If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-085-24679 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.288061,"lon":-80.310453,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Mercer | |
Municipality: Jefferson Township | |
Operator Name: HILCORP ENERGY CO | |
Well Pad ID: 150182 | |
Farm/Lease Name: JEFFERSON MCGHEE 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-12-05 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.288061 | |
Longitude: -80.310453 |
Date | Event |
---|---|
2013-12-05 | New Permit Application |
2013-12-16 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-10-01 | 2014-10-07 | 7,405 | 7,382,210 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Hilcorp | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.2325 | 61,604,600.0 |
EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.0165343 | 11950.7 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00137786 | 995.892 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00826715 | 5975.35 | ||||
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrogen Chloride | 7647-01-0 | 7.5 | 0.0758077 | 54792.5 | |
Unihib G | GeoSafe | Acid Inhibitor | Thiourea | 62-56-6 | 1 | 0.00000333 | 2.406 | |
Short chained glycol ether | 112-34-5 | 60 | 0.000199717 | 144.352 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000333 | 2.406 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000333 | 2.406 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000116501 | 84.205 | ||||
Methanol | 67-56-1 | 5 | 0.00001664 | 12.029 | ||||
Sand (Proppant) | Sargent | Proppant | Silica | 14808-60-7 | 99.9 | 13.6268 | 9,849,240.0 | |
Unislick ST50 | CESI | Friction Reducer | Petroleum Distillates, Hydrotreated Light | 64742-47-8 | 30 | 0.0232884 | 16832.5 | |
Scale Hib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00323648 | 2339.27 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | HILCORP ENERGY CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | HILCORP ENERGY CO | 54,076.00 | 51 | 0.00 | 0 | 3,961.00 | 51 |
2015 | HILCORP ENERGY CO | 170,546.00 | 356 | 0.00 | 0 | 6,316.00 | 356 |
2016 | HILCORP ENERGY CO | 95,654.00 | 347 | 0.00 | 0 | 3,007.00 | 347 |
2017 | HILCORP ENERGY CO | 76,295.00 | 346 | 0.00 | 0 | 2,262.00 | 346 |
2018 | HILCORP ENERGY CO | 65,380.00 | 344 | 0.00 | 0 | 1,438.00 | 344 |
2019 | HILCORP ENERGY CO | 49,693.00 | 302 | 910.00 | 302 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | HILCORP ENERGY CO | Fracing Fluid Waste | 3,820.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2014 | HILCORP ENERGY CO | Fracing Fluid Waste | 3,820.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | HILCORP ENERGY CO | Produced Fluid | 353.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24063 |
2016 | HILCORP ENERGY CO | Produced Fluid | 902.00 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
2016 | HILCORP ENERGY CO | Produced Fluid | 1,550.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2016 | HILCORP ENERGY CO | Produced Fluid | 1,261.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | HILCORP ENERGY CO | Produced Fluid | 3,260.38 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | HILCORP ENERGY CO | Produced Fluid | 965.50 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
2018 | HILCORP ENERGY CO | Produced Fluid | 10,607.25 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | HILCORP ENERGY CO | Produced Fluid | 4,113.09 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2240596 | Primary Facility | 2014-01-28 | Drilling/Alteration | No Violations Noted | |
2243413 | Primary Facility | 2014-01-31 | Drilling/Alteration | No Violations Noted | |
2243434 | Primary Facility | 2014-02-06 | Drilling/Alteration | Violation(s) Noted | |
2272435 | Primary Facility | 2014-05-20 | Drilling/Alteration | No Violations Noted | |
2281015 | Primary Facility | 2014-06-24 | Routine/Partial Inspection | No Violations Noted | |
2309885 | Primary Facility | 2014-10-03 | Drilling/Alteration | No Violations Noted | |
2675020 | Primary Facility | 2017-12-27 | Routine/Complete Inspection | No Violations Noted | Four producing wells on site:
4H (085-24679) 5H (085-24680) 6H (085-24677) 12H (085-24681) Three other well cellars are covered by steel plates. Two double gas processing units/driers. Methanol drip tied to each wellhead. Wells are also plumbed to a spreader bar mounted on top of a 3,000 gal open-top rectangle tank (Photo #1). Bermed liner serving as secondary containment for tank. Signage, including well and operator info, and standard reflective sign with 911 address posted at gated entrance. |
2692835 | Primary Facility | 2018-02-09 | Routine/Partial Inspection | No Violations Noted | All four wells are connected to open top tank but have valves on well to tank shut. All four wells appear to be connected to the container of foaming agent. One separator unit is shared by wells 4H & 5H. Other separator unit is shared by 12H & 6H. |
2704544 | Primary Facility | 2018-03-13 | Routine/Complete Inspection | Violation(s) Noted | Four producing wells on site: 12H (085-24681), 6H (085-24677), 5H (085-24680), 4H (095-24679)
Three other well cellars are covered by plate steel. Tags are attached to tubing near each producing wellhead. Signage posted at public road near gated access. Open top roll-off tank on bermed liner is being used to collect brine/production water (Photo #1). Two double GPUs. No E&S issues noted. Site previously restored to PCSM. Post-Construction Well Site Restoration reports submitted 3/14/18. Violations noted for use of an open-top brine/production water tank. Please respond as requested below. |
2738057 | Primary Facility | 2018-06-06 | Compliance Evaluation | No Violations Noted | Compliance Evaluation Inspection to address an outstanding violation against well 4H (085-24679) for use of an open-top tank to collect/store production water (PA Code 78a.57a). Originally noted on 3/13/18 inspection (ID# 2704544). Operator has installed a fitted canvas cover correcting the violation (Photo 1.). No violations. |
2831412 | Primary Facility | 2019-01-25 | Routine/Complete Inspection | No Violations Noted | Routine inspection of site and wells. Site is snow covered. Gated and locked access road. ID signs posted. Well tags on each of four wellheads. Wells are plumbed to a roll-off tank with a cover. Gas processing units on site; no other equipment.
4H (085-24679), 5H (085-24680), 6H (085-24677), 12H (085-24681) |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2243434 | 688392 | 02/06/2014 | 2014-02-06 | OGA 3211(F2) - Failure to notify DEP 24 hours prior to cementing casing strings, pressure testing of production casing, stimulation of well or plugging of an unconventional well. | Administrative | Operator failed to make any notification to the Department prior to cementing the intermediate casing |
2704544 | 811117 | 2018-03-13 | 2018-06-06 | 78a57(a) | Environmental Health & Safety | Open top roll-off style tank is being used to collect/store production water; tank is approx. 1/2 full |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
811117 | 362521 | NOV - Notice of Violation | 2018-06-06 |
For data sources see[8]