If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-20223 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.50895,"lon":-77.96971,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Wharton Township | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: PA STATE FOREST WH-75 | |
License Status: | |
Spud Date: | |
Permit Date: 1982-02-09 | |
Well Type: STORAGE WELL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.508950 | |
Longitude: -77.969710 |
Date | Event |
---|---|
1967-04-04 | Performed Spud Operation |
1967-04-25 | Drilling Completion |
1967-04-25 | Perforation |
1968-01-01 | NEWLY DRILLED |
1980-12-03 | Drilling Completion |
1981-10-05 | REWORKED |
1982-02-09 | New Permit Application |
1982-06-30 | Drilling Completion |
1986-06-18 | New Permit Application |
1996-05-31 | Perforation |
1996-09-18 | DRILLED DEEPER |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1991 | JJ BUCHER PRODUCING CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | NATL FUEL GAS SUPPLY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | NATL FUEL GAS SUPPLY CORP | Produced Fluid | 715.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1063818 | Primary Facility | 2001-09-26 | Routine/Complete Inspection | No Violations Noted | |
1175974 | Primary Facility | 2002-10-08 | Routine/Complete Inspection | No Violations Noted | |
1275857 | Primary Facility | 2003-10-01 | Routine/Complete Inspection | No Violations Noted | |
1569921 | Primary Facility | 2006-09-26 | Routine/Complete Inspection | No Violations Noted | |
1659560 | Primary Facility | 2007-10-09 | Routine/Complete Inspection | No Violations Noted | |
1744778 | Primary Facility | 2008-10-15 | Routine/Complete Inspection | No Violations Noted | |
1852087 | Primary Facility | 2009-11-04 | Routine/Complete Inspection | No Violations Noted | |
1925631 | Primary Facility | 2010-11-03 | Routine/Complete Inspection | No Violations Noted | |
2022960 | Primary Facility | 2011-11-01 | Routine/Complete Inspection | No Violations Noted | |
2113245 | Primary Facility | 2012-10-25 | Routine/Complete Inspection | No Violations Noted | |
2227639 | Primary Facility | 2013-11-12 | Routine/Complete Inspection | No Violations Noted | |
2325572 | Primary Facility | 2014-11-04 | Routine/Complete Inspection | No Violations Noted | |
2423250 | Primary Facility | 2015-11-03 | Routine/Complete Inspection | No Violations Noted | |
2525898 | Primary Facility | 2016-09-27 | Routine/Complete Inspection | No Violations Noted | |
2649143 | Primary Facility | 2017-10-16 | Routine/Complete Inspection | No Violations Noted | |
2793377 | Primary Facility | 2018-10-09 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection the casing pressure was 0 pounds per square inch. This well was temporarily shut in at this inspection. There are two (2) annular vents on this well. No venting was noted at this inspection. No violations noted at this inspection. |
681067 | Primary Facility | 1988-09-27 | Routine/Complete Inspection | No Violations Noted | |
681068 | Primary Facility | 1989-09-26 | Routine/Complete Inspection | No Violations Noted | |
683144 | Primary Facility | 1990-10-03 | Routine/Complete Inspection | No Violations Noted | |
683793 | Primary Facility | 1991-09-25 | Routine/Complete Inspection | No Violations Noted | |
684432 | Primary Facility | 1992-09-30 | Routine/Complete Inspection | No Violations Noted | |
685091 | Primary Facility | 1993-09-29 | Routine/Complete Inspection | No Violations Noted | |
685859 | Primary Facility | 1994-10-04 | Routine/Complete Inspection | No Violations Noted | |
686468 | Primary Facility | 1995-07-06 | Routine/Complete Inspection | No Violations Noted | WELL REPAIRS |
686504 | Primary Facility | 1995-06-16 | Routine/Complete Inspection | No Violations Noted | REPAIRING 4 1/2" |
686506 | Primary Facility | 1995-06-13 | Routine/Complete Inspection | No Violations Noted | REPLACING 4 1/2 |
686513 | Primary Facility | 1995-06-29 | Routine/Complete Inspection | No Violations Noted | |
686519 | Primary Facility | 1995-06-23 | Routine/Complete Inspection | No Violations Noted | |
686538 | Primary Facility | 1995-06-02 | Drilling/Alteration | No Violations Noted | |
686610 | Primary Facility | 1995-07-18 | Routine/Complete Inspection | No Violations Noted | |
686629 | Primary Facility | 1995-07-31 | Routine/Complete Inspection | No Violations Noted | REPAIRING CASING (4 1/2) |
686665 | Primary Facility | 1995-08-29 | Routine/Complete Inspection | No Violations Noted | |
686688 | Primary Facility | 1995-09-14 | Routine/Complete Inspection | No Violations Noted | CLEANING OUT 4 1/2 |
686698 | Primary Facility | 1995-09-12 | Routine/Complete Inspection | No Violations Noted | |
686786 | Primary Facility | 1995-10-03 | Routine/Complete Inspection | No Violations Noted | |
687297 | Primary Facility | 1996-03-19 | Drilling/Alteration | No Violations Noted | |
687304 | Primary Facility | 1996-03-25 | Drilling/Alteration | No Violations Noted | |
687308 | Primary Facility | 1996-04-02 | Drilling/Alteration | No Violations Noted | |
687313 | Primary Facility | 1996-04-16 | Drilling/Alteration | No Violations Noted | |
687319 | Primary Facility | 1996-04-29 | Routine/Complete Inspection | No Violations Noted | |
687344 | Primary Facility | 1996-05-28 | Routine/Complete Inspection | No Violations Noted | |
687613 | Primary Facility | 1996-10-08 | Routine/Complete Inspection | No Violations Noted | |
688321 | Primary Facility | 1997-10-03 | Routine/Complete Inspection | No Violations Noted | |
689150 | Primary Facility | 1998-09-29 | Routine/Complete Inspection | No Violations Noted | |
689174 | Primary Facility | 1998-10-08 | Routine/Complete Inspection | No Violations Noted | |
689360 | Primary Facility | 1998-10-26 | Routine/Complete Inspection | No Violations Noted | |
689370 | Primary Facility | 1998-10-21 | Routine/Complete Inspection | No Violations Noted | |
689583 | Primary Facility | 1998-12-09 | Routine/Complete Inspection | No Violations Noted | |
689626 | Primary Facility | 1999-03-02 | Routine/Complete Inspection | No Violations Noted | |
689640 | Primary Facility | 1999-03-09 | Routine/Complete Inspection | No Violations Noted | |
689647 | Primary Facility | 1999-04-07 | Routine/Complete Inspection | No Violations Noted | |
689653 | Primary Facility | 1999-04-13 | Routine/Complete Inspection | No Violations Noted | |
689656 | Primary Facility | 1999-04-20 | Routine/Complete Inspection | No Violations Noted | |
689666 | Primary Facility | 1999-04-26 | Routine/Complete Inspection | No Violations Noted | |
689738 | Primary Facility | 1999-06-02 | Routine/Complete Inspection | No Violations Noted | |
689752 | Primary Facility | 1999-07-08 | Drilling/Alteration | No Violations Noted | |
689753 | Primary Facility | 1999-06-28 | Routine/Complete Inspection | No Violations Noted | |
689769 | Primary Facility | 1999-06-16 | Routine/Complete Inspection | No Violations Noted | |
689770 | Primary Facility | 1999-06-14 | Drilling/Alteration | No Violations Noted | |
689771 | Primary Facility | 1999-06-14 | Drilling/Alteration | No Violations Noted | |
689819 | Primary Facility | 1999-08-11 | Routine/Complete Inspection | No Violations Noted | |
689828 | Primary Facility | 1999-08-18 | Routine/Complete Inspection | No Violations Noted | |
689830 | Primary Facility | 1999-08-16 | Routine/Complete Inspection | No Violations Noted | |
689832 | Primary Facility | 1999-05-11 | Routine/Complete Inspection | No Violations Noted | |
689833 | Primary Facility | 1999-05-11 | Routine/Complete Inspection | No Violations Noted | |
810117 | Primary Facility | 1999-09-07 | Routine/Complete Inspection | No Violations Noted | |
838662 | Primary Facility | 1999-09-29 | Routine/Complete Inspection | No Violations Noted | |
894601 | Primary Facility | 1999-11-10 | Routine/Complete Inspection | Violation(s) Noted | |
897600 | Primary Facility | 1999-11-17 | Compliance Evaluation | No Violations Noted | |
898356 | Primary Facility | 1999-11-23 | Routine/Complete Inspection | No Violations Noted | |
901974 | Primary Facility | 1999-12-10 | Routine/Complete Inspection | No Violations Noted | |
903824 | Primary Facility | 1999-12-16 | Routine/Complete Inspection | No Violations Noted | |
923522 | Primary Facility | 2000-03-09 | Routine/Complete Inspection | No Violations Noted | |
952891 | Primary Facility | 2000-07-19 | Routine/Complete Inspection | No Violations Noted | |
960665 | Primary Facility | 2000-08-17 | Routine/Complete Inspection | No Violations Noted | |
972249 | Primary Facility | 2000-10-03 | Routine/Complete Inspection | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
894601 | 227089 | 11/10/1999 | 1999-11-10 | 401 CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | 750 gallon steel tank set on site and annulus of the 4" is connected to the tank. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
227089 | 47435 | NOV - Notice of Violation | Comply/Closed | 1999-11-29 |
For data sources see[7]