X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-083-55555

Well Details

Well ID: 37-083-55555
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Hamilton Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: WT 5575 1243
License Status:
Spud Date:
Permit Date: 2011-09-28
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.818022
Longitude: -78.879403

For data sources see[1][2][3]

Well History

Date Event
2011-09-28 New Permit Application
2012-04-18 Drilling Completion
2012-05-22 Performed Spud Operation
2012-05-29 Drilling Completion
2012-09-14 NEWLY DRILLED
2012-11-09 SKIDDED RIG

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2012 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2018 CATALYST ENERGY INC 1,128.80 365 124.02 365 68.29 365

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CATALYST ENERGY INC Produced Fluid 38.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 36.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 CATALYST ENERGY INC Produced Fluid 19.05 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE BT-008

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2050563 Primary Facility 2012-03-14 Routine/Complete Inspection No Violations Noted
2060498 Primary Facility 2012-04-19 Drilling/Alteration No Violations Noted
2060501 Primary Facility 2012-04-18 Drilling/Alteration No Violations Noted
2060503 Primary Facility 2012-04-17 Drilling/Alteration No Violations Noted
2066785 Primary Facility 2012-05-10 Drilling/Alteration No Violations Noted
2072028 Primary Facility 2012-05-23 Drilling/Alteration No Violations Noted
2072030 Primary Facility 2012-05-25 Drilling/Alteration No Violations Noted
2072034 Primary Facility 2012-05-29 Drilling/Alteration No Violations Noted
2072038 Primary Facility 2012-05-16 Drilling/Alteration No Violations Noted
2088736 Primary Facility 2012-08-01 Drilling/Alteration No Violations Noted
2090416 Primary Facility 2012-08-09 Routine/Complete Inspection No Violations Noted
2125210 Primary Facility 2012-12-21 Routine/Complete Inspection No Violations Noted

For data sources see[7]

References