X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-083-57099

Well Details

Well ID: 37-083-57099
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Sergeant Township
Operator Name: PVE OIL CORP INC
Well Pad ID:
Farm/Lease Name: BURNING WELL
License Status: Active
Spud Date: 2018-11-16
Permit Date: 2018-06-20
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.650586
Longitude: -78.648639

For data sources see[1][2][3]

Well History

Date Event
2018-06-20 New Permit Application
2018-11-16 Performed Spud Operation
2018-11-30 Drilling Completion
2019-01-21 Perforation
2019-01-23 Performed Stage 1 of Stimulation
2019-10-03 Newly Drilled

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2019-01-23 1 Sand 16,800 3,300 3,100

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 PVE OIL CORP INC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2019 PVE OIL CORP INC Produced Fluid 88.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2806728 Primary Facility 2018-11-26 Drilling/Alteration No Violations Noted I received a text message this morning at 6:35 am. From Wally Howard stating the results of a cement job. After further investigation I found that the spud was on the 16th and they cemented on the 21st according to Wally Howard he sent the texts before the cement job but I did not receive them. I spoke with Brad Little PVE about using green-port for notification so this doesn't happen again or to make sure they get a confirmation that the notice was received if texting or leaving a message. 78.85 e states The operator shall notify the department a minimum of 1 day before cementing of the surface casing begins unless the cementing operation begins within 72 hours of commencement of drilling. The control and disposal plan was in the locked dog house they said.
2809892 Primary Facility 2018-12-04 Routine/Complete Inspection No Violations Noted This is a recently drilled well with the rig still on site in preparation to move. The cuttings and fluid were flowed into a 20 mil lined pit on

location. There is also a large tank on site. This well permit is available in a tree on site. This site is snow covered.

2820172 Primary Facility 2018-12-28 Administrative/File Review No Violations Noted

For data sources see[8]

References