If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-083-54294 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.636627,"lon":-78.29758,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: McKean | |
| Municipality: Norwich Township | |
| Operator Name: PA GEN ENERGY CO LLC | |
| Well Pad ID: 146916 | |
| Farm/Lease Name: POTATO CREEK 3H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2009-05-29 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 41.636627 | |
| Longitude: -78.297580 |
| Date | Event |
|---|---|
| 2009-05-29 | New Permit Application |
| 2009-07-29 | Performed Spud Operation |
| 2009-09-22 | Drilling Completion |
| 2009-09-25 | Perforation |
| 2011-09-19 | DEVIATED |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2010 | SM ENERGY | 409,279.90 | 82 | 0.00 | 0 | 0.00 | 0 |
| 2011 | SM ENERGY | 531,869.00 | 334 | 0.00 | 0 | 0.00 | 0 |
| 2012 | SM ENERGY | 201,180.00 | 353 | 0.00 | 0 | 0.00 | 0 |
| 2013 | SM ENERGY | 122,009.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | SM ENERGY | 133,635.00 | 345 | 0.00 | 0 | 0.00 | 0 |
| 2015 | PA GEN ENERGY CO LLC | 86,349.00 | 344 | 0.00 | 0 | 0.00 | 0 |
| 2016 | PA GEN ENERGY CO LLC | 66,613.00 | 286 | 0.00 | 0 | 0.00 | 0 |
| 2017 | PA GEN ENERGY CO LLC | 60,035.00 | 339 | 0.00 | 0 | 0.00 | 0 |
| 2018 | PA GEN ENERGY CO LLC | 29,541.00 | 173 | 0.00 | 0 | 0.00 | 0 |
| 2019 | PA GEN ENERGY CO LLC | 6,688.00 | 66 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2011 | SM ENERGY | Produced Fluid | 1,281.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
| 2011 | SM ENERGY | Produced Fluid | 143.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
| 2011 | SM ENERGY | Produced Fluid | 3,031.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2011 | SM ENERGY | Produced Fluid | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
| 2012 | SM ENERGY | Produced Fluid | 1,400.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
| 2013 | SM ENERGY | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
| 2013 | SM ENERGY | Produced Fluid | 176.00 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
| 2013 | SM ENERGY | Produced Fluid | 176.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
| 2014 | SM ENERGY | Produced Fluid | 574.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
| 2014 | SM ENERGY | Produced Fluid | 100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2014 | SM ENERGY | Produced Fluid | 574.00 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
| 2015 | PA GEN ENERGY CO LLC | Produced Fluid | 310.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
| 2015 | PA GEN ENERGY CO LLC | Drill Cuttings | 1,505.70 Tons | LANDFILL | 100361 |
| 2015 | SM ENERGY | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
| 2015 | PA GEN ENERGY CO LLC | Produced Fluid | 410.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
| 2015 | SM ENERGY | Produced Fluid | 187.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
| 2016 | PA GEN ENERGY CO LLC | Produced Fluid | 102.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW005 |
| 2016 | PA GEN ENERGY CO LLC | Produced Fluid | 302.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
| 2016 | PA GEN ENERGY CO LLC | Drill Cuttings | 238.25 Tons | LANDFILL | 100361 |
| 2017 | PA GEN ENERGY CO LLC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
| 2017 | PA GEN ENERGY CO LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2018 | PA GEN ENERGY CO LLC | Produced Fluid | 110.00 Bbl | REUSE (AT WELL PAD) | |
| 2018 | PA GEN ENERGY CO LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
For data sources see[6]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1826244 | Primary Facility | 2009-09-01 | Drilling/Alteration | No Violations Noted | |
| 1848423 | Primary Facility | 2009-12-08 | Drilling/Alteration | No Violations Noted | |
| 1872603 | Primary Facility | 2010-03-18 | Routine/Complete Inspection | No Violations Noted | |
| 1872991 | Primary Facility | 2010-03-18 | Routine/Complete Inspection | No Violations Noted | |
| 1884372 | Primary Facility | 2010-05-07 | Routine/Complete Inspection | No Violations Noted | |
| 1901772 | Primary Facility | 2010-07-27 | Routine/Complete Inspection | No Violations Noted | |
| 1906237 | Primary Facility | 2010-08-03 | Routine/Complete Inspection | No Violations Noted | |
| 1963377 | Primary Facility | 2011-03-22 | Administrative/File Review | Violation(s) Noted | |
| 2050119 | Primary Facility | 2012-02-29 | Routine/Complete Inspection | No Violations Noted | |
| 2082188 | Primary Facility | 2012-06-26 | Routine/Complete Inspection | No Violations Noted | |
| 2127870 | Primary Facility | 2013-01-02 | Routine/Complete Inspection | No Violations Noted | |
| 2162170 | Primary Facility | 2013-04-23 | Routine/Complete Inspection | No Violations Noted | |
| 2490894 | Primary Facility | 2016-05-31 | Routine/Complete Inspection | No Violations Noted | |
| 2633974 | Primary Facility | 2017-09-08 | Routine/Complete Inspection | No Violations Noted | The operator has recently filled in a pit that had been dug on the location. Seed and mulch was put down, and vegetation is beginning to grow. The well head area is in good condition with no leaks noted.
There is a fresh water impoundment on site that appears to be in good condition. |
| Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
|---|---|---|---|---|---|---|
| 1963377 | 608139 | 03/22/2011 | 2011-03-22 | 212WELLRCD - Failure to submit well record within 30 days of completion of drilling | Administrative |
| Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
|---|---|---|---|---|---|---|---|
| 608139 | 269230 | NOV - Notice of Violation | Comply/Closed | 2011-05-25 | |||
| 608139 | 270950 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-05-25 | 2011-05-25 | $500.00 | $500.00 |
For data sources see[7]