If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-083-55640 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.813856,"lon":-78.850286,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Hamilton Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: BRENNAN 2571 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-01-26 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.813856 | |
Longitude: -78.850286 |
Date | Event |
---|---|
2012-01-26 | New Permit Application |
2012-02-24 | Performed Spud Operation |
2012-03-01 | Drilling Completion |
2012-04-30 | Perforation |
2012-07-23 | Perforation |
2012-09-14 | NEWLY DRILLED |
2012-11-09 | REWORKED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | 256.15 | 150 | 192.85 | 150 | 51.92 | 150 |
2014 | CATALYST ENERGY INC | 2,084.21 | 365 | 367.88 | 365 | 104.82 | 365 |
2015 | CATALYST ENERGY INC | 1,133.80 | 365 | 151.19 | 365 | 60.52 | 365 |
2016 | CATALYST ENERGY INC | 1,314.48 | 365 | 95.39 | 365 | 81.57 | 365 |
2017 | CATALYST ENERGY INC | 1,184.70 | 365 | 59.94 | 365 | 86.13 | 365 |
2018 | CATALYST ENERGY INC | 1,177.91 | 365 | 61.17 | 365 | 92.60 | 365 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CATALYST ENERGY INC | Produced Fluid | 51.92 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 21.14 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 88.76 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2016 | CATALYST ENERGY INC | Produced Fluid | 6.52 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 4.35 Bbl | ROAD SPREADING | |
2016 | CATALYST ENERGY INC | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 31.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 91.73 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 115.78 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 7.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2018 | CATALYST ENERGY INC | Produced Fluid | 12.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 101.96 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 17.39 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 2.39 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2038107 | Primary Facility | 2012-01-26 | Routine/Complete Inspection | No Violations Noted | |
2046678 | Primary Facility | 2012-02-28 | Drilling/Alteration | No Violations Noted | |
2051625 | Primary Facility | 2012-03-01 | Drilling/Alteration | No Violations Noted | |
2055321 | Primary Facility | 2012-03-30 | Site Restoration | No Violations Noted | |
2089700 | Primary Facility | 2012-08-07 | Site Restoration | No Violations Noted |
For data sources see[7]