0474283 144220
Propargyl Alcohol 107-19-7 5 0.00005267 160.161
Petroleum distillates 64742-47-8 30 0.0260309 79154.7
Oxyalkylated Alcohol 78330-21-9 5 0.00433849 13192.4
Potassium Chloride 7447-40-7 1 0.000230626 701.286
Acetic acid, Potassium Salt 64-19-7 0.1 0.00008677 263.849
2-propenoic, polymer with sodium phosphinate, sodium salt 71050-62-9 20 0.00461252 14025.7
Tetrasodium EDTA 64-02-8 0.1 0.00008677 263.849
Benzyl-(C12-C16 Alkyl)-Dimethyl-Ammonium Chloride 68424-85-1 30 0.00534486 16252.6
Sodium Chloride 7647-14-5 5 0.00456912 13893.7
Polyoxyalkylenes 68951-67-7 30 0.000316025 960.965
Formaldehyde 50-00-0 1 0.00001053 32.0322
Olefin 64743-02-8 5 0.00005267 160.161
Fatty Acids 61790-12-3 10 0.000105342 320.322
Citric Acid 77-92-9 60 0.00275701 8383.49
Glutaraldehyde 111-30-8 10 0.00178162 5417.54
Methanol 67-56-1 100 0.00105342 3203.22
Modified Thiourea Polymer 68527-49-1 7 0.00007374 224.225
Crystalline Silica (Quartz) 14808-60-7 100 11.1026 33,760,700.0
Ethylene Glycol 107-21-1 30 0.00691878 21038.6
Acetic acid 127-08-2 1 0.000867698 2638.49
Acrylamide Modified Acrylic Polymer 38193-60-1 60 0.0520619 158309
Sorbian, mono-(9Z)-9octadecenoate 1338-43-8 5 0.00433849 13192.4
Calcium Chloride 10043-52-4 5 0.00115313 3506.43
Other Chemical(s) BJ Services See Trade Name(s) List Water 7732-18-5 92.5 0.66141 2,011,210.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 ARD OPR LLC 0.00 0 0.00 0 0.00 0
2018 ARD OPR LLC 2,542,630.71 170 0.00 0 0.00 0
2019 ARD OPR LLC 4,904,588.50 354 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 ARD OPR LLC Drilling Fluid Waste 1,271.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 ARD OPR LLC Drill Cuttings 84.00 Tons LANDFILL 100955
2017 ARD OPR LLC Drilling Fluid Waste 228.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Produced Fluid 5,565.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 ARD OPR LLC Synthetic Liner Materials 13.50 Tons LANDFILL 100955
2018 ARD OPR LLC Produced Fluid 1,585.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Unused Fracturing Fluid Waste 176.57 Tons LANDFILL 100955
2018 ARD OPR LLC Produced Fluid 18,833.00 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 139.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 ARD OPR LLC Drilling Fluid Waste 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 ARD OPR LLC Produced Fluid 902.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 ARD OPR LLC Produced Fluid 824.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid 9,487.85 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 1,117.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 ARD OPR LLC Produced Fluid 1,928.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 ARD OPR LLC Other Oil & Gas Wastes 440.22 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2646016 Primary Facility 2017-10-11 Routine/Complete Inspection No Violations Noted Arrived at 12:53. Weather: warm, rain. Three conductors in place. Cellars still to come. Two half-rounds with cuttings. No violations noted at time of inspection.
2660035 Primary Facility 2017-11-09 Routine/Complete Inspection No Violations Noted Rig had not yet arrived on-site, but containment and rig mats were in place. Powdered, bagged chemicals were being transferred to a storage location on containment on the access road; some white powdered material was visible on the berm of the containment, as well as on the access road itself. The same white powdered substance was present on the rig mats near the site entrance. Containment appeared to be good, with rigid berms around the rig mats.
2664364 Primary Facility 2017-11-27 Drilling/Alteration No Violations Noted Arrived at 11:15. Weather: sunny. Met with Bill Mitchell, company man. At the time of my inspection HP 225 was on the 203H at 1355' drilling the intermediate well bore. Three wells have been started on location: 201H, 202H, 203H. The 201H and 202H have been top holed with intermediated casing installed. The 203H well will be drilled to kickoff. Then the 201H and 202H wells will also be drilled to kickoff on water-based mud. LAstly, the mud will be swapped to oil base and the curves and laterals will be drilled. There were no violations observed during my inspection.
2665242 Primary Facility 2017-11-28 Routine/Complete Inspection No Violations Noted H&P 225 rig on location, running on the A203H well (2515' depth). I met with Bill Mitchell, ARD company man for the site. He informed me that they were preparing to run intermediate casing in the well. The sitewide containment was in fairly good condition, with some minor damage to the liner at the top of the berms, none of which appeared to be lowering the containment volume. Some berms had been pushed loose from the chemical containment area; Bill told me he would repair it. The cuttings backyard was clean and well maintained.
2672988 Primary Facility 2017-12-19 Drilling/Alteration No Violations Noted Arrived at 14:04. Weather: sunny, pleasant. Met with RD Mann, Alta Company man. H&P Flexrig 225 on the A-201H at 14088' using Baker rotary directional tool with approx. another 5000 ' to go. No violations were observed during my inspection.
2678476 Primary Facility 2018-01-03 Drilling/Alteration No Violations Noted Arrived at 13:15. Weather: sunny, calm, temperatures in high 20's. Met with Bill Mitchell, Alta Company man. H&P Flexrig 225 on the A-202H, having finished the 201H. At the time of my inspection, drilling at 13582' with plan to go to 20,950. No violations were observed during my inspection.
2682886 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted I met with RD Mann when I arrived. Currently drilling the 202 well at 18,796' with approximately 2000' to go. Housekeeping issues were widespread. The rig mats in the cuttings backyard had a mix of cuttings and sawdust or other wood drying product all over, and a small amount had been tracked off of containment. Near this area, a small puddle (less than 1 gallon) of an oily product was present on the ice off of containment; a vac truck was immediately directed to the location. On containment near the centrifuge and mud pits, the entire surface of the rig mats had a skin of oil based drill mud on them, and a pile of drill mud (2' x 2', 1' high) was next to the mud pits. The vac truck was directed to this area as well. In the chemical containment, 2 totes were hanging partially off of containment, and several piles of powdered product were present. I recommend that a more rigorous housekeeping program be enforced for this site and future drilling activities.
2725611 Primary Facility 2018-05-01 Routine/Complete Inspection No Violations Noted Frac was active when I arrived. I met Rick Hall, Steve Barbier, and Marek Romatowski of ARD. Marek walked the site with me. Containments and berms were mostly in excellent condition. Secondary containment was deployed under all trucks on the site. In the southwest corner of the sitewide containment, 10-20 gallons of water had accumulated in a low spot in the containment that showed elevated conductance (17.1 mS/cm); the pad immediately next to this area was bone dry. Marek directed a vac truck to the area. Overall condition of the site was good.
2725713 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted Routine inspection; 4/18/2018.

I entered the site and met with the Company Man, Merek Romatowski. At the time of the inspection, active completions operations were ongoing (stage 60 of 64) on the Brooks Family A-202H. Freshwater was being pumped from the Mirto impoundment and a portable tank on the nearby Vargo Compressor Station. Field conductivity was 120 umhos/cm in containment for produced water. Some friction reducer was noticeable in containment near the blender. Dust from the sand moving equipment was visible and blowing east toward the middle of the site (see photo 2). I recommended to the Company Man that they continue to vacuum water from containments (vac truck was onsite working) and look into minimizing silica dust onsite. No violations noted.

2731738 Primary Facility 2018-05-11 Complaint Inspection No Violations Noted Complaint response inspection; 5/11/2018.

I entered the site and met with the Company Man, Dean Krouse. The purpose of the inspection was to respond to a noise complaint from a nearby landowner. Although the Department does not have specific regulations related to noise, my inspection was merely to explore the concerns and discuss my observations with the complainant. I used the Decibel X app (iOS) to measure and document my findings.

At the time of the inspection, the BJ Services Frac crew was between stages, so the noise on the site was minimal. At approximately 13:45, pumping began on the next stage. The noise began to increase as additional pumps/engines came online. At approximately 14:30 the noise level appeared to stabilize at the highest level detected. At 14:34, I went up to the site entrance off Rose Valley Road. At the entrance approximately 75 decibels were detected. On the public road near the complainant's property, approximately 63 decibels were detected. These two locations are used referenc

2763068 Primary Facility 2018-08-07 Routine/Complete Inspection No Violations Noted Notice of Termination Inspection; 8/7/2018.

At the time of the inspection, 3 wells were in production. Produced water was being pumped from the production tanks to a battery of frac tanks in containment. Field conductivity in the containment was between 200-300,umhos/cm. Post Construction Stormwater Management (PCSM) is accomplished with the use of a vegetative filter strip which remains undisturbed. Overall, the site fits the Site Restoration plans and can be considered restored. I recommend approving the Notice of Termination and I recommend the operator submit the Well Site Restoration Report as soon as possible. No violations noted.

For data sources see[8]

References