If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-083-55639 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.813886,"lon":-78.847431,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Hamilton Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: BRENNAN 2570 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-01-26 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.813886 | |
Longitude: -78.847431 |
Date | Event |
---|---|
2012-01-26 | New Permit Application |
2012-03-13 | Performed Spud Operation |
2012-03-14 | Drilling Completion |
2012-05-15 | Perforation |
2012-06-15 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | 256.15 | 150 | 192.85 | 150 | 51.92 | 150 |
2014 | CATALYST ENERGY INC | 2,084.21 | 365 | 367.88 | 365 | 104.82 | 365 |
2015 | CATALYST ENERGY INC | 1,133.80 | 365 | 151.19 | 365 | 60.52 | 365 |
2016 | CATALYST ENERGY INC | 1,314.48 | 365 | 95.39 | 365 | 81.57 | 365 |
2017 | CATALYST ENERGY INC | 1,184.70 | 365 | 59.94 | 365 | 86.13 | 365 |
2018 | CATALYST ENERGY INC | 1,177.91 | 365 | 61.17 | 365 | 92.60 | 365 |
2019 | CATALYST ENERGY INC | 1,045.20 | 365 | 41.59 | 365 | 2,500.82 | 365 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | Produced Fluid | 51.92 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 21.14 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 88.76 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2016 | CATALYST ENERGY INC | Produced Fluid | 6.52 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 4.35 Bbl | ROAD SPREADING | |
2016 | CATALYST ENERGY INC | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 31.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 91.73 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 114.78 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 6.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2018 | CATALYST ENERGY INC | Produced Fluid | 11.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 101.96 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 17.39 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 2.39 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2049937 | Primary Facility | 2012-03-09 | Routine/Complete Inspection | No Violations Noted | |
2051565 | Primary Facility | 2012-03-16 | Drilling/Alteration | No Violations Noted | |
2055320 | Primary Facility | 2012-03-30 | Site Restoration | No Violations Noted | |
2084373 | Primary Facility | 2012-07-19 | Site Restoration | No Violations Noted | |
2117265 | Primary Facility | 2012-11-20 | Routine/Complete Inspection | Violation(s) Noted | |
2118731 | Primary Facility | 2012-11-27 | Compliance Evaluation | No Violations Noted | |
2521060 | Primary Facility | 2016-09-21 | Complaint Inspection | Violation(s) Noted | |
2533157 | Primary Facility | 2016-10-25 | Follow-up Inspection | Outstanding Violations - No Viols Req'd |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2117265 | 654150 | 11/20/2012 | 2012-11-20 | 401 CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | |
2117265 | 654151 | 11/20/2012 | 2012-11-20 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
2117265 | 654152 | 11/20/2012 | 2012-11-20 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative | |
2117265 | 654153 | 11/20/2012 | 2012-11-20 | 102.22 - Failure to achieve permanent stabilization of earth disturbance activity. | Administrative | |
2521060 | 768637 | 2016-09-21 | 2018-01-22 | CSL 307(a) | Environmental Health & Safety | |
2521060 | 768638 | 2016-09-21 | 2018-01-22 | SWMA 301 | Environmental Health & Safety | |
2521060 | 768639 | 2016-09-21 | 2018-01-22 | 78.54 | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
654150 | 290849 | NOV - Notice of Violation | Comply/Closed | 2012-11-27 | |||
654151 | 290849 | NOV - Notice of Violation | Comply/Closed | 2012-11-27 | |||
654152 | 290849 | NOV - Notice of Violation | Comply/Closed | 2012-11-27 | |||
654153 | 290849 | NOV - Notice of Violation | Comply/Closed | 2012-11-27 | |||
768637 | 347327 | NOV - Notice of Violation | 2018-01-22 | ||||
768638 | 347327 | NOV - Notice of Violation | 2018-01-22 | ||||
768639 | 347327 | NOV - Notice of Violation | 2018-01-22 |
For data sources see[7]