X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21752

Well Details

Well ID: 37-081-21752
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Gamble Township
Operator Name: INFLECTION ENERGY (PA) LLC
Well Pad ID: 149762
Farm/Lease Name: STUNNER SMITH 10H
License Status:
Spud Date:
Permit Date: 2018-08-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.3465
Longitude: -76.958539

For data sources see[1][2][3]

Well History

Date Event
2018-08-31 New Permit Application
2018-11-02 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 INFLECTION ENERGY (PA) LLC 688,002.65 69 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 INFLECTION ENERGY (PA) LLC Drill Cuttings 586.38 Tons LANDFILL 100955
2018 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes 140.00 Bbl REUSE (AT WELL PAD)
2018 INFLECTION ENERGY (PA) LLC Synthetic Liner Materials 0.38 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Soil Contaminated by Oil & Gas Related Spills 37.03 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 787.50 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 INFLECTION ENERGY (PA) LLC Drilling Fluid Waste 1,148.33 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Synthetic Liner Materials 21.56 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 3,418.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 INFLECTION ENERGY (PA) LLC Drill Cuttings 892.80 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Other Oil & Gas Wastes 100.00 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Soil Contaminated by Oil 37.03 Tons LANDFILL 100955
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 796.25 Bbl REUSE (AT WELL PAD)
2019 INFLECTION ENERGY (PA) LLC Produced Fluid 13.10 Tons LANDFILL 100955

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2817892 Primary Facility 2018-12-17 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. Met with Inflection representative Ross Drnjevich on location. Well had 18 5/8" surface casing drilled and cemented at time of inspection. Reviewed job log from the cement job and no discrepancies were noted at time of inspection. No violations were noted at time of inspection.
2818938 Primary Facility 2018-12-26 Routine/Complete Inspection No Violations Noted A H&P rig is drilling on the Smith Well pad. The Department representative did not locate the rig manager so Department could not determine which well was being drilled.

The site had a primary containment overlaid with wood plank rig matting with beveled edges (see photo). All materials held on containment and within secondary containment. The overall site conditions were clean and well organized. No leaks or spills detected. No violations.

2822733 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted Weather was 38° and cloudy at time of inspection. Met with Inflection representatives Jamie Czerneski and Greg Malekos on location. Well recently had the 13 3/8" intermediate casing drilled and cemented to a TD of 2550'. Reviewed the cement job log and no discrepancies were noted at time of inspection. No violations were noted at time of inspection.
2827928 Primary Facility 2019-01-15 Routine/Complete Inspection No Violations Noted Weather was 25° and cloudy at time of inspection. Met with Inflection representatives Ross Drjnevitch and Greg Malekos on location. Rig had just skidded over this well. They were preparing to nipple up the BOP and begin to drill the 12 1/4" hole for the 9 5/8" intermediate casing. No violations were noted at time of inspection.
2835448 Primary Facility 2019-02-05 Routine/Complete Inspection No Violations Noted Weather was 37° and sunny at time of inspection. Met with Inflection representative Greg Malekos on location. This well had the 9 5/8" second intermediate string cemented on 1/27/2019. Reviewed the cement job log and no discrepancies were noted at time of inspection. Well was closed in with a nightcap after cementing and the rig skidded over to the 6H to drill and cements its 9 5/8" second intermediate casing. No violations were noted at time of inspection.
2840033 Primary Facility 2019-02-13 Routine/Complete Inspection No Violations Noted Weather was 30° and cloudy at time of inspection. Met with Inflection representative Jamie Czerneski on location. This well was shut in with a night cat at time of inspection. 0% combustible gas was detected in the cellar at time of inspection. Well is being batch drilled with 5 other wells on location. No violations were noted at time of inspection.
2840562 Primary Facility 2019-02-14 Routine/Complete Inspection No Violations Noted I met Ross Drnjevich of Inflection on the site. H&P 521 on location, drilling the 2HN well at 8300'. The chemical containment appeared to be in good condition, but also contained several inches of snow and ice. The secondary containment for the mud tanks had been bolted on with wood strips on the inside of the containment in the back, approximately 4-5" down from the top. Although it is unlikely that this brought the containment volume below 110% of the volume of the tanks, I still recommended to Ross that these liners be attached on the outside of the berms. Meltwater had built up to 3-4" deep on the backside of the pad, and Ross told me he would have it vacced.
2842013 Primary Facility 2019-02-20 Routine/Complete Inspection No Violations Noted Weather- 21 degrees and cloudy at time of inspection

Met with Inflection representative Ross Drjnevitch and Greg Malekos on location. Well was closed in with a nightcap at time of inspection. Wells on pad are being batch drilled. No violations noted at time of inspection.

2844556 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted Weather was 24 degrees and sunny at time of inspection. Met with Inflection representative Ross Drjnevitch on location. This well was shut in with a night cap. This well will be completed at a later date. No violations at time of inspection.
2849868 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted Weather was 12 degrees and sunny. Met with Inflection representative Jamie Czerneski and Greg Malekos on location. Well is closed in with a nightcap at time on inspection. Well had 3 string of casing drilled and cemented at time of inspection. This well will be completed at a later date. No violation noted at time of inspection.
2852796 Primary Facility 2019-03-13 Routine/Complete Inspection No Violations Noted Weather was 30 degrees and sunny. Met with Inflection representative Ross Drnjevich on location. Well is closed in with a nightcap at time on inspection. Well had 3 string of casing drilled and cemented at time of inspection. This well will be completed at a later date. No violation noted at time of inspection.

For data sources see[7]

References