If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21850 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.717201,"lon":-77.899922,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Summit Township | |
Operator Name: JKLM ENERGY LLC | |
Well Pad ID: 149395 | |
Farm/Lease Name: SWEDEN VALLEY 102 3HU | |
License Status: | |
Spud Date: | |
Permit Date: 2015-05-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.717201 | |
Longitude: -77.899922 |
Date | Event |
---|---|
2015-05-14 | New Permit Application |
2015-06-02 | Performed Spud Operation |
2015-08-25 | Drilling Completion |
2015-09-20 | Perforation |
2016-01-15 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-19 | 2015-09-27 | 11,586 | 8,054,810 | 0 |
2 | 2015-09-19 | 2015-09-27 | 11,586 | 7,000,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor, LSI-20 | Trican | Scale Inhibitor | Organic Phosphonic Acid Salts | Proprietary | 20 | 0.00344766 | 2625.12 |
Methanol | 67-56-1 | 15 | 0.00258574 | 1968.84 | ||||
Sand (Proppant) | Trican | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 10.6168 | 8,083,880.0 | |
Iron Control, FEAC-20 | Trican | Iron Control | Acetic acid | 64-19-7 | 45 | 0.00207179 | 1577.51 | |
Citric acid | 77-92-9 | 30 | 0.00138119 | 1051.67 | ||||
Friction Reducer, FR-20 | Trican | Friction Reducer | Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00154964 | 1179.93 | |
Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 20 | 0.0154964 | 11799.3 | ||||
9-Octadecenamide,N,N-bis(2-hydroxyethyl)-, (9Z) | 93-83-4 | 2 | 0.00154964 | 1179.93 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.000774821 | 589.965 | ||||
Ethanaminium, N,N,N-trimethyl-2-[(1-oxo-2-propenyl)oxy]-, chloride, polymer with 2-propenamide |
69418-26-4 | 30 | 0.0232446 | 17698.9 | ||||
Water | Baker Hughes | Carrier | Water | 7732-18-5 | 100 | 99.9993 | 67,952,200.0 | |
Water | 7732-18-5 | 100 | 88.2789 | 67,217,400.0 | ||||
Chlorine Dioxide | Baker Hughes | Biocide | Chlorine Dioxide | 10049-04-4 | 0.3 | 0.000674937 | 458.637 | |
Hydrochloric Acid (28%) | Trican | Acidizing | Water | 7732-18-5 | 72 | 0.00259078 | 1972.68 | |
Hydrochloric Acid | 7647-01-0 | 28 | 0.00100753 | 767.153 | ||||
Acid Inhibitor, AI-11 | Trican | Acid Inhibitor | Potassium Iodide | 7681-11-0 | 5 | 0.00009754 | 74.271 | |
Propargyl alcohol derivative | Proprietary | 60 | 0.0011705 | 891.246 | ||||
Prop-2-yn-1-ol | 107-19-7 | 1 | 0.00001951 | 14.854 | ||||
Water | JKLM | Carrier/Base Fluid | ||||||
Hydrochloric Acid (7.5%) | Trican | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0749575 | 57074.2 | |
Water | 7732-18-5 | 92.5 | 0.924476 | 703915 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | JKLM ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | JKLM ENERGY LLC | 3,010,803.32 | 351 | 0.00 | 0 | 0.00 | 0 |
2017 | JKLM ENERGY LLC | 1,258,114.44 | 359 | 0.00 | 0 | 0.00 | 0 |
2018 | JKLM ENERGY LLC | 801,493.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2019 | JKLM ENERGY LLC | 45,080.00 | 24 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | JKLM ENERGY LLC | Drilling Fluid Waste | 2,200.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015 | JKLM ENERGY LLC | Fracturing Fluid Waste | 5.70 Tons | LANDFILL | 301358 |
2015 | JKLM ENERGY LLC | Drill Cuttings | 2,358.60 Tons | LANDFILL | 301358 |
2015 | JKLM ENERGY LLC | Drilling Fluid Waste | 5,310.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | JKLM ENERGY LLC | Drilling Fluid Waste | 2,200.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2015 | JKLM ENERGY LLC | Fracing Fluid Waste | 5,720.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 3192 |
2015 | JKLM ENERGY LLC | Drilling Fluid Waste | 49.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR097R017 |
2015 | JKLM ENERGY LLC | Basic Sediment | 1,200.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | JKLM ENERGY LLC | Drill Cuttings | 1,321.83 Tons | LANDFILL | NY # 02S17 |
2015 | JKLM ENERGY LLC | General O&G waste not covered by other waste types | 99.52 Tons | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR097R017 |
2015 | JKLM ENERGY LLC | Fracing Fluid Waste | 1,080.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24078 |
2015 | JKLM ENERGY LLC | Fracing Fluid Waste | 26,610.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | JKLM ENERGY LLC | Produced Fluid | 14,095.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | JKLM ENERGY LLC | Soil Contaminated by Oil & Gas Related Spills | 15.72 Tons | LANDFILL | 301358 |
2016 | JKLM ENERGY LLC | Drilling Fluid Waste | 1,940.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2016 | JKLM ENERGY LLC | Produced Fluid | 345.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2016 | JKLM ENERGY LLC | Fracturing Fluid Waste | 4,520.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | JKLM ENERGY LLC | Produced Fluid | 815.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | JKLM ENERGY LLC | Produced Fluid | 7,240.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2016 | JKLM ENERGY LLC | Produced Fluid | 955.74 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2016 | JKLM ENERGY LLC | Produced Fluid | 7,240.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2016 | JKLM ENERGY LLC | Drilling Fluid Waste | 1,940.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2016 | JKLM ENERGY LLC | Soil Contaminated by Oil | 15.72 Tons | LANDFILL | 301358 |
2016 | JKLM ENERGY LLC | Drilling Fluid Waste | 7,085.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | JKLM ENERGY LLC | Produced Fluid | 955.74 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2016 | JKLM ENERGY LLC | Produced Fluid | 46,348.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 755.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | JKLM ENERGY LLC | Produced Fluid | 8,225.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 1,145.00 Bbl | REUSE (AT WELL PAD) | |
2017 | JKLM ENERGY LLC | Produced Fluid | 5,560.00 Bbl | REUSE (AT WELL PAD) | |
2017 | JKLM ENERGY LLC | Produced Fluid | 3,885.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | JKLM ENERGY LLC | Produced Fluid | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | JKLM ENERGY LLC | Drilling Fluid Waste | 77.00 Bbl | REUSE (AT WELL PAD) | |
2017 | JKLM ENERGY LLC | Synthetic Liner Materials | 8.00 Tons | LANDFILL | 301358 |
2018 | JKLM ENERGY LLC | Synthetic Liner Materials | 3.94 Tons | LANDFILL | 301358 |
2018 | JKLM ENERGY LLC | Produced Fluid | 103.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | JKLM ENERGY LLC | Produced Fluid | 2,814.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | JKLM ENERGY LLC | Other Oil & Gas Wastes | 460.00 Bbl | REUSE (AT WELL PAD) | |
2018 | JKLM ENERGY LLC | Produced Fluid | 1,179.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | JKLM ENERGY LLC | Produced Fluid | 1,937.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | JKLM ENERGY LLC | Produced Fluid | 234.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | JKLM ENERGY LLC | Produced Fluid | 4,141.00 Bbl | REUSE (AT WELL PAD) | |
2018 | JKLM ENERGY LLC | Produced Fluid | 245.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | JKLM ENERGY LLC | Produced Fluid | 1,225.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2019 | JKLM ENERGY LLC | Synthetic Liner Materials | 15.13 Tons | LANDFILL | 301358 |
2019 | JKLM ENERGY LLC | Produced Fluid | 220.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC038 |
2019 | JKLM ENERGY LLC | Produced Fluid | 2,960.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | JKLM ENERGY LLC | Produced Fluid | 990.00 Bbl | REUSE (AT WELL PAD) | |
2019 | JKLM ENERGY LLC | Produced Fluid | 1,938.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2375252 | Primary Facility | 2015-06-02 | Preoperation Inspection | No Violations Noted | Preop inspection at Sweden Valley 102 pad. Pad has been expanded. Construction/stabilization work nearly complete. Perimeter controls installed and majority of disturbed areas stabilized. Anticipate spudding of 3HU well on 6/2/15. TLT |
2377498 | Primary Facility | 2015-06-09 | Routine/Complete Inspection | Violation(s) Noted | |
2386000 | Primary Facility | 2015-06-29 | Incident- Response to Accident or Event | Violation(s) Noted | Incident inspection to document release of an estimated 275 gallons of phosphonic acid. Release occurred when a tote of anti-corrosion agent was punctured. Release cleanup and mitigation was initiated shortly after the release was discovered. TLT |
2392130 | Primary Facility | 2015-07-13 | Incident- Response to Accident or Event | Violation(s) Noted | Inspection to document 63 gal calcium chloride release reported 7/7/15, which had been cleaned up. While on site, evidence of a new release was observed along the east side of the pad. Multiple damp areas on pad surface immediately adjacent to the containment. Containment nearly full with high conductivity fluid. Two samples collected. Sample results confirm pollutional substance on pad surface. TLT |
2392957 | Primary Facility | 2015-07-23 | Routine/Complete Inspection | No Violations Noted | |
2413444 | Primary Facility | 2015-10-02 | Routine/Complete Inspection | No Violations Noted | |
2418192 | Primary Facility | 2015-10-14 | Routine/Complete Inspection | No Violations Noted | |
2425145 | Primary Facility | 2015-11-09 | Administrative/File Review | No Violations Noted | 11/9/15 - The DEP has received the Site Characterization Action Completion report regarding the releases at the Sweden Valley Pad 102 (105-21850). The review will be conductance in accordance with the Alternativer Remdiation provision of the department policy document 800-5000-001 - Addressing Spills and Releases at Oil and Gas Well Sites or Access Roads. |
2440848 | Primary Facility | 2015-12-31 | Administrative/File Review | No Violations Noted | The DEP has reviewed the 11/2/15 document titled "Combination Site Characterization Report and Remedial Action Plan" submitted for this site in accordance with the Alternative Remediation provision of the department policy document 800-5000-001 Addressing Spills and Releases at Oil and Gas Well Sites and Access Roads; no technical deficiencies were noted. |
2442638 | Primary Facility | 2016-01-19 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Inspection to follow up on the 6/27/15 phosphonic acid spill and the 7/13/15 brine release. Areas where soil was excavated in association with the releases were observed. The site was snow covered and ground was frozen. No new violations were cited. The spill violations remain outstanding and will be resolved upon receipt and review of the Remedial Action Completion Reports. TLT |
2443706 | Primary Facility | 2016-01-06 | Routine/Complete Inspection | No Violations Noted | |
2449099 | Primary Facility | 2016-02-03 | Routine/Complete Inspection | No Violations Noted | |
2473928 | Primary Facility | 2016-04-08 | Follow-up Inspection | Pending | Inspection to follow up on the 6/29/15 and 7/13/15 outstanding violations. These violations will be resolved upon receipt and review of the Remedial Action Completion Report. Site snow covered during inspection. A damp area was noted near some production equipment. Soil and standing water screened for conductivity. Conductivity readings were elevated. A sample was collected from the standing water. Additional violations may be cited pending the sample results. TLT |
2481726 | Primary Facility | 2016-05-05 | Routine/Complete Inspection | No Violations Noted | |
2483765 | Primary Facility | 2016-05-10 | Administrative/File Review | Outstanding Violations - Viols Req'd | Admin inspection to review the Site Inspection and Soil Sampling Report provided by JKLM. Report summarizes JKLM's investigation of an area that exhibited elevated soil/water conductivity, as found during DEP's 4/8/16 inspection. Based upon the results of DEP's sample collected on 4/8/16, a violation is cited against the 3HU well. The violation is immediately corrected as JKLM recovered the water as soon as being made aware. The 6/29/15 and 7/13/15 violations against the 3HU remain outstanding and will be resolved upon receipt and review of the Remedial Action Completion Reports. TLT |
2488575 | Primary Facility | 2016-05-25 | Administrative/File Review | No Violations Noted | The DEP has reviewed the 5/16/16 “Remedial Action Completion Report” for the JKLM – Sweden Valley Pad 102 site located in Summit Township, Potter Co. The plan was reviewed in accordance with the Alternative Remediation provision of the DEP policy document 800-5000-011 Addressing Spills and Releases at Oil and Gas Well Sites and Access Roads; no technical deficiencies were noted. Response Actions conducted under the Alternative Remediation provision do not qualify for the relief of environmental liability provided by the Land Recycling and Environmental Remediation Standards Act. |
2493891 | Primary Facility | 2016-06-10 | Compliance Evaluation | No Violations Noted | Compliance evaluation inspection to verify that the 6/29/15 and 7/13/15 outstanding violations could be resolved. Inspection also to follow up on remedial actions completed in response to 4/8/16 inspection. Alternative Remediation Report for phoshonic acid and brine releases was approved by the DEP Environmental Cleanup and Brownfields Program on 5/25/16. Summary report documenting cleanup and confirmation sampling for area adjacent to glycol unit (associated with the 4/8/16 inspection) reviewed on 6/10/16 with no deficiencies noted. Outstanding violations have been resolved. TLT |
2509728 | Primary Facility | 2016-08-09 | Routine/Complete Inspection | No Violations Noted | |
2595701 | Primary Facility | 2017-05-15 | Routine/Complete Inspection | No Violations Noted | |
2676441 | Primary Facility | 2017-12-28 | Routine/Complete Inspection | No Violations Noted | A routine inspection of the JKLM Sweden Valley 102 well pad was conducted on 12/28/2017 @1130 hours. Present were myself and Jason Logsdon, JKLM pipeline Supervisor. The weather was 8 degrees and partly sunny. This inspection was completed during a tour of JKLM's activity in the Sweden Valley area between 1100 hours and 1500 hours.
No violations are noted at this time. |
2819850 | Primary Facility | 2019-04-02 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection conducted a routine inspection of the JKLM Sweden Valley 102 well pad located in Summitt Twp, Potter Co on 4/2/2019 @1115 hours. The weather was 42 degrees, overcast, winds S 14mph, humidity 30%. Onsite activity consists of a work-over rig and contractor, Deep Well Services fishing out the 2 3/8" pipe in the process of cleaning out and redrilling the 3H well. Scott West, JKLM was present onsite for the inspection.
Multiple issues were observed during the inspection and reported to onsite personnel. These issues were being corrected when i departed the site. No violations are noted at this time. I departed the site @1320 hours. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2377498 | 725183 | 06/09/2015 | 2015-06-09 | 78.55(a) - CONTROL AND DISPOSAL PLANNING - Operator failed to prepare and implement a plan under 25 Pa. Code Section 91.34 for the control and disposal of fluids, residual waste and drill cuttings, including tophole water, brines, drilling fluids, ad | Administrative | PPC plan not submitted to the Department prior to generation of waste |
2377498 | 725185 | 06/09/2015 | 2015-06-09 | 78.55(f)5v - EMERGENCY RESPONSE FOR UNCONVENTIONAL WELL SITES - Failure of the unconventional well operator to submit a copy of the emergency response plan and subsequent updates to PEMA, the Department, county emergency agency and the Public Safety | Administrative | Operator has not submitted either a company-wide or site-specific ER Plan |
2386000 | 727372 | 06/29/2015 | 2015-06-29 | CSL 402(b) - POTENTIAL POLLUTION - Conducting an activity regulated by a permit issued pursuant to Section 402 of The Clean Streams Law to prevent the potential of pollution to waters of the Commonwealth without a permit or contrary to a permit issue | Environmental Health & Safety | CSL 402. An estimated 275 gallons of phosphonic acid was released when a tote of anti-corrosion agent was punctured. The acid was released into containment. The containment was breached due to a hole, which was discovered during the spill response. Steady rain on 6/27/15 mobilized the phosphonic ac |
2386000 | 727373 | 06/29/2015 | 2015-06-29 | OGA3218.2(A) - Failure to design and construct unconventional well site to prevent spills to the ground surface and off well site. | Environmental Health & Safety | An estimated 275 gallons of phosphonic acid was released when a tote of anti-corrosion agent was punctured. The acid was released into containment. The containment was breached due to a hole, which was discovered during the spill response. Steady rain on 6/27/15 mobilized the phosphonic acid causin |
2392130 | 730453 | 07/13/2015 | 2015-07-13 | CSL 402(b) - POTENTIAL POLLUTION - Conducting an activity regulated by a permit issued pursuant to Section 402 of The Clean Streams Law to prevent the potential of pollution to waters of the Commonwealth without a permit or contrary to a permit issue | Environmental Health & Safety | CSL 402 for the potential to pollute Waters of the Commonwealth. Purpose of the inspection was to document a 63 gal calcium chloride release reported 7/7/15, which had been cleaned up. While on site, evidence of a new release was observed along the east side of the pad. Observed multiple damp areas |
2392130 | 730454 | 07/13/2015 | 2015-07-13 | 78.54 - GENERAL REQUIREMENTS - Operator failed to control and dispose of fluids, residual waste and drill cuttings, including tophole water, brines, drilling fluids, drilling muds, stimulation fluids, well servicing fluids, oil, and production fluids | Environmental Health & Safety | 78.54 for failure to control and dispose of fluids, residual waste and drill cuttings, including tophole water, brines, drilling fluids, drilling muds, stimluation fluids, well servicing fluids, oil, and production fluids in a manner that prevents pollution of the Waters of the Commonwealth. Purpos |
2392130 | 730455 | 07/13/2015 | 2015-07-13 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | SWMA 301 for failure to properly store, transport, process or dispose of a residual waste. Purpose of the inspection was to document a 63 gal calcium chloride release reported 7/7/15, which had been cleaned up. While on site, evidence of a new release was observed along the east side of the pad. Obs |
2392130 | 730456 | 07/13/2015 | 2015-07-13 | OGA3218.2(A) - Failure to design and construct unconventional well site to prevent spills to the ground surface and off well site. | Environmental Health & Safety | OGA 3218.2(a). Failure to design and construct unconventional well site to prevent spills to the ground surface and off well site. The containment was not suffieciently impervious and able to contain the spilled material. Purpose of the inspection was to document a 63 gal calcium chloride release re |
2483765 | 759168 | 2016-05-10 | 2016-05-10 | CSL 402(b) | Environmental Health & Safety | 35 P.S. 691.402(b) for causing or allowing an unpermitted discharge with the potential to pollute Waters of the Commonwealth. An area was observed adjacent to a glycol unit that exhibited elevated soil conductivity. Ponded water was also screened for conductivity and a sample collected. Sample resul |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
725183 | 324924 | NOV - Notice of Violation | Comply/Closed | 2015-07-02 | |||
725185 | 324924 | NOV - Notice of Violation | Comply/Closed | 2015-07-02 | |||
727372 | 325308 | NOV - Notice of Violation | |||||
727373 | 325308 | NOV - Notice of Violation | |||||
730453 | 327703 | NOV - Notice of Violation | |||||
730454 | 327703 | NOV - Notice of Violation | |||||
730455 | 327703 | NOV - Notice of Violation | |||||
730456 | 327703 | NOV - Notice of Violation |
For data sources see[8]