If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21463 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.982825,"lon":-77.738083,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Bingham Township | |
Operator Name: ROULETTE OIL & GAS LLC | |
Well Pad ID: | |
Farm/Lease Name: HAMILTON 35 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-04-22 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.982825 | |
Longitude: -77.738083 |
Date | Event |
---|---|
2008-04-22 | New Permit Application |
2008-09-20 | Performed Spud Operation |
2008-09-22 | Drilling Completion |
2014-06-06 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EAST RESOURCES MGMT LLC | 4,134.10 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | SWEPI LP | 4,134.10 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | SWEPI LP | 2,813.61 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 818.00 | 182 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | PLANTS & GOODWIN INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | PLANTS & GOODWIN INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | ROULETTE OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | ROULETTE OIL & GAS LLC | 11.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SWEPI LP | Produced Fluid | 40.90 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2013 | SWEPI LP | Produced Fluid | 28.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2013 | SWEPI LP | Produced Fluid | 28 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2137981 | Primary Facility | 2013-02-07 | Routine/Complete Inspection | No Violations Noted | |
2606660 | Primary Facility | 2017-05-24 | Routine/Complete Inspection | No Violations Noted | |
2682947 | Primary Facility | 2018-01-16 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was not in production. The wellhead assembly all fittings and flow lines were tested for gas. The results of this testing was no gas was detected on the wellhead assembly or the well area. |
2727319 | Primary Facility | 2018-05-04 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was temp. shut in. There is a gathering system with separators(4),drips(4),meters(2) and three(3) waste / production tanks all in a containment hat this well flows into when its in production. |
2856881 | Primary Facility | 2019-03-21 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection this well was an active producing well. The well is a tee (t) style fitting wellhead assembly that is approximately a 5" x 2" x 2" x 5" (sizes are diameters) in size. A hammer style fitting(a hammer is used to attach and tighten this fitting to a same size threaded fitting or pipe) is attached to the top of the wellhead and connects the wellhead to the pump jack. The hammer fitting is approximately a 5" x 2" fitting. An approximate 2" valve(shut) is connected to one side of the tee style wellhead and an approximate 2" valve (open) is connected to the other side of the tee style wellhead and is connected to a production/flow line leaving the well area and going into the ground. No violations noted at this inspection. |
For data sources see[7]