| Well ID: 37-105-21929 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.846933,"lon":-77.717883,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Potter | |
| Municipality: Hector Township | |
| Operator Name: JKLM ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: HEADWATERS 148-7V | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2018-11-05 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Vertical Well | |
| Conservation: Yes | |
| Latitude: 41.846933 | |
| Longitude: -77.717883 |
| Date | Event |
|---|---|
| 2018-11-05 | New Permit Application |
For data sources see[4]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 2820312 | Primary Facility | 2018-12-27 | Routine/Complete Inspection | No Violations Noted | The DEP attended a preconstruction meeting for the JKLM Headwaters 148 well pad located in Ulysses Twp, Potter Co. on 12/27/2018 @1300 hours.
The project consists of a well pad and access road. The watershed designation is listed as HQ CWF, MF. A possible start date of next week was discussed. Due to clearing activities for the HW 146 to 148 pipeline, clearing of the LOD for the HW 148 well pad will begin at the well pad and proceed towards the access road intersection with the HW 146 access road. Please ensure any resources within, or adjacent to, the project area are clearly marked. No violations are noted at this time. I departed the site at 1400 hours. |
For data sources see[5]