37-105-21648

Well Details

Well ID: 37-105-21648
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: West Branch Township
Operator Name: TILDEN MARCELLUS LLC
Well Pad ID: 149018
Farm/Lease Name: PAUL 906 6H
License Status: Plugged and Abandoned
Spud Date: 2011-01-13
Permit Date: 2010-02-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.689044
Longitude: -77.661497

For data sources see[1][2][3]

Well History

Date Event
2010-02-02 New Permit Application
2011-01-13 Performed Spud Operation
2011-01-26 Drilling Completion
2017-10-16 Begin Plugging
2017-10-20 Finished Plugging
2017-12-12 Newly Drilled

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ULTRA RESOURCES INC 0.00 0 0.00 0 0.00 0
2011 ULTRA RESOURCES INC 0.00 0 0.00 0 0.00 0
2012 ULTRA RESOURCES INC 0.00 0 0.00 0 0.00 0
2013 ULTRA RESOURCES INC 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 0.00 0 0.00 0 0.00 0
2015 SWEPI LP 0.00 0 0.00 0 0.00 0
2016 SWEPI LP 0.00 0 0.00 0 0.00 0
2017 SWEPI LP 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SWEPI LP Produced Fluid 100.00 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1944258 Primary Facility 2011-01-18 Drilling/Alteration No Violations Noted
1944262 Primary Facility 2011-01-20 Drilling/Alteration No Violations Noted
1949308 Primary Facility 2011-02-11 Routine/Partial Inspection No Violations Noted
1954151 Primary Facility 2011-02-28 Routine/Partial Inspection No Violations Noted
1967126 Primary Facility 2011-04-20 Routine/Partial Inspection No Violations Noted
1969795 Primary Facility 2011-05-02 Routine/Partial Inspection No Violations Noted
2007879 Primary Facility 2011-10-04 Routine/Complete Inspection No Violations Noted
2051480 Primary Facility 2012-03-13 Routine/Complete Inspection No Violations Noted A routine inspection was conducted at the Paul B 901 pad on March 13, 2012. The 3H well is drilled and the 6H has been spudded. AMEC conducted an inspection sometime between March 5 and March 12, 2012, the actual inspection date was not specified on the inspection report. The site ID sign was present, well drilling permits posted and the Erosion and Sedimentation (E&S) control plan was on site. All E&S BMPs were established and maintained. The fill slopes on the back of the pad will need to be monitored to ensure perennial vegetation is established to reduce the potential for accelerated erosion. A small puddle was observed near the steps to the production tank containment. The puddle exhibited elevated reading for specific conductance. A soil sample was collected and submitted for analysis. Violations may be cited pending the results of the sample. The area should be screened to determine the extent of the release and a plan to remediate the area should be submitted to the Department. - MRN
2064703 Primary Facility 2012-04-17 Routine/Complete Inspection No Violations Noted
2153162 Primary Facility 2013-04-01 Routine/Partial Inspection No Violations Noted
2447006 Primary Facility 2016-02-02 Routine/Complete Inspection No Violations Noted Routine inspection. The 3H well is in production. The 6H well has been topholed and is on inactive status. Both wells were tagged. The impoundment contains water, which was frozen, and was near capacity. Recommended that the impoundment be pumped down to increase freeboard. The site is permanently stabilized, although is not restored. SWEPI intends to submit an extension request for the restoration requirements in 2016. TLT
2478507 Primary Facility 2016-04-22 Routine/Partial Inspection No Violations Noted Partial inspection. Site has recently been reclaimed. Post construction stormwater management BMPs have been installed and disturbed areas temporarily stabilized. TLT
2533018 Primary Facility 2016-10-28 Site Restoration No Violations Noted Restoration inspection. Notice of Termination (NOT) and Well Site Restoration Reports (WSRRs) received on 10/19/16. Interim restoration of the well site was completed in April 2016 and included installation of infiltration berms beyond the north corner of the well pad. The site is permanently stabilized as per 25 Pa Code §102.22(a)(2), temporary E&S controls have been removed and post-construction stormwater management BMP’s are in place. Recommend approval of the NOT. The WSRRs were acknowledged on 10/28/16. TLT

Restoration inspection. Notice of Termination (NOT) and Well Site Restoration Reports (WSRRs) received on 10/19/16. Interim restoration of the well site was completed in April 2016 and included installation of infiltration berms beyond the north corner of the well pad. The site is permanently stabilized as per 25 Pa Code §102.22(a)(2), temporary E&S controls have been removed and post-construction stormwater management BMP’s are in place. Recommend approval of the NOT. The WSRRs were acknowled

2576285 Primary Facility 2017-03-28 Routine/Complete Inspection No Violations Noted
2587154 Primary Facility 2017-04-26 Routine/Partial Inspection No Violations Noted The well pad area has been minimized and impervious area reduced. Post construction best management practices are installed and functional no staining or puddles or found at the pad surface
2649104 Primary Facility 2017-10-18 Plugging(Includes Plugged/Mined Through) No Violations Noted Rig on location for P&A. I spoke with the companyman to discuss operations on the pad. Well was never completed, no pressure. Crew just finished balancing cement plug across intermediate csg shoe, will set another across surface shoe (in intermediate csg). No obvious issues observed
2652086 Primary Facility 2017-10-25 Plugging(Includes Plugged/Mined Through) No Violations Noted Routine inspection of a recently plugged well. The rig is off location following plug and abandonment. The well is cut, capped and buried in cellar. No gas was detected with altair 5x gas meter above the well at ground level. There were no obvious issues or concerns observed.
2659855 Primary Facility 2017-11-14 Administrative/File Review No Violations Noted November 14, 2017: Certificate of Well Plugging for the Paul 906 6H (105-21648) has been received, reviewed, signed, and sent to file.
2748888 Primary Facility 2018-07-05 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the Marshlands Play-Paul 906 pad located in Westbranch Township, Potter County. The weather is 76°, mostly cloudy, humidity 86%, winds S at 8 mph. No activity was observed onsite. This site has had interim restoration completed. The pad size has been shrunken down and vegetation is growing. PCSM BMP's were installed in April 2016. Due to recent heavy rains standing water was observed on the pad surface. No violations were noted. I departed the site at 1215 hrs.

For data sources see[7]