X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-083-55982

Well Details

Well ID: 37-083-55982
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Hamilton Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: BRENNAN LEASE
License Status: Active
Spud Date: 2013-07-16
Permit Date: 2013-03-07
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.806989
Longitude: -78.847083

For data sources see[1][2][3]

Well History

Date Event
2013-03-07 New Permit Application
2013-07-16 Performed Spud Operation
2013-07-17 Drilling Completion
2013-09-09 Performed Stage 1 of Stimulation
2013-09-09 Performed Stage 2 of Stimulation
2013-09-09 Performed Stage 3 of Stimulation
2013-09-09 Performed Stage 4 of Stimulation
2013-09-09 Performed Stage 5 of Stimulation
2013-09-09 Performed Stage 6 of Stimulation
2013-09-09 Performed Stage 7 of Stimulation
2013-09-09 Performed Stage 8 of Stimulation
2013-09-09 Performed Stage 9 of Stimulation
2013-09-12 Performed Stage 10 of Stimulation
2013-09-12 Performed Stage 11 of Stimulation
2013-09-12 Performed Stage 12 of Stimulation
2013-09-12 Performed Stage 13 of Stimulation
2013-09-12 Performed Stage 14 of Stimulation
2013-09-12 Performed Stage 15 of Stimulation
2013-09-12 Performed Stage 16 of Stimulation
2013-09-12 Performed Stage 17 of Stimulation
2013-09-12 Performed Stage 18 of Stimulation
2013-09-12 Performed Stage 19 of Stimulation
2013-09-12 Performed Stage 20 of Stimulation
2013-09-12 Performed Stage 21 of Stimulation
2013-09-12 Performed Stage 22 of Stimulation
2013-09-12 Performed Stage 23 of Stimulation
2019-02-26 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-09-09 1 Sand 40,200 1,800 1,300
2013-09-09 2 Sand 40,200 1,900 1,500
2013-09-09 3 Sand 40,200 2,000 2,400
2013-09-09 4 Sand 40,200 2,400 1,800
2013-09-09 5 Sand 40,200 2,000 2,300
2013-09-09 6 Sand 40,200 2,200 222
2013-09-09 7 Sand 40,200 2,300 2,900
2013-09-09 8 Sand 40,200 2,500 2,200
2013-09-09 9 Sand 40,200 2,600 3,100
2013-09-12 10 Sand 40,200 2,400 3,400
2013-09-12 11 Sand 40,200 300 3,500
2013-09-12 12 Sand 40,200 2,800 2,500
2013-09-12 13 Sand 40,200 2,700 3,400
2013-09-12 14 Sand 40,200 2,900 2,400
2013-09-12 15 Sand 40,200 1,900 2,950
2013-09-12 16 Sand 40,200 2,600 3,000
2013-09-12 17 Sand 40,200 2,200 1,900
2013-09-12 18 Sand 40,200 2,600 2,400
2013-09-12 19 Sand 40,200 2,680 3,450
2013-09-12 20 Sand 40,200 2,600 3,100
2013-09-12 21 Sand 40,200 2,600 3,700
2013-09-12 22 Sand 40,200 2,900 2,100
2013-09-12 23 Sand 40,200 2,900 3,500

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CATALYST ENERGY INC 2,084.21 365 367.88 365 104.82 365
2015 CATALYST ENERGY INC 1,133.80 365 151.19 365 60.52 365
2016 CATALYST ENERGY INC 1,314.48 365 95.39 365 81.57 365
2017 CATALYST ENERGY INC 1,184.70 365 59.94 365 86.13 365
2018 CATALYST ENERGY INC 1,177.91 365 61.17 365 92.60 365

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CATALYST ENERGY INC Produced Fluid 246.36 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 246.36 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 21.14 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2015 CATALYST ENERGY INC Produced Fluid 38.88 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 92.66 Bbl CENT WASTE TRT FAC NPDES PA0102784
2015 CATALYST ENERGY INC Produced Fluid 92.66 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2015 CATALYST ENERGY INC Produced Fluid 38.88 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 CATALYST ENERGY INC Produced Fluid 88.76 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2016 CATALYST ENERGY INC Produced Fluid 6.52 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 58.17 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 58.17 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 4.35 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 31.99 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 CATALYST ENERGY INC Produced Fluid 91.73 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 56.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 CATALYST ENERGY INC Produced Fluid 159.78 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 51.52 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE BT-008
2019 CATALYST ENERGY INC Produced Fluid 2.39 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019 CATALYST ENERGY INC Produced Fluid 17.39 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE BT-008
2019 CATALYST ENERGY INC Produced Fluid 101.96 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2185315 Primary Facility 2013-07-17 Drilling/Alteration No Violations Noted
2315513 Primary Facility 2014-10-23 Site Restoration No Violations Noted

For data sources see[8]

References