X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-083-56358

Well Details

Well ID: 37-083-56358
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Lafayette Township
Operator Name: CATALYST ENERGY INC
Well Pad ID:
Farm/Lease Name: WT 3410
License Status: Active
Spud Date: 2014-06-17
Permit Date: 2013-11-08
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.805544
Longitude: -78.770072

For data sources see[1][2][3]

Well History

Date Event
2013-11-08 New Permit Application
2014-06-17 Performed Spud Operation
2014-06-20 Drilling Completion
2015-09-15 Performed Stage 1 of Stimulation
2015-09-15 Performed Stage 10 of Stimulation
2015-09-15 Performed Stage 12 of Stimulation
2015-09-15 Performed Stage 13 of Stimulation
2015-09-15 Performed Stage 2 of Stimulation
2015-09-15 Performed Stage 3 of Stimulation
2015-09-15 Performed Stage 4 of Stimulation
2015-09-15 Performed Stage 5 of Stimulation
2015-09-15 Performed Stage 6 of Stimulation
2015-09-15 Performed Stage 7 of Stimulation
2015-09-15 Performed Stage 9 of Stimulation
2015-10-13 Partially Plugged
2016-09-16 Performed Stage 11 of Stimulation
2017-02-22 Finished Plugging

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-09-15 1 SAND 69,140 1,700 2,100
2015-09-15 2 SAND 69,140 2,000 3,800
2015-09-15 3 SAND 69,140 1,900 0
2015-09-15 4 SAND 69,140 2,150 3,800
2015-09-15 5 SAND 69,140 2,600 3,800
2015-09-15 6 SAND 69,140 2,800 3,800
2015-09-15 7 SAND 69,140 2,300 2,300
8 69,140 0 0
2015-09-15 9 SAND 69,140 3,900 3,900
2015-09-15 10 SAND 69,140 2,300 2,300
2016-09-16 11 SAND 69,140 2,300 2,300
2015-09-15 12 SAND 69,140 2,250 2,250
2015-09-15 13 SAND 69,140 2,300 2,300

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2015 CATALYST ENERGY INC 253.6 182 15.84 182 7.96 182
2016 CATALYST ENERGY INC 188.3 274 27.22 274 7.38 274
2017 CATALYST ENERGY INC 287.30 365 45.87 365 13.62 365
2018 CATALYST ENERGY INC 307.50 365 30.78 365 16.05 365

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CATALYST ENERGY INC Produced Fluid 19.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2015 CATALYST ENERGY INC Produced Fluid 176.5 Bbl CENT WASTE TRT FAC NPDES PA0101508
2015 CATALYST ENERGY INC Produced Fluid 176.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 55.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016 CATALYST ENERGY INC Produced Fluid 31.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 CATALYST ENERGY INC Produced Fluid 10.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 CATALYST ENERGY INC Produced Fluid 55 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 CATALYST ENERGY INC Produced Fluid 136.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2016 CATALYST ENERGY INC Produced Fluid 20.00 Bbl ROAD SPREADING
2017 CATALYST ENERGY INC Produced Fluid 360.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 CATALYST ENERGY INC Produced Fluid 185.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017 CATALYST ENERGY INC Produced Fluid 11.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2018 CATALYST ENERGY INC Produced Fluid 10.00 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA
2018 CATALYST ENERGY INC Produced Fluid 140.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2018 CATALYST ENERGY INC Produced Fluid 30.33 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018 CATALYST ENERGY INC Produced Fluid 212.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2283981 Primary Facility 2014-06-24 Routine/Complete Inspection No Violations Noted
2289143 Primary Facility 2014-07-24 Administrative/File Review No Violations Noted
2294583 Primary Facility 2014-08-06 Routine/Complete Inspection No Violations Noted
2411119 Primary Facility 2015-09-30 Routine/Complete Inspection No Violations Noted
2573772 Primary Facility 2017-03-22 Administrative/File Review No Violations Noted
2594094 Primary Facility 2017-05-16 Site Restoration No Violations Noted This is a combination well with an electric powered pump jack attached. No spills or leaks or noted on this site. Vegetation is good around the site. This site is stable. The well is tagged.

For data sources see[8]

References