If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-105-21928 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.859964,"lon":-77.722955,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Potter | |
Municipality: Hector Township | |
Operator Name: JKLM ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: HEADWATERS 147-7V | |
License Status: | |
Spud Date: | |
Permit Date: 2018-11-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.859964 | |
Longitude: -77.722955 |
Date | Event |
---|---|
2018-11-05 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2820307 | Primary Facility | 2018-12-27 | Routine/Complete Inspection | No Violations Noted | The DEP attended a preconstruction meeting for the JKLM Headwaters 147 well pad located in Hector/Ulysses Twp, Potter Co. on 12/27/2018 @1300 hours.
The project consists of a well pad and access road. The watershed designation is listed as HQ CWF, MF. At this time JKLM is only planning on constructing the access road and topsoil stockpile area to facilitate construction of the HW 148 well pad. A possible start date of next week was discussed. No violations are noted at this time. I departed the site at 1400 hours. |
For data sources see[5]