37-105-21645

Well Details

Well ID: 37-105-21645
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: West Branch Township
Operator Name: TILDEN MARCELLUS LLC
Well Pad ID: 149018
Farm/Lease Name: PAUL 906 3H
License Status: Inactive
Spud Date: 2010-03-11
Permit Date: 2010-02-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.688849
Longitude: -77.661271

For data sources see[1][2][3]

Well History

Date Event
2010-02-02 New Permit Application
2010-03-11 Performed Spud Operation
2011-03-07 Drilling Completion
2011-05-11 Perforation
2012-01-11 DEVIATED
2019-01-16 Inactive Well Request Granted

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-05-15 2011-05-15 6,443 2,978,425

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 J609 Schlumberger Friction Reducer Ammonium sulfate 7783-20-2 30.00 0.03
A264 Corrosion Inhibitor Schlumberger Corrosion Inhibitor Methanol 67-56-1 40.00 0.00012800
Aliphatic acids 30.00 0.00009600
Propargyl alcohol 107-19-7 10.00 0.00003200
Aliphatic alcohols, ethoxylated #1 30.00 0.00009600
Scale Inhibitor B317 Schlumberger Scale Inhibitor Trisodium phosphate 7601-54-9 5.00 0.00072000
Ethylene glycol 107-21-1 5.00 0.00072000
L058 Schlumberger Iron Control Sodium erythorbate 6381-77-7 100.00 0.00020600
Sand Schlumberger Proppant Quartz 14808-60-7 100.00 14.49
Water 100.00 85.16
BioRid 20L Tetra Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00272300
Sodium bromide 7647-15-6 15.00 0.00204200
15 HCl Schlumberger Acid Hydrochloric Acid 15.00 0.05
Gelling Agent J580 Schlumberger Gelling Agent Carbohydrate polymer 100.00 0.00944100
J218 Breaker Schlumberger Breaker Peroxydisulfuric acid, diammonium salt 7727-54-0 100.00 0.00162500

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ULTRA RESOURCES INC 0.00 0 0.00 0 0.00 0
2011 ULTRA RESOURCES INC 110,740.00 195 0.00 0 0.00 0
2012 ULTRA RESOURCES INC 135,540.00 358 0.00 0 0.00 0
2013 ULTRA RESOURCES INC 111,063.00 353 0.00 0 0.00 0
2014 SWEPI LP 89,089.61 321 0.00 0 0.00 0
2015 SWEPI LP 62,182.34 153 0.00 0 0.00 0
2016 SWEPI LP 59,988.91 233 0.00 0 0.00 0
2017 SWEPI LP 23,449.53 82 0.00 0 0.00 0
2019 SWEPI LP 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 ULTRA RESOURCES INC Produced Fluid 606.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 ULTRA RESOURCES INC Produced Fluid 1,401.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2013 ULTRA RESOURCES INC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 ULTRA RESOURCES INC Produced Fluid 1,012.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 SWEPI LP Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 SWEPI LP Produced Fluid 1,819.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWEPI LP Produced Fluid 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 SWEPI LP Produced Fluid 499.99 Bbl REUSE (AT WELL PAD)
2018 SWEPI LP Produced Fluid 100.00 Bbl REUSE (AT WELL PAD)
2018 SWEPI LP Servicing Fluid 211.66 Bbl LANDFILL 301358
2018 SWEPI LP Produced Fluid 1.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1864677 Primary Facility 2010-02-22 Routine/Partial Inspection De minimus Violations Noted Site under construction noted minor temporary E&S control BMP violations
1869835 Primary Facility 2010-03-15 Routine/Partial Inspection De minimus Violations Noted
1876504 Primary Facility 2010-04-13 Routine/Partial Inspection No Violations Noted
1949307 Primary Facility 2011-02-11 Routine/Partial Inspection No Violations Noted
1952104 Primary Facility 2011-02-24 Drilling/Alteration No Violations Noted
1954150 Primary Facility 2011-02-28 Routine/Partial Inspection No Violations Noted
1967123 Primary Facility 2011-04-20 Routine/Partial Inspection Violation(s) Noted Cuttings and caked up drilling mud around well cellar, RCE needs repaired, E&S inspection overdue
1969790 Primary Facility 2011-05-02 Follow-up Inspection No Violations Noted
1989461 Primary Facility 2011-07-21 Routine/Complete Inspection No Violations Noted
2007876 Primary Facility 2011-10-04 Routine/Complete Inspection No Violations Noted
2051258 Primary Facility 2012-03-13 Routine/Complete Inspection Pending A routine inspection was conducted at the Paul B 901 pad on March 13, 2012. The 3H well is drilled and the 6H has been spudded. AMEC conducted an inspection sometime between March 5 and March 12, 2012, the actual inspection date was not specified on the inspection report. The site ID sign was present, well drilling permits posted and the Erosion and Sedimentation (E&S) control plan was on site. All E&S BMPs were established and maintained. The fill slopes on the back of the pad will need to be monitored to ensure perennial vegetation is established to reduce the potential for accelerated erosion. A small puddle was observed near the steps to the production tank containment. The puddle exhibited elevated reading for specific conductance. A soil sample was collected and submitted for analysis. Violations may be cited pending the results of the sample. The area should be screened to determine the extent of the release and a plan to remediate the area should be submitted to the Department. - MRN
2058842 Primary Facility 2012-04-12 Follow-up Inspection Pending A follow up inspection was conducted at the Paul 906 pad on April 12, 2012. During a previous inspection conducted on March 13, 2012 (2051258) a small puddle was observed near the steps to the production tank containment. The puddle exhibited elevated reading for specific conductance. The n area has been excavated and soil samples collected by Ultra and submitted for analysis. During today's inspection, a puddle in the excavated area was screened with the conductivity fieled meter and a reading of 4.64µS was found. A reading of the fluid inside the secondary containment was taken and was found to be 7.28µS. Violations will remain pending at this time. No new violations were cited during this inspection. - MRN
2062519 Primary Facility 2012-04-26 Follow-up Inspection Pending An inspection was conducted at the Paul pad on April 26, 2012 at approximately 1345 to follow -up on the clean-up of a release discovered on March 13, 2012. During the inspection conducted on March 13, 2012 (2051258) a small puddle was observed near the steps to the production tank containment. The puddle exhibited elevated reading for specific conductance. The area has been excavated and soil samples collected by Ultra and submitted for analysis. During an inspection conducted on April 12, 2012 a puddle in the excavated area was screened with the conductivity field meter and a reading of 4.64µS was found. The results of the soil samples collected by Ultra indicated the presence of chloride at a level of 1,600mg/kg. On April 26, the day of this inspection, the area was excavated further and screened by AMEC using a conductivity probe. AMEC and DEP then collected soils samples from the bottom of the excavation area. - MRN
2064705 Primary Facility 2012-04-17 Routine/Complete Inspection No Violations Noted
2153159 Primary Facility 2013-04-01 Routine/Partial Inspection No Violations Noted An inspection of the Paul 906 pad in West Branch Township, Potter County was conducted on April 1, 2013. There are six drill permits associated with this site. The 3H and 4H wells are on active status, the 1H, 2H and 5H wells have been reported not drilled by the operator and the 6H well has been placed on Regulatory Inactive Status. The 3H well is the only well in production. The pad was partially snow covered at the time of this inspection. What could be seen was either well vegetated or stabilized with stone. No puddles exhibiting elevated conductivity or erosion issues were observed at this time. No violations were cited during this inspection.
2447005 Primary Facility 2016-02-02 Routine/Complete Inspection No Violations Noted Routine inspection. The 3H well is in production. The 6H well has been topholed and is on inactive status. Both wells were tagged. The impoundment contains water, which was frozen, and was near capacity. Recommended that the impoundment be pumped down to increase freeboard. The site is permanently stabilized, although is not restored. SWEPI intends to submit an extension request for the restoration requirements in 2016. TLT
2461487 Primary Facility 2016-03-01 Routine/Complete Inspection No Violations Noted
2478506 Primary Facility 2016-04-22 Routine/Partial Inspection No Violations Noted Partial inspection. Site has recently been reclaimed. Post construction stormwater management BMPs have been installed and disturbed areas temporarily stabilized. TLT
2533017 Primary Facility 2016-10-28 Site Restoration No Violations Noted Restoration inspection. Notice of Termination (NOT) and Well Site Restoration Reports (WSRRs) received on 10/19/16. Interim restoration of the well site was completed in April 2016 and included installation of infiltration berms beyond the north corner of the well pad. The site is permanently stabilized as per 25 Pa Code §102.22(a)(2), temporary E&S controls have been removed and post-construction stormwater management BMP’s are in place. Recommend approval of the NOT. The WSRRs were acknowledged on 10/28/16. TLT
2576281 Primary Facility 2017-03-28 Routine/Complete Inspection No Violations Noted
2587157 Primary Facility 2017-04-26 Routine/Partial Inspection No Violations Noted The well pad area has been minimized and impervious area reduced. Post construction best management practices are installed and functional no staining or puddles or found at the pad surface
2684740 Primary Facility 2018-01-17 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was shut in with a lockout tag out in place as of 9-13-17 for undetermined reasons. The wellhead assembly all fittings and flow lines were tested for gas. Results of this testing was no gas was detected on the wellhead assembly or the well area.
2748886 Primary Facility 2018-07-05 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the Marshlands Play-Paul 906 pad located in Westbranch Township, Potter County. The weather is 76°, mostly cloudy, humidity 86%, winds S at 8 mph. No activity was observed onsite. This site has had interim restoration completed. The pad size has been shrunken down and vegetation is growing. PCSM BMP's were installed in April 2016. Due to recent heavy rains standing water was observed on the pad surface. No violations were noted. I departed the site at 1215 hrs.
2773880 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was not producing. The valves on the 2" production line leaving the wellhead assembly were in the shut position. A gauge on the production line showed 0 psi (pounds per square inch). Four (4) more valves on the production line going into the production equipment on site all showed 0 psi. also. No violations were noted at this inspection.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1967123 609219 04/20/2011 2011-04-20 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1967123 609220 04/20/2011 2011-04-20 102.4NOPLAN - No E&S plan developed, plan not on site Administrative 102.4(b)(8)
1967123 609221 04/20/2011 2011-04-20 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. Administrative 78.56(a)
1967123 609222 04/20/2011 2011-04-20 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety
1967123 609223 04/20/2011 2011-04-20 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety

For data sources see[8]