37-105-21923

Well Details

Well ID: 37-105-21923
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Ulysses Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 154230
Farm/Lease Name: HEADWATERS 146-2HU
License Status:
Spud Date:
Permit Date: 2018-07-26
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.857365
Longitude: -77.735086

For data sources see[1][2][3]

Well History

Date Event
2018-07-26 New Permit Application
2018-10-04 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 JKLM ENERGY LLC Drill Cuttings 671.96 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 52.50 Bbl REUSE (AT WELL PAD)
2019 JKLM ENERGY LLC Produced Fluid 1,854.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 398.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Produced Fluid 461.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 535.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Synthetic Liner Materials 27.32 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Drill Cuttings 713.66 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Soil Contaminated by Oil 27.11 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 65.00 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 JKLM ENERGY LLC Waste Water Treatment Sludge 31.60 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Soil Contaminated by Oil & Gas Related Spills 27.11 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 4,212.50 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2748164 Primary Facility 2018-07-02 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the JKLM headwaters 146 well pad located in you Ulysses Township, Potter County on July 2, 2018 at 1145 hrs. The weather was 85 degrees, sunny, humidity 58%, winds SSW 10 mph.

The access road to the well pad is 9700 feet long. The most of the rock-lined ditch, along the access road, appears to be installed. JL Watts was observed spreading topsoil and working on completing the access road. E.J. Breneman LP was soil cementing the pad surface. Sediment Trap 1 (ST-1) was observed off the southwest pad corner and Sediment Trap 2 (ST-2) was observed off the southeast pad corner. Sumps will be installed in the southeast and southwest corners after completion of the pad surface.

Ditches surrounding the pad surface are rough graded and draining to the installed sediment traps. Topsoil will need to be laid before the TRM matting can be installed, and the ditches completed. The topsoil stockpile adjacent to the pad was observed stabilized with mulch.

New Growth Resources p

2756272 Primary Facility 2018-07-25 Preoperation Inspection No Violations Noted The DEP conducted a routine inspection of the JKLM headwaters 146 well pad located in you Ulysses Township, Potter County on July 2, 2018 at 1145 hrs. The weather was 85 degrees, sunny, humidity 58%, winds SSW 10 mph.

The access road to the well pad is 9700 feet long. The most of the rock-lined ditch, along the access road, appears to be installed. JL Watts was observed spreading topsoil and working on completing the access road. E.J. Breneman LP was soil cementing the pad surface. Sediment Trap 1 (ST-1) was observed off the southwest pad corner and Sediment Trap 2 (ST-2) was observed off the southeast pad corner. Sumps will be installed in the southeast and southwest corners after completion of the pad surface.

Ditches surrounding the pad surface are rough graded and draining to the installed sediment traps. Topsoil will need to be laid before the TRM matting can be installed, and the ditches completed. The topsoil stockpile adjacent to the pad was observed stabilized with mulch.

New Growth Resources p

2756304 Primary Facility 2018-07-25 Preoperation Inspection No Violations Noted The DEP conducted a routine inspection of the JKLM headwaters 146 well pad located in you Ulysses Township, Potter County on July 2, 2018 at 1145 hrs. The weather was 85 degrees, sunny, humidity 58%, winds SSW 10 mph.

The access road to the well pad is 9700 feet long. The most of the rock-lined ditch, along the access road, appears to be installed. JL Watts was observed spreading topsoil and working on completing the access road. E.J. Breneman LP was soil cementing the pad surface. Sediment Trap 1 (ST-1) was observed off the southwest pad corner and Sediment Trap 2 (ST-2) was observed off the southeast pad corner. Sumps will be installed in the southeast and southwest corners after completion of the pad surface.

Ditches surrounding the pad surface are rough graded and draining to the installed sediment traps. Topsoil will need to be laid before the TRM matting can be installed, and the ditches completed. The topsoil stockpile adjacent to the pad was observed stabilized with mulch.

New Growth Resources p

2817661 Primary Facility 2018-12-13 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) conducted a routine inspection of the JKLM Headwaters 146 well pad located in Ulysses Twp, Potter Co. on 1213/2018 @1330 hours. The weather was 29 degrees, overcast, 2-4" of snow on the ground, winds SSE@8mph, humidity 89%.

JKLM Company man Ron Burdick was present onsite for the inspection. Onsite activity consisted of the falcon rig "batch drilling" two wells onsite. The rig is currently drilling the 1st intermediate string casing of the 2HU well at a depth of 1,491'. The containment around the rig and berms appeared to be intact and functional. No staining or melted areas were observed around the perimeter of the containment. No violations are noted at this time. I departed the site at 1500 hours.

2822965 Primary Facility 2019-01-07 Routine/Complete Inspection No Violations Noted At the time of this inspection this well is vertical drilled only. Conductor casing that is 20" x 120' was set on 10-3-18 thru 10-4-18. The surface casing that is 13 3/8" x 559' was set on 11-16-18 thru 11-18-18. The 1st intermediate casing that is 10 3/4" x 2620' was set on 12-14-18. The 2nd intermediate that is 7 5/8" x 8385' was set on 12-23-18 thru 12-24-18. No violations were noted at this inspection.
2848254 Primary Facility 2019-03-04 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was top holed only ( vertically drilled ). Well has not been laterally drilled. The conductor that is 20" in diameter by 120' in length was drilled and set starting on 10-3-18 and completed on 10-4-18. The surface casing that is 13 3/8" diameter and 559' in length was completed on 11-18-18. The 1st intermediate that is 10 3/4" in diameter and 2,623' in length was completed on 12-15-18. The 2nd intermediate that is 7 5/8" in diameter and 8,385' in length was completed on 12-24-18. The conductor by surface casing is the only annulus vent that is vented to surface. The other annulus have vent valves attached but are not vented outside of the casing. No violations noted at this inspection.