If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-083-55968 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.701506,"lon":-78.784064,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: McKean | |
| Municipality: Wetmore Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: WARRANT 3122 | |
| License Status: Active | |
| Spud Date: 2013-06-11 | |
| Permit Date: 2013-03-07 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.701506 | |
| Longitude: -78.784064 |
| Date | Event |
|---|---|
| 2013-03-07 | New Permit Application |
| 2013-06-10 | Performed Spud Operation |
| 2013-06-14 | Drilling Completion |
| 2013-08-09 | Performed Stage 1 of Stimulation |
| 2013-08-09 | Performed Stage 2 of Stimulation |
| 2013-08-09 | Performed Stage 3 of Stimulation |
| 2013-08-09 | Performed Stage 4 of Stimulation |
| 2013-08-09 | Performed Stage 5 of Stimulation |
| 2013-08-09 | Performed Stage 6 of Stimulation |
| 2013-08-09 | Performed Stage 7 of Stimulation |
| 2013-08-09 | Performed Stage 8 of Stimulation |
| 2019-02-25 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2013-08-09 | 1 | Sand | 40,200 | 2,200 | 2,400 |
| 2013-08-09 | 2 | Sand | 40,200 | 2,300 | 2,000 |
| 2013-08-09 | 3 | Sand | 40,200 | 2,300 | 3,200 |
| 2013-08-09 | 4 | Sand | 40,200 | 2,600 | 2,700 |
| 2013-08-09 | 5 | Sand | 40,200 | 2,650 | 3,650 |
| 2013-08-09 | 6 | Sand | 40,200 | 2,650 | 3,600 |
| 2013-08-09 | 7 | Sand | 40,200 | 2,900 | 3,200 |
| 2013-08-09 | 8 | Sand | 40,200 | 3,800 | 3,700 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | 5,877.20 | 365 | 1043.60 | 365 | 321.93 | 365 |
| 2015 | CATALYST ENERGY INC | 1,140.11 | 365 | 124.94 | 365 | 44.62 | 365 |
| 2016 | CATALYST ENERGY INC | 171.57 | 335 | 22.79 | 335 | 5.56 | 335 |
| 2017 | CATALYST ENERGY INC | 914.00 | 365 | 202.63 | 365 | 47.51 | 365 |
| 2018 | CATALYST ENERGY INC | 1,532.71 | 365 | 132.63 | 365 | 54.98 | 365 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | Produced Fluid | 849.63 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
| 2014 | CATALYST ENERGY INC | Produced Fluid | 849.63 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 69.05 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 26.86 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 273.33 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 334.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 217.29 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 72.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 115.82 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 14.29 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2168907 | Primary Facility | 2013-05-23 | Routine/Complete Inspection | No Violations Noted | |
| 2174595 | Primary Facility | 2013-06-11 | Drilling/Alteration | No Violations Noted | |
| 2398009 | Primary Facility | 2015-07-31 | Routine/Complete Inspection | No Violations Noted |
For data sources see[8]