Well ID: 37-105-21538 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.658825,"lon":-77.630463,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: West Branch Township | |
Operator Name: ULTRA RESOURCES INC | |
Well Pad ID: | |
Farm/Lease Name: BROWN | |
License Status: Plugged and Abandoned | |
Spud Date: 2008-10-17 | |
Permit Date: 2008-10-06 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.658825 | |
Longitude: -77.630463 |
Date | Event |
---|---|
2008-10-06 | New Permit Application |
2008-10-14 | Performed Spud Operation |
2008-10-22 | Drilling Completion |
2010-03-29 | Fully Plugged |
2016-07-14 | Begin Plugging |
2016-08-01 | Finished Plugging |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | VICTORY ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | VICTORY ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | VICTORY ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | ULTRA RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | ULTRA RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | ULTRA RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | ULTRA RESOURCES INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1746796 | Primary Facility | 2008-10-22 | Drilling/Alteration | No Violations Noted | |
1866819 | Primary Facility | 2010-03-01 | Routine/Partial Inspection | Violation(s) Noted | E&S Plan inadequate, E&S controls inadequate, no well tag, no completion report submitted to the Department. See Insp ID 1875632 done 4/8/2010, past viols corrected/closed. |
1875632 | Primary Facility | 2010-04-08 | Compliance Evaluation | No Violations Noted | |
2398233 | Primary Facility | 2015-08-13 | Routine/Complete Inspection | No Violations Noted | |
2447810 | Primary Facility | 2016-02-02 | Routine/Complete Inspection | No Violations Noted | Routine inspection. The Brown 1 well was drilled by Victory Energy and transferred to Ultra Resources on 10/25/11. Site is permanently stabilized, although does not appear to be restored. Site should be restored as per 58 PA. C.S. §3216(a) of the Oil & Gas Act. TLT |
2501310 | Primary Facility | 2016-07-13 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2501527 | Primary Facility | 2016-07-11 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection (DEP) inspected the Ultra Resources Inc. Brown #1 site located in West Branch Twp., Potter Co. on 7/11/16 @ 1442 hours due to concerns of earth moving activity at the site without adequate BMPs.
Dan Krause, Consulting Petroleum Engineer and Rich Wilson, Project Manager were Ultra’s onsite representatives. Mr. Krause stated they were in the process of plugging the Brown 1 Well API# 105-21538, but were awaiting the proper permits to haul freshwater to the site for cementing. Mr. Krause stated they laid fresh stone on top of the pre-existing pad surface, and have not performed any earth moving activities. At the time of this inspection, new rock was observed on the pad surface. It did not appear the pad size was increased. Roll off tanks were located on containment awaiting delivery of freshwater. No temporary BMP’s were observed around the perimeter of the pad. No erosion or sedimentation was observed. Mr. Walsh was reminded in accordance with 25 Pa Code §102.4 ( |
2506015 | Primary Facility | 2016-07-18 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2506016 | Primary Facility | 2016-07-19 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2506018 | Primary Facility | 2016-07-27 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2520030 | Primary Facility | 2016-09-16 | Routine/Complete Inspection | No Violations Noted | Routine inspection. Brown 1 well has been plugged and final restoration of the well site has been completed. The well pad and access road have been reclaimed to near original grade and the site seeded and mulched. Silt sock remains in place along the down gradient side of the site. TLT |
2579857 | Primary Facility | 2017-04-05 | Site Restoration | No Violations Noted | On 4/5/17 at 1115 hrs I conducted a restoration inspection of the Brown 1 well site. It was overcast and 43 degrees F. No one was present during my inspection.
On 3/31/17, the Department received a Well Site Restoration Report (WSRR) for the Brown 1 well. The well was plugged from July - August 2016 and final site restoration was completed during the late summer. Germination at the site is uniform and last years growth is starting to turn green. The perimeter silt sock remains in place. The site signage and mailbox containing the E&S plan are still located near the site entrance. I reviewed and approved the WSRR on 4/5/17. No violations were cited during this inspection. I concluded the inspection at 1140 hrs. TLT |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1866819 | 582432 | 03/01/2010 | 2010-03-01 | 102.4INADPLN - E&S Plan not adequate | Administrative | See Insp ID 1875632 done 4/8/2010, past viols corrected/closed. |
1866819 | 582433 | 03/01/2010 | 2010-03-01 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | See Insp ID 1875632 done 4/8/2010, past viols corrected/closed. |
1866819 | 582434 | 03/01/2010 | 2010-03-01 | 201TAG - Failure to install, in a permanent manner, the permit number on a completed well | Administrative | See Insp ID 1875632 done 4/8/2010, past viols corrected/closed. |
1866819 | 582435 | 03/01/2010 | 2010-03-01 | 78.122 - Drillers Log not on site | Administrative | See Insp ID 1875632 done 4/8/2010, past viols corrected/closed. No Completion Report Submitted |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
582432 | 255706 | NOV - Notice of Violation | Comply/Closed | 2010-04-08 | |||
582433 | 255706 | NOV - Notice of Violation | Comply/Closed | 2010-04-08 | |||
582434 | 255706 | NOV - Notice of Violation | Comply/Closed | 2010-04-08 | |||
582435 | 255706 | NOV - Notice of Violation | Comply/Closed | 2010-04-08 |