If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-085-23982 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.394637,"lon":-80.347271,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Mercer | |
Municipality: Hempfield Township | |
Operator Name: BOBCAT WELL & PIPELINE LLC | |
Well Pad ID: | |
Farm/Lease Name: GREENLEE 1 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2005-12-27 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.394637 | |
Longitude: -80.347271 |
Date | Event |
---|---|
2005-12-27 | New Permit Application |
2006-04-27 | Performed Spud Operation |
2006-05-02 | Drilling Completion |
2006-05-08 | Perforation |
2006-05-31 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | D & L ENERGY INC | 8809.00 | 366 | 153.00 | 365 | 0.00 | 0 |
2010 | D & L ENERGY INC | 5,547.90 | 365 | 109.06 | 365 | 0.00 | 0 |
2011 | D & L ENERGY INC | 4,857.30 | 365 | 120.34 | 365 | 0.00 | 0 |
2012 | D & L ENERGY INC | 4,466.90 | 365 | 65.61 | 365 | 0.00 | 0 |
2013 | D & L ENERGY INC | 3,526.56 | 365 | 0.01 | 365 | 0.00 | 0 |
2015 | BOBCAT WELL & PIPELINE LLC | 2,254.87 | 240 | 13.00 | 240 | 0.00 | 0 |
2016 | BOBCAT WELL & PIPELINE LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | BOBCAT WELL & PIPELINE LLC | 718.40 | 27 | 0.00 | 0 | 0.00 | 0 |
2018 | BOBCAT WELL & PIPELINE LLC | 900.15 | 60 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | D & L ENERGY INC | Produced Fluid | 189.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-22038 |
2010 | D & L ENERGY INC | Produced Fluid | 48.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2011 | D & L ENERGY INC | Produced Fluid | 84.00 Bbl | INJECTION DISPOSAL WELL | 34-007-22038 |
2011 | D & L ENERGY INC | Produced Fluid | 57.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
2012 | D & L ENERGY INC | Produced Fluid | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
2012 | D & L ENERGY INC | Produced Fluid | 84.00 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2013 | D & L ENERGY INC | Produced Fluid | 10.00 Bbl | ROAD SPREADING | |
2013 | D & L ENERGY INC | Produced Fluid | 60.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
2013 | D & L ENERGY INC | Produced Fluid | 38.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2017 | BOBCAT WELL & PIPELINE LLC | Produced Fluid | 25.00 Bbl | ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1529949 | Primary Facility | 2006-04-20 | Compliance Evaluation | No Violations Noted | |
1532122 | Primary Facility | 2006-04-28 | Drilling/Alteration | No Violations Noted | |
1550830 | Primary Facility | 2006-07-14 | Compliance Evaluation | No Violations Noted | |
1891688 | Primary Facility | 2010-06-14 | Complaint Inspection | No Violations Noted | |
1891700 | Primary Facility | 2010-06-15 | Complaint Inspection | No Violations Noted | |
2812329 | Primary Facility | 2018-12-06 | Incident- Response to Accident or Event | No Violations Noted | On site to investigate a report of an explosion at a gas well. I arrived on scene and met Dustin Wyant, PA DEP Emergency Response and no one else on site. We found the well was leaking below the two inch valve on the tubing. I talked to David Rice (330-716-3967) and he reported the well-tender was on site earlier in the morning. After he left the well kicked on and the plunger traveled up hard and dislodged the lubricator from the two inch valve. Responders on site when the well-tender returned and shut the well in. The two inch valve threads were damaged and continues to leak a little. A crew is being scheduled to make repairs to the well. Mr. Rice of Bobcat Well & Pipeline will also secure the location to keep people away until repairs are. made. The Greenlee No.1 (085-23982) and Greenlee No.2 (085-23881) production units and brine tank share the same containment area (dike). Production was being recorded on the Greenlee No.1 While on site Anthony Sellards arrived on site and said he was the one |
2815762 | Primary Facility | 2018-12-13 | Routine/Partial Inspection | No Violations Noted | Remarks: Previous inspection showed on site to investigate a report of an explosion at a gas well. We found the well was leaking below the two inch valve on the tubing. Mr. Rice of Bobcat Well & Pipeline was scheduled to secure the location and make necessary repairs to the well. Todays inspection shows the backside tied in for production in attempt to feed the well down to replace the leaking valve. Needed parts are on site for repairs. |
For data sources see[7]