If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-083-55980 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.81205,"lon":-78.850719,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Hamilton Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: BRENNAN LEASE 3663 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-03-07 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.812050 | |
Longitude: -78.850719 |
Date | Event |
---|---|
2013-03-07 | New Permit Application |
2013-07-22 | Performed Spud Operation |
2013-07-26 | Drilling Completion |
2013-11-04 | Perforation |
2013-11-18 | Perforation |
2013-12-30 | NEWLY DRILLED |
2014-03-14 | REWORKED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | 2,084.21 | 365 | 367.88 | 365 | 104.82 | 365 |
2015 | CATALYST ENERGY INC | 1,133.80 | 365 | 151.19 | 365 | 60.52 | 365 |
2016 | CATALYST ENERGY INC | 1,314.48 | 365 | 95.39 | 365 | 81.57 | 365 |
2017 | CATALYST ENERGY INC | 1,184.70 | 365 | 59.94 | 365 | 86.13 | 365 |
2018 | CATALYST ENERGY INC | 1,177.91 | 365 | 61.17 | 365 | 92.60 | 365 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 21.14 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | CATALYST ENERGY INC | Produced Fluid | 88.76 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2016 | CATALYST ENERGY INC | Produced Fluid | 6.52 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 4.35 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 31.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 91.73 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 54.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | CATALYST ENERGY INC | Produced Fluid | 157.78 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 49.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 2.39 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 17.39 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 101.96 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2186490 | Primary Facility | 2013-07-24 | Routine/Complete Inspection | No Violations Noted | |
2315515 | Primary Facility | 2014-10-23 | Site Restoration | No Violations Noted |
For data sources see[7]