If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-083-55982 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.806989,"lon":-78.847083,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: McKean | |
| Municipality: Hamilton Township | |
| Operator Name: CATALYST ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: BRENNAN LEASE | |
| License Status: Active | |
| Spud Date: 2013-07-16 | |
| Permit Date: 2013-03-07 | |
| Well Type: OIL | |
| Unconventional Well: N | |
| Configuration: Vertical Well | |
| Conservation: No | |
| Latitude: 41.806989 | |
| Longitude: -78.847083 |
| Date | Event |
|---|---|
| 2013-03-07 | New Permit Application |
| 2013-07-16 | Performed Spud Operation |
| 2013-07-17 | Drilling Completion |
| 2013-09-09 | Performed Stage 1 of Stimulation |
| 2013-09-09 | Performed Stage 2 of Stimulation |
| 2013-09-09 | Performed Stage 3 of Stimulation |
| 2013-09-09 | Performed Stage 4 of Stimulation |
| 2013-09-09 | Performed Stage 5 of Stimulation |
| 2013-09-09 | Performed Stage 6 of Stimulation |
| 2013-09-09 | Performed Stage 7 of Stimulation |
| 2013-09-09 | Performed Stage 8 of Stimulation |
| 2013-09-09 | Performed Stage 9 of Stimulation |
| 2013-09-12 | Performed Stage 10 of Stimulation |
| 2013-09-12 | Performed Stage 11 of Stimulation |
| 2013-09-12 | Performed Stage 12 of Stimulation |
| 2013-09-12 | Performed Stage 13 of Stimulation |
| 2013-09-12 | Performed Stage 14 of Stimulation |
| 2013-09-12 | Performed Stage 15 of Stimulation |
| 2013-09-12 | Performed Stage 16 of Stimulation |
| 2013-09-12 | Performed Stage 17 of Stimulation |
| 2013-09-12 | Performed Stage 18 of Stimulation |
| 2013-09-12 | Performed Stage 19 of Stimulation |
| 2013-09-12 | Performed Stage 20 of Stimulation |
| 2013-09-12 | Performed Stage 21 of Stimulation |
| 2013-09-12 | Performed Stage 22 of Stimulation |
| 2013-09-12 | Performed Stage 23 of Stimulation |
| 2019-02-26 | Newly Drilled |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2013-09-09 | 1 | Sand | 40,200 | 1,800 | 1,300 |
| 2013-09-09 | 2 | Sand | 40,200 | 1,900 | 1,500 |
| 2013-09-09 | 3 | Sand | 40,200 | 2,000 | 2,400 |
| 2013-09-09 | 4 | Sand | 40,200 | 2,400 | 1,800 |
| 2013-09-09 | 5 | Sand | 40,200 | 2,000 | 2,300 |
| 2013-09-09 | 6 | Sand | 40,200 | 2,200 | 222 |
| 2013-09-09 | 7 | Sand | 40,200 | 2,300 | 2,900 |
| 2013-09-09 | 8 | Sand | 40,200 | 2,500 | 2,200 |
| 2013-09-09 | 9 | Sand | 40,200 | 2,600 | 3,100 |
| 2013-09-12 | 10 | Sand | 40,200 | 2,400 | 3,400 |
| 2013-09-12 | 11 | Sand | 40,200 | 300 | 3,500 |
| 2013-09-12 | 12 | Sand | 40,200 | 2,800 | 2,500 |
| 2013-09-12 | 13 | Sand | 40,200 | 2,700 | 3,400 |
| 2013-09-12 | 14 | Sand | 40,200 | 2,900 | 2,400 |
| 2013-09-12 | 15 | Sand | 40,200 | 1,900 | 2,950 |
| 2013-09-12 | 16 | Sand | 40,200 | 2,600 | 3,000 |
| 2013-09-12 | 17 | Sand | 40,200 | 2,200 | 1,900 |
| 2013-09-12 | 18 | Sand | 40,200 | 2,600 | 2,400 |
| 2013-09-12 | 19 | Sand | 40,200 | 2,680 | 3,450 |
| 2013-09-12 | 20 | Sand | 40,200 | 2,600 | 3,100 |
| 2013-09-12 | 21 | Sand | 40,200 | 2,600 | 3,700 |
| 2013-09-12 | 22 | Sand | 40,200 | 2,900 | 2,100 |
| 2013-09-12 | 23 | Sand | 40,200 | 2,900 | 3,500 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | 2,084.21 | 365 | 367.88 | 365 | 104.82 | 365 |
| 2015 | CATALYST ENERGY INC | 1,133.80 | 365 | 151.19 | 365 | 60.52 | 365 |
| 2016 | CATALYST ENERGY INC | 1,314.48 | 365 | 95.39 | 365 | 81.57 | 365 |
| 2017 | CATALYST ENERGY INC | 1,184.70 | 365 | 59.94 | 365 | 86.13 | 365 |
| 2018 | CATALYST ENERGY INC | 1,177.91 | 365 | 61.17 | 365 | 92.60 | 365 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
| 2014 | CATALYST ENERGY INC | Produced Fluid | 246.36 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 21.14 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 92.66 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
| 2015 | CATALYST ENERGY INC | Produced Fluid | 38.88 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 88.76 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 6.52 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 58.17 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
| 2016 | CATALYST ENERGY INC | Produced Fluid | 4.35 Bbl | ROAD SPREADING | |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 31.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2017 | CATALYST ENERGY INC | Produced Fluid | 91.73 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 56.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 159.78 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
| 2018 | CATALYST ENERGY INC | Produced Fluid | 51.52 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 2.39 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 17.39 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
| 2019 | CATALYST ENERGY INC | Produced Fluid | 101.96 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2185315 | Primary Facility | 2013-07-17 | Drilling/Alteration | No Violations Noted | |
| 2315513 | Primary Facility | 2014-10-23 | Site Restoration | No Violations Noted |
For data sources see[8]