X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-085-23707

Well Details

Well ID: 37-085-23707
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Hempfield Township
Operator Name: BOBCAT WELL & PIPELINE LLC
Well Pad ID:
Farm/Lease Name: ADZIMA 2
License Status: ACTIVE
Spud Date:
Permit Date: 2005-01-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.387337
Longitude: -80.357271

For data sources see[1][2][3]

Well History

Date Event
2005-01-21 New Permit Application
2005-11-25 Performed Spud Operation
2005-12-03 Drilling Completion
2005-12-12 Perforation
2006-01-05 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 D & L ENERGY INC 12318.00 366 166.00 366 0.00 0
2010 D & L ENERGY INC 4,996.80 365 109.19 365 0.00 0
2011 D & L ENERGY INC 4,036.50 365 90.14 365 0.00 0
2012 D & L ENERGY INC 3,383.30 365 81.08 365 0.00 0
2013 D & L ENERGY INC 2,844.88 365 0.01 365 0.00 0
2015 BOBCAT WELL & PIPELINE LLC 579.49 146 119.69 146 0.00 0
2016 BOBCAT WELL & PIPELINE LLC 0.00 0 0.00 0 0.00 0
2017 BOBCAT WELL & PIPELINE LLC 798.00 27 0.00 0 0.00 0
2018 BOBCAT WELL & PIPELINE LLC 623.57 60 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 D & L ENERGY INC Produced Fluid 105.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-22038
2010 D & L ENERGY INC Produced Fluid 75.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011 D & L ENERGY INC Produced Fluid 12.00 Bbl INJECTION DISPOSAL WELL 34-007-22038
2011 D & L ENERGY INC Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2012 D & L ENERGY INC Produced Fluid 81.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2012 D & L ENERGY INC Produced Fluid 74.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2013 D & L ENERGY INC Produced Fluid 37.00 Bbl ROAD SPREADING
2013 D & L ENERGY INC Produced Fluid 92.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2015 BOBCAT WELL & PIPELINE LLC Produced Fluid 12.00 Bbl ROAD SPREADING
2015 BOBCAT WELL & PIPELINE LLC Produced Fluid 281.00 Bbl INJECTION DISPOSAL WELL 34-007-20919

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1891685 Primary Facility 2010-06-14 Complaint Inspection No Violations Noted
1896795 Primary Facility 2010-06-17 Routine/Complete Inspection No Violations Noted
2628399 Primary Facility 2017-08-23 Routine/Complete Inspection No Violations Noted Routine inspection for Adzima 2 done in conjunction with Adzima 1 NOV follow-up inspection.

Combined tank battery for Adzima 1 (085-23644) and Adzima 2 (085-23707). Previously noted spill at tank battery with violation noted 5/14/15 for Adzima 1. Leaking tank caused spill of brine/oil to ground which seeped through (unlined) earthen dike. Operator initially removed soil from site, but has not completed cleanup via Act 2/alternate process to analyze/clear remaining soil. Well is shut in at wellhead. Rabbit and well tag at wellhead. Tank battery has 1500 gal poly tank, 100 bbl green steel tank and two separator units. All tanks are empty. Old leaking tank (210 bbl) has been removed from dike but is laying next to dike. A replacement (red steel 100 bbl) tank is also laying outside of the dike, near the driveway. No production reported for well since 2015. Conservation work (food plots) being done at well pad clearing.

2670899 Primary Facility 2017-12-13 Routine/Complete Inspection No Violations Noted Routine inspection for Adzima 2 done in conjunction with Adzima 1 NOV follow-up inspection.

Combined tank battery for Adzima 1 (085-23644) and Adzima 2 (085-23707). Previously noted spill at tank battery with violation noted 5/14/15 for Adzima 1. Leaking tank caused spill of brine/oil to ground which seeped through (unlined) earthen dike. Operator initially removed soil from site, but has not completed cleanup via Act 2/alternate process to analyze/clear remaining soil. Both wells are producing with tanks and separators inside reconstructed dike.

For data sources see[7]

References