X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-105-21869

Well Details

Well ID: 37-105-21869
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Eulalia Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 153811
Farm/Lease Name: REESE HOLLOW 115 1HU
License Status:
Spud Date:
Permit Date: 2016-08-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.798042
Longitude: -77.976973

For data sources see[1][2][3]

Well History

Date Event
2016-08-05 New Permit Application
2016-09-22 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-04 2017-12-16 10,869 9,595,820 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KAI-12 Keane Acid Inhibitor Fatty imidazoline 61790-69-0 5 0.00008073 75.03
ethylbenzene 100-41-4 1 0.00001615 15.006
isoproyl alcohol 67-63-0 5 0.00008073 75.03
Methanol 67-56-1 90 0.00145316 1350.54
prop-2-yn-1-ol 107-19-7 5 0.00008073 75.03
xylene 1330-20-7 5 0.00008073 75.03
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00008073 75.03
Water JKLM Carrier/Base Fluid Water 7732-18-5 100 86.162 80,077,200.0
Hydrochloric Acid (7.5%) Keane Acid Inhibitor Hydrochloric Acid 7647-01-0 7.5 0.0572911 53245.1
Water 7732-18-5 92.5 0.70659 656689
Other Chemical(s) Listed Above See Trade Name(s) List Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00155186 1442.27
Fatty imidazoline 61790-69-0 5 0.00008073 75.03
copolymer of 2-propenamide 69418-26-4 20 0.0155186 14422.7
oleic acid diethanolamide 93-83-4 2 0.00155186 1442.27
xylene 1330-20-7 5 0.00008073 75.03
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00008073 75.03
Citric acid 77-92-9 30 0.000933864 867.913
ethylbenzene 100-41-4 1 0.00001615 15.006
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0155186 14422.7
Water 7732-18-5 92.5 0.70659 656689
isoproyl alcohol 67-63-0 5 0.00008073 75.03
prop-2-yn-1-ol 107-19-7 5 0.00008073 75.03
Polyurethane Resin 57029-46-6 2 0 0
Water 7732-18-5 85 0 0
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.9918 12,074,300.0
KFEAC-30 Keane Iron Control Acetic acid 64-19-7 5 0.000155644 144.652
Citric acid 77-92-9 30 0.000933864 867.913
KFR-23 Keane Friction Reducer Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00155186 1442.27
copolymer of 2-propenamide 69418-26-4 20 0.0155186 14422.7
Water 7732-18-5 50 0.0387965 36056.7
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0155186 14422.7
oleic acid diethanolamide 93-83-4 2 0.00155186 1442.27

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2018 JKLM ENERGY LLC 944,435.00 252 0.00 0 0.00 0
2019 JKLM ENERGY LLC 704,775.00 312 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 JKLM ENERGY LLC Drill Cuttings 628.50 Tons LANDFILL 301358
2016 JKLM ENERGY LLC Produced Fluid 448.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Other Oil & Gas Wastes 359.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Drilling Fluid Waste 104.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 1,305.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Produced Fluid 18.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 917.67 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Drilling Fluid Waste 1,120.16 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Drill Cuttings 1,426.66 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 18.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Synthetic Liner Materials 20.22 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Produced Fluid 444.50 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Produced Fluid 424.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Produced Fluid 7,213.72 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Produced Fluid 37,017.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 173.35 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Drill Cuttings 17.29 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Unused Fracturing Fluid Waste 11.17 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 16.67 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 JKLM ENERGY LLC Synthetic Liner Materials 28.63 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 50.06 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Soil Contaminated by Oil & Gas Related Spills 58.44 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 2,333.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 JKLM ENERGY LLC Produced Fluid 980.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 JKLM ENERGY LLC Produced Fluid 3,361.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Soil Contaminated by Oil 58.44 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 3,355.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 JKLM ENERGY LLC Produced Fluid 728.34 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 JKLM ENERGY LLC Produced Fluid 661.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 JKLM ENERGY LLC Drilling Fluid Waste 91.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 284.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Waste Water Treatment Sludge 10.08 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 3.40 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 3,015.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Produced Fluid 80.00 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 JKLM ENERGY LLC Produced Fluid 947.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 JKLM ENERGY LLC Synthetic Liner Materials 6.43 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 36.67 Bbl REUSE (AT WELL PAD)
2019 JKLM ENERGY LLC Produced Fluid 2,623.33 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2499663 Primary Facility 2016-07-08 Routine/Partial Inspection No Violations Noted Preconstruction meeting for the Reese Hollow 115 well pad. JKLM, J.L. Watts and New Growth Resources present. Site will consist of a 350' x 500' well pad and improvement of an existing access road. New Growth Resources plans to begin logging/chipping operations in the next several days; J.L. Watts will begin site construction after clearing operations are completed. One permit, the Reese Hollow 115 4HU (105-21872) has been issued. Applications for the 1HU - 3HU, 5HU and 6HU are under review. TLT
2519938 Primary Facility 2016-09-16 Preoperation Inspection No Violations Noted Preoperation inspection prior to spudding 1HU - 6HU wells. Site construction is complete. E&S controls have been installed and disturbed areas seeded and mulched. TLT
2541155 Primary Facility 2016-11-30 Routine/Complete Inspection No Violations Noted
2548264 Primary Facility 2016-12-29 Routine/Partial Inspection No Violations Noted Partial inspection. The site was snow covered. Drilling of the 1HU - 6HU topholes was completed in November. Site is being used to store equipment and materials in anticipation of the arrival of the H&P 500 rig. Materials on site are stored in containment. Sediment traps were frozen over and snow covered. Some vegetation was visible above the snow cover on the topsoil stockpiles and well pad cut slope. No violations noted. TLT
2548981 Primary Facility 2016-12-28 Routine/Complete Inspection No Violations Noted
2549710 Primary Facility 2017-01-05 Routine/Complete Inspection No Violations Noted
2580945 Primary Facility 2017-04-10 Routine/Complete Inspection No Violations Noted
2601568 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted
2621814 Primary Facility 2017-07-06 Drilling/Alteration No Violations Noted
2626412 Primary Facility 2017-08-10 Routine/Complete Inspection No Violations Noted
2665726 Primary Facility 2017-11-21 Routine/Complete Inspection No Violations Noted A routine inspection was conducted at the JKLM Reese Hollow 115 well pad (ESX29-105-16-0003) located in Sweden Twp., Potter Co. on November 21, 2017 @1235 hours. Keane Group, Inc. was onsite conducting stimulation activities on the 6HU well (API#10521874). Scott West, a Consultant for JKLM, was present onsite for the inspection. Mr. West contacted Mr. Jon Manuel, he arrived onsite after fluid exhibiting high conductivity was discovered off containment.

Fluid was observed along the western side of the pad containment. The fluid level was up to the top of the rig matting. An Oakton Multi-Parameter PCSTestr 35 was used to test the field conductivity of the fluid in containment at "Or" or >20.00 mS/cm (see Photo#1). Photos #2 and #3 show the level of fluid in the primary containment. A puddle just off containment (see photo #4), on the west side of the pad, had a field tested conductivity of "Or" or >20.00 mS/cm (see photo #5).

The pollutional material was observed spilling out of the corner of the pad contain

2667065 Primary Facility 2017-12-04 Routine/Complete Inspection No Violations Noted At the time of this inspection this well had not been stimulated and was not being prepped for stimulation. No determined date has been established as to when the stimulation process will begin.
2668879 Primary Facility 2017-12-07 Routine/Complete Inspection No Violations Noted I arrived on site with Clark Smith of the Environmental Cleanups program and was met by Tyler McConnell of JKLM. We were there to follow up on the containment violations and release noted in an 11/21 inspection by Elizabeth Niles, WQS for the Oil & Gas program. We proceeded to the northwest corner of the pad to the level spreader and sediment trap where Ellie noted the high conductance fluid both in and outside the containment. We noted that the sediment trap had obviously been excavated to an unspecified depth; the water in the trap showed conductance of .63 mS/cm and had frozen enough to walk on. A small amount of slushy water (1-2 gallons) in the containment corner had conductance that read as "OR" on my meter (over 20 mS/cm). Tyler pointed out a vac truck in this area, and told us they had one on the opposite corner as well, as both spots were low spots where water collects. Tyler informed me that JKLM had had 2 of their employees on location during all operations since the incident, as well as uti
2679868 Primary Facility 2018-01-08 Routine/Complete Inspection No Violations Noted At the time of this inspection this well had been hydraulically fractured( stimulated). This well is not producing and is not connected to a gas sales line. The 9 5/8" x 13 3/8" annulus is vented and open and was tested for gas with a gas meter with no gas detected. The 5 1/2" x 9 5/8" annulus was also vented and was closed. This annulus was also tested with no gas detected. There were no violations noted at this inspection.
2694188 Primary Facility 2018-02-12 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection inspected the JKLM Reese Hollow 115 well pad located in Sweden Twp., Potter Co. on 2/12/2018 @1130 hours. Scott West, JKLM was present for the inspection. JKLM is in the process of pulling up the pad-wide containment. Approximately ¼ of the containment was remaining during the inspection. A large pile of snow was observed stockpiled on the remaining containment. Mr. West stated they are using two gas busters onsite to melt the snow. The recovered liquids are being stored in the Aboveground Storage Tank (AST) onsite, awaiting transfer to the frack at the Headwaters 145 site. Any recovered solids are being placed in residual waste containers awaiting transfer to a disposal facility.

Due to recent weather the pad surface is a mix of large puddles, ice and snow. The field conductivity of the large puddles at the center of the pad were ~2.0 mS/cm. A vac truck was in the process of removing the puddles. The standing fluid in the remaining containment had a field conducti

2703305 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was not in production. This well was temp. shut in for work being done on the annulus vents. The annulus vent lines on the following annulus 20x13,13x9 and 9x5 were being put in place on the wellhead assembly at the time of this inspection.
2719813 Primary Facility 2018-04-17 Routine/Complete Inspection No Violations Noted At the time of this inspection the well was stimulated(Hydraulic fractured) and was temp. shut-in. The well was being set up for production.
2721131 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted Some activity on pad when I arrived. Many puddles present on the pad, with conductivity ranging from .35-.90 mS/cm. AST still present on the pad, filled to within 8-9' of the top. Some water had collected in the secondary tank (4-6"); I recommend that it be vacced ASAP to maintain leak detection in this tank. I was unable to locate any well tags; I recommend that tags be affixed ASAP. If tags were present, I recommend that the tags be made more visible.
2736578 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted At the time of this inspection flow back was ongoing
2741920 Primary Facility 2018-06-14 Routine/Complete Inspection Violation(s) Noted The DEP conducted a ROUTINE inspection of the JKLM – Reese Hollow 115 well pad located in Sweden Twp, Potter Co. on 6/14/2018 @1100 hours. The weather was 70 degrees, sunny, 38% humidity and winds WNW 20 mph. The site appears to be setup for flowback activity. The weekly E&S site inspection was last conducted on 6/14/2018 with the comment “housekeeping remains an issue”.

As of today’s inspection, numerous puddles were observed on the pad surface. Standing water was observed on the pad surface along the edge of the gas buster containment. The Electrical Conductivity was field measured With an Oakton Multiparameter PCSTestr and found to be 18.90mS/cm (see attached photo #3 and #4). A smaller “duck pond” containment was located ~1’ away from the gas buster containment. Fluid in the duck pond had a field measured conductivity of 6.72mS/cm(see photo #5). Fluid in the gas buster containment had a field measured conductivity of “Or” or >20.00 mS/cm (see photo #6). The volume is unknown, but it is estimated the rel

2748297 Primary Facility 2018-06-27 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. The Flow back process(cleaning out the well of excess hydraulic fracturing water) had been completed. The annulus vent 9 5/" x 13 3/8" detected a combustable gas reading. During a discussion with Jake Long ,a JKLM Engineer, he informed me that as a result of high pressures and temperatures going through the well during flow back it is not uncommon to see a combustable gas reading on different annulus vents until the well stabilizes the high pressures and temperatures. The gas %(percentage) reading is in the findings section of this inspection. Annulus vent monitoring will be ongoing until the well stabilizes its pressures and temperatures.
2749626 Primary Facility 2018-07-09 Administrative/File Review Violation(s) Noted An administrative inspection was conducted 7/9/2018 in response to receipt of results from sample 4427-162 collected 6/14/2018. Inspection record #2741920, dated 6/14/2018 noted "numerous puddles were observed on the pad surface. Standing water was observed on the pad surface along the edge of the gas buster containment. The Electrical Conductivity was field measured With an Oakton Multiparameter PCSTestr and found to be 18.90mS/cm." Sample 4427-162 was collected from the fluid on the pad surface with a field measured conductivity of 18.60mS/cm and submitted to the DEP laboratory for SAC 942 analysis.

On 7/6/2018 the analytical report results,for the sample collected on 6/14/2018, was received by the DEP. A review of the results indicates the presence of elevated barium, strontium, and chlorides. This constitutes a release of a regulated substance.

Violations of the following regulations are cited at this time.

25 Pa Code 78a.56(a) regarding Temporary Storage 35 PS § 691.402 (Potential to Pollute Waters

2759047 Primary Facility 2018-07-30 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. Flow back, the last part of well development before the well is put intoproduction ended on 6-12-18. Combustible gas was detected on the 9 5/8" x 13 3/8" annulus vent. This is not uncommon after flow back and going into production as residual flow back will continue for an unspecified amount of time . No violations were noted at this inspection.
2762461 Primary Facility 2018-08-09 Compliance Evaluation Pending The DEP conducted a Follow-Up Inspection (FUI) at the JKLM Reese Hollow 115 well site located in Sweden Twp., Potter Co. on 8/9/2018 @1030 hours. The weather was 74°, Sunny, Humidity 62%, winds WNW 8mph. Korey Starkey, DEP Env Trainee was present for the inspection.

The well pad is currently setup for flowback activities. A damp area and a small puddle were observed along the front edge of the gas buster containment. The electrical conductivity was field measured with an Oakton PCSTestr 50 and found to be 2.2 mS/cm(Photo#3). Fluid in the gas buster containment had a field measured conductivity of 1700 µS/cm. Numerous patches were observed in the gas buster containment(Photo#4). A vac truck driver onsite was notified of the puddle, exhibiting elevated conductivity, along the front edge of the gas buster containment and the fluid was removed. A violation of 25 Pa Code 78a.66(b)(1)(i) cited 6/14/2018 (IR#2741920) is CORRECTED at this time. Violations of 78a.56(a), CSL 402 and SWMA 301 cited 7/9/2018 (IR#27496

2765814 Primary Facility 2018-08-20 Routine/Complete Inspection Pending Truck traffic on the site was steady, with water trucks loading at the MASS to transport water to the Headwaters 142 for the frac. Water in the containment around the loading area showed conductance of 4.25 mS/cm, and was within 1-2" of the top of the berm. I noted several puddles on the pad, mostly to the west and north of the well heads, that showed conductance of 2.45-3.05 mS/cm. Rob Bowens of JKLM was on the site, and told me that the vac truck that had been working at the 117 pad would be coming to the 115 next. Violations are pending from an 8/9/18 inspection, including 78a.56, CSL 402, and SWMA 301.
2778074 Primary Facility 2018-09-21 Administrative/File Review Violation(s) Noted An administrative inspection was conducted 9/21/2018 in response to receipt of results from sample 4427-167 collected 8/9/2018. Inspection record #2762461, dated 8/9/2018 noted "A puddle off of the NW corner of the AST containment had a field measured conductivity of Over Range (>19.99mS/cm)". Sample 4427-167 was collected from the puddle of Over Range fluid, off the NW side of the AST containment, and submitted to the DEP laboratory in Harrisburg for SAC 942 analysis.

On 9/21/2018 the analytical report results,for the sample collected on 8/9/2018, was received by the DEP. A review of the results indicates the presence of elevated barium and chlorides. This confirms a release of a regulated substance.

Violations of the following regulations are cited at this time against the 1HU well permit.

25 Pa Code 78a.56(a) regarding Temporary Storage 35 PS § 691.402 (Potential to Pollute Waters of then Commonwealth) 35 PS § 6018.301 SWMA

2803023 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are four (4) annulus vents openly venting on this well. No venting was noted at this inspection. No violations noted at this inspection.
2813291 Primary Facility 2018-12-11 Routine/Complete Inspection Outstanding Violations - Viols Req'd The Department of Environmental Protection (DEP) conducted a routine inspection of the JKLM - Reese Hollow 115 well pad located in Sweden Twp, Potter Co. on 12/11/2018 @1145 hours. The weather was 25 degrees, partly sunny, 2-4 inches of snow on the ground. Winds WSW @10mph, 68% humidity. NORtech personnel were present onsite during the inspection.

The well site appears to be setup for production. 6 wells were observed onsite. The pad surface was covered by snow and ice. No issues were observed. No new violations are noted at this time. I departed the site at 1245 hours.

The following violations remain OUTSTANDING against the 1H well from inspection report #2778074 dated 9/21/2018. 25 Pa Code 78a.56(a) regarding Temporary Storage 35 PS § 691.402 (Potential to Pollute Waters of then Commonwealth) 35 PS § 6018.301 SWMA

2813831 Primary Facility 2018-12-11 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) conducted a routine inspection of the JKLM - Reese Hollow 115 well pad located in Sweden Twp, Potter Co. on 12/11/2018 @1145 hours. The weather was 25 degrees, partly sunny, 2-4 inches of snow on the ground. Winds WSW @10mph, 68% humidity. NORtech personnel were present onsite during the inspection.

The well site appears to be setup for production. 6 wells were observed onsite. The pad surface was covered by snow and ice. No issues were observed. No new violations are noted at this time. I departed the site at 1245 hours.

The following violations remain OUTSTANDING against the 1H well from inspection report #2778074 dated 9/21/2018, awaiting approval of the Final Report/Remedial Action Completion Report by the ECB. 25 Pa Code 78a.56(a) regarding Temporary Storage 35 PS § 691.402 (Potential to Pollute Waters of then Commonwealth) 35 PS § 6018.301 SWMA

2820515 Primary Facility 2018-12-31 Administrative/File Review No Violations Noted The state wide health final report approval for the release noted in the August 9, 2018 inspection report or considered closed

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2741920 819823 2018-06-14 2018-08-09 78a66(b)1i Environmental Health & Safety
2749626 821940 2018-07-09 2018-08-09 CSL 402(b) Environmental Health & Safety On 7/6/2018 the analytical report results,for the sample collected on 6/14/2018, was received by the DEP. A review of the results indicates the presence of elevated barium, strontium, and chlorides. This constitutes a release of a regulated substance.
2749626 821941 2018-07-09 2018-08-09 78a66(b)1i Environmental Health & Safety On 7/6/2018 the analytical report results,for the sample collected on 6/14/2018, was received by the DEP. A review of the results indicates the presence of elevated barium, strontium, and chlorides. This constitutes a release of a regulated substance.
2749626 821942 2018-07-09 2018-08-09 78a56(a) Environmental Health & Safety On 7/6/2018 the analytical report results,for the sample collected on 6/14/2018, was received by the DEP. A review of the results indicates the presence of elevated barium, strontium, and chlorides. This constitutes a release of a regulated substance
2749626 821943 2018-07-09 2018-08-09 SWMA 301 Environmental Health & Safety On 7/6/2018 the analytical report results,for the sample collected on 6/14/2018, was received by the DEP. A review of the results indicates the presence of elevated barium, strontium, and chlorides. This constitutes a release of a regulated substance.
2778074 828584 2018-09-21 2018-12-20 CSL 402(b) Environmental Health & Safety Puddles were observed on the pad surface with an elevated field measured conductivity. A violation of 35 PS 691.402 Potential to pollute waters of the Commonwealth is cited at this time.
2778074 828585 2018-09-21 2018-12-20 78A56(A)5_ Environmental Health & Safety Puddles were observed on the pad surface with an elevated field measured conductivity. A violation of 25 Pa Code 781.56(a) regarding temporary storage is cited at this time.
2778074 828586 2018-09-21 2018-12-20 SWMA 301 Environmental Health & Safety Puddles were observed on the pad surface with an elevated field measured conductivity. A violation of 35 PS SWMA cited at this time.
2813291 835896 2018-12-11 2018-12-20 CSL 402(b) Environmental Health & Safety Puddles were observed on the pad surface with an elevated field measured conductivity. A violation of 35 PS 691.402 Potential to pollute waters of the Commonwealth is cited at this time.
2813291 835897 2018-12-11 2018-12-20 78A56(A)5_ Environmental Health & Safety Puddles were observed on the pad surface with an elevated field measured conductivity. A violation of 25 Pa Code 781.56(a) regarding temporary storage is cited at this time.
2813291 835898 2018-12-11 2018-12-20 SWMA 301 Environmental Health & Safety Puddles were observed on the pad surface with an elevated field measured conductivity. A violation of 35 PS SWMA cited at this time.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
819823 364919 NOV - Notice of Violation 2018-08-09
819823 365442 NOV - Notice of Violation 2018-08-09
821940 365442 NOV - Notice of Violation 2018-08-09
821941 365442 NOV - Notice of Violation 2018-08-09
821942 365442 NOV - Notice of Violation 2018-08-09
821943 365442 NOV - Notice of Violation 2018-08-09
828584 367663 NOV - Notice of Violation 2018-12-20
828585 367663 NOV - Notice of Violation 2018-12-20
828586 367663 NOV - Notice of Violation 2018-12-20

For data sources see[8]

References